Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 25157 S 17th St Philadelphia Pa 191036230 Ez interior demolition- for the interior demolition of non load-bearing partition walls and ceilings as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: May 10, 2016 Contractor: Mmb Contractors Inc Client: Medtower Limited Partners | Permit type: Demolition permit | Permit status: Completed | Completion date: October 28, 2016 | Permit id: 690945 | |||||
SCORE 100 25157 S 17th St Philadelphia Pa 191036230 Installation of the new diffusers. For the installation if new ductwork, registers grilles diffusers, and warm-air appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Date: September 5, 2017 Contractor: Mmb Contractors Inc Client: Medtower Limited Partners | Permit type: Mechanical permit | Permit status: Active | Completion date: November 2, 2017 | Permit id: 813407 | |||||
SCORE 100 25157 S 17th St Philadelphia Pa 191036230 Replace damaged (28)doors inside the bathrooms with new door and new lock. Date: March 20, 2015 Contractor: Mmb Contractors Inc Client: Medtower Limited Partners | Permit type: Alteration permit | Permit status: Completed | Completion date: July 7, 2015 | Permit id: 597412 | |||||
SCORE 100 25157 S 17th St Philadelphia Pa 191036230 Alterations: interior plumbing; 2nd floor; fixtures - the installation will comply with the philadephia plubming code 2004 Date: September 28, 2017 Contractor: Mmb Contractors Inc Client: Medtower Limited Partners | Permit type: Plumbing permit | Permit status: Active | Completion date: November 2, 2017 | Permit id: 813405 | |||||
SCORE 100 120709 Chestnut St Philadelphia Pa 191074101 Administrative permit for a temporary certificate of occupancy for the 2nd floor as per inspectors approval. Date: April 30, 2015 Contractor: Mmb Contractors Inc Permit type: Administrative permit | Permit status: Completed | Completion date: May 6, 2015 | Permit id: 606963 | |||||
SCORE 100 1500 John F Kennedy Blvd Philadelphia Pa 191029997 Alterations: interior plumbing;concourse suite 2b; for the creation of two (2) commercial tenant spaces from one (1) existing space -the installation will comply with the philadephia plubming code 2004 Date: August 7, 2017 Contractor: Mmb Contractors Inc Client: Crown Two Penn Center Ass | Client Company: Asi Management | Permit type: Plumbing permit | Permit status: Completed | Completion date: November 3, 2017 | Permit id: 803682 | |||||
SCORE 100 Date: September 23, 2011 Contractor: Mmb Contractors Inc Client: Wasilczuk Andrzej J Wasilczuk Renata | Permit type: Plumbing permit | Permit status: Completed | Completion date: October 5, 2011 | Permit id: 364722 | |||||
SCORE 100 142024 Walnut St Philadelphia Pa 191024016 Amend building permit number 4890 to reflect facade changes as per approved plans and pcpc approvals. Date: December 6, 2013 Contractor: Mmb Contractors Inc Client: Fourteen Twenty Assoc L P | Client Company: A S I Management | Permit type: Administrative permit | Permit status: Completed | Completion date: July 8, 2014 | Permit id: 499651 | |||||
SCORE 100 1524 Walnut St Philadelphia Pa 191023601 Alteration: interior plumbing for a 1st floor restaurant. To comply with the philadelphia plumbing code, 2004. Date: April 12, 2016 Contractor: Mmb Contractors Inc Client Company: A S I Mgt | Permit type: Plumbing permit | Permit status: Completed | Completion date: July 19, 2016 | Permit id: 659669 | |||||
SCORE 100 1611 Walnut St Philadelphia Pa 191035402 Kitchen sink utility sink and floor drain. All installations in accordance with 2004 ppc Date: November 21, 2017 Contractor: Mmb Contractors Inc Permit type: Plumbing permit | Permit status: Active | Completion date: November 21, 2017 | Permit id: 833945 | |||||
SCORE 100 Date: May 3, 2011 Contractor: Mmb Contractors Inc Client: M M B Contractors Inc | Permit type: Plumbing permit | Permit status: Completed | Completion date: July 19, 2011 | Permit id: 338898 | |||||
SCORE 100 131317 Walnut St Philadelphia Pa 191074517 Installation of a new watts model lf909 4" backflow preventer. The installation will comply with the philadephia plubming code 2004 Date: April 12, 2017 Contractor: Mmb Contractors Inc Client: Philadelphia Building Ass | Permit type: Plumbing permit | Permit status: Completed | Completion date: July 6, 2017 | Permit id: 774599 | |||||
SCORE 100 1524 Walnut St Philadelphia Pa 191023601 Ez interior demolition- for the interior demolition of non load-bearing partition walls and ceilings as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: November 17, 2015 Contractor: Mmb Contractors Inc Client Company: A S I Mgt | Permit type: Demolition permit | Permit status: Completed | Completion date: May 9, 2016 | Permit id: 652586 | |||||
SCORE 100 142024 Walnut St Philadelphia Pa 191024016 Level ii alterations to include facade alteration, replacement of the glass in the entry door in building. Lobby wall replace floor tiles as per approved plans. Date: August 29, 2013 Contractor: Mmb Contractors Inc Client: Fourteen Twenty Assoc L P | Client Company: A S I Management | Permit type: Alteration permit | Permit status: Completed | Completion date: May 27, 2014 | Permit id: 489000 | |||||
SCORE 100 142024 Walnut St Philadelphia Pa 191024016 Interior alterations as per plans. For issuance of certificate of occupancy. Separate permits required for electrical, mechanical, plumbing, and fire suppression work. Date: December 9, 2014 Contractor: Mmb Contractors Inc Client: Fourteen Twenty Assoc L P | Client Company: A S I Management | Permit type: Alteration permit | Permit status: Completed | Completion date: February 19, 2015 | Permit id: 573168 | |||||
SCORE 100 142024 Walnut St Philadelphia Pa 191024016 Install water pipe and valve for future tenant fit out - the installation will comply with the philadephia plumbing code 2004 Date: July 13, 2017 Contractor: Mmb Contractors Inc Client: Fourteen Twenty Assoc L P | Client Company: A S I Management | Permit type: Plumbing permit | Permit status: Completed | Completion date: October 23, 2017 | Permit id: 799283 | |||||
SCORE 100 Date: May 7, 2012 Contractor: Mmb Contractors Inc Client: Sarkisian Holdings Llc | Permit type: Plumbing permit | Permit status: Completed | Completion date: October 21, 2015 | Permit id: 403551 | |||||
SCORE 100 1524 Walnut St Philadelphia Pa 191023601 Install a 3 4" backflow prevention isolation device - pwd pre-approval not required - the device must comply with table 608. 1 of the 2009 international plumbing code Date: April 12, 2016 Contractor: Mmb Contractors Inc Client Company: A S I Mgt | Permit type: Plumbing permit | Permit status: Completed | Completion date: June 3, 2016 | Permit id: 683430 | |||||
SCORE 100 Date: October 16, 2013 Contractor: Mmb Contractors Inc Client Company: A S I Mgt | Permit type: Plumbing permit | Permit status: Completed | Completion date: November 14, 2015 | Permit id: 500550 | |||||
SCORE 100 1524 Walnut St Philadelphia Pa 191023601 Ez interior demolition- for the interior demolition of non load-bearing partition walls and ceilings as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: March 21, 2016 Contractor: Mmb Contractors Inc Client Company: A S I Mgt | Permit type: Demolition permit | Permit status: Completed | Completion date: May 9, 2016 | Permit id: 678029 | |||||
SCORE 100 1524 Walnut St Philadelphia Pa 191023601 Interior alterations to existing space #5 to include partial demolition and construction of new non-load bearing interior partirions to create a retail sales of wearing apparel, as per approved plans. Date: March 29, 2016 Contractor: Mmb Contractors Inc Client Company: A S I Mgt | Permit type: Alteration permit | Permit status: Completed | Completion date: July 18, 2016 | Permit id: 678033 | |||||
SCORE 100 1524 Walnut St Philadelphia Pa 191023601 Plumbing alterations in retail space #5 (pearle vision) per the approved plans - the "as noted" pipe sizing on sanitary isometric drawing sheet ecc1 indicates the minimum sizes that must be used to comply with table p-904. 4 and section p-1105 of the philadelphia plumbing code 2004 Date: April 18, 2016 Contractor: Mmb Contractors Inc Client Company: A S I Mgt | Permit type: Plumbing permit | Permit status: Completed | Completion date: June 29, 2016 | Permit id: 678788 | |||||
SCORE 100 160105 Walnut St Philadelphia Pa 191022916 Remove and replace windows on first floor. All windows within existing openings. Work permit plans approved by philadelphia city planning commission. Date: July 12, 2016 Contractor: Mmb Contractors Inc Client: Medarts Properties Limite | Permit type: Alteration permit | Permit status: Completed | Completion date: January 23, 2017 | Permit id: 691987 | |||||
SCORE 100 Date: May 13, 2016 Contractor: Mmb Contractors Inc Client: Medarts Properties Limite | Permit type: Demolition permit | Permit status: Completed | Completion date: October 28, 2016 | Permit id: 691986 | |||||
SCORE 100 190105 Walnut St Philadelphia Pa 191034605 Remove & cap existing drain and water line for the kitchen sink, install water line for the new location kitchen and reuse existing drain, cap drains and water line for the water closet, relocate drain and water line for the washer cap 3 4" gas line Date: February 7, 2014 Contractor: Mmb Contractors Inc Client: Rittenhouse Plaza Inc | Permit type: Plumbing permit | Permit status: Completed | Completion date: August 21, 2014 | Permit id: 518760 | |||||
SCORE 100 726 Sansom St Philadelphia Pa 191063207 New backflow preventor (commercial)the installation will comply with the philadelphia plumbing code 2004 Date: October 12, 2017 Contractor: Mmb Contractors Inc Permit type: Plumbing permit | Permit status: Completed | Completion date: November 2, 2017 | Permit id: 823728 | |||||
SCORE 100 21121 N 13th St Philadelphia Pa 191071616 Install new backflow preventer (office bldg)the installation will comply with the philadelphia plumbing code 2004 Date: March 1, 2016 Contractor: Mmb Contractors Inc Permit type: Plumbing permit | Permit status: Completed | Completion date: October 13, 2016 | Permit id: 673323 | |||||
SCORE 100 105 S 22nd St Philadelphia Pa 191034310 Installation of new backflow valve. The installation will comply with the philadephia plubming code 2004 Date: August 2, 2016 Contractor: Mmb Contractors Inc Client: Connectcom Inc | Permit type: Plumbing permit | Permit status: Completed | Completion date: April 19, 2017 | Permit id: 711961 | |||||
SCORE 100 722 N 2nd St Philadelphia Pa 191233008 Installation of the 3-department sink with grease trap, installation of the preparation sink and hand sink with garbage disposal Date: March 22, 2011 Contractor: Mmb Contractors Inc Client: Slam Mohammed N | Permit type: Plumbing permit | Permit status: Completed | Completion date: May 30, 2015 | Permit id: 331044 | |||||
SCORE 100 2129 Chestnut St Philadelphia Pa 191033146 Installation of new backflow valve. "self-certifications are no longer permitted" - "all excavations and plumbing trenches in excess of 5 feet in depth must have approved shoring in place at the time of inspection" Date: August 15, 2016 Contractor: Mmb Contractors Inc Client: Corporate Facilities Inc | Permit type: Plumbing permit | Permit status: Completed | Completion date: September 21, 2016 | Permit id: 714828 | |||||
SCORE 100 18 John F Kennedy Blvd Philadelphia Pa 191032925 Relocate existing line from existing stack and install new fixture Date: May 16, 2011 Contractor: Mmb Contractors Inc Client: Jfk Investment Associates | Permit type: Plumbing permit | Permit status: Completed | Completion date: August 15, 2011 | Permit id: 341185 | |||||
SCORE 100 1802 Chestnut St Philadelphia Pa 191034902 Installation of the backflow preventer (mixed use)the installation will comply with the philadelphia plumbing code 2004 Date: May 10, 2016 Contractor: Mmb Contractors Inc Client: Leelo Properties Ltd | Permit type: Plumbing permit | Permit status: Expired | Completion date: January 7, 2017 | Permit id: 690940 | |||||
SCORE 100 1742 Market St Philadelphia Pa 191034113 Create new handicap bathroom from mop room,relocate small water heater and replace existing fixtures.(office space) the installation shall comply with the philadelphia plumbing code, 2004 Date: March 15, 2017 Contractor: Mmb Contractors Inc Permit type: Plumbing permit | Permit status: Completed | Completion date: May 15, 2017 | Permit id: 766884 | |||||
SCORE 100 120709 Chestnut St Philadelphia Pa 191074101 Alteration: interior plumbing; 4th floor (dental office) -the installation will comply with the philadelphia plumbing code 2004 Date: June 15, 2017 Contractor: Mmb Contractors Inc Permit type: Plumbing permit | Permit status: Completed | Completion date: August 31, 2017 | Permit id: 790152 | |||||
SCORE 100 120709 Chestnut St Philadelphia Pa 191074101 Demolition of the interior partition walls (non structural) Date: February 6, 2015 Contractor: Mmb Contractors Inc Permit type: Demolition permit | Permit status: Completed | Completion date: March 30, 2015 | Permit id: 589304 | |||||
SCORE 100 120709 Chestnut St Philadelphia Pa 191074101 Ez interior demolition- for the interior demolition of non load-bearing partition walls and ceilings as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: February 19, 2015 Contractor: Mmb Contractors Inc Permit type: Demolition permit | Permit status: Completed | Completion date: April 9, 2015 | Permit id: 591626 | |||||
SCORE 100 120709 Chestnut St Philadelphia Pa 191074101 Level ii interior alterations with a partial change of occupancy (no change in occupancy class) to create medical health and social services offices on the second floor of an existing seven story building as per approved plans. Existing building fully sprinklered. Water curtain required to be maintained at south exit stairtower per board of safety and fire prevention variance no. 2005-051. Separate permits required for any mep work Date: March 4, 2015 Contractor: Mmb Contractors Inc Permit type: Alteration permit | Permit status: Completed | Completion date: June 3, 2015 | Permit id: 591854 | |||||
SCORE 100 1417 Locust St Philadelphia Pa 191023810 Install new ada shower in existing room with 2" drain line (office bldg) Date: May 8, 2012 Contractor: Mmb Contractors Inc Client: Felchen 15 Lp | Client Company: Ephan Fellheimer Esq | Permit type: Plumbing permit | Permit status: Completed | Completion date: May 29, 2012 | Permit id: 403848 | |||||
SCORE 100 Date: April 18, 2017 Contractor: Mmb Contractors Inc Client: Felchen 15 Lp | Client Company: Ephan Fellheimer Esq | Permit type: Plumbing permit | Permit status: Completed | Completion date: May 15, 2017 | Permit id: 776194 | |||||
SCORE 100 1417 Locust St Philadelphia Pa 191023810 Install 3-sink for hot & cold water using existing sewer lines (office bldg) Date: August 18, 2014 Contractor: Mmb Contractors Inc Client: Felchen 15 Lp | Client Company: Ephan Fellheimer Esq | Permit type: Plumbing permit | Permit status: Completed | Completion date: November 3, 2014 | Permit id: 556409 | |||||
SCORE 100 1417 Locust St Philadelphia Pa 191023810 Install a watts lf909 3" backflow preventer-the installation will comply with the philadephia plubming code 2004 Date: April 24, 2017 Contractor: Mmb Contractors Inc Client: Felchen 15 Lp | Client Company: Ephan Fellheimer Esq | Permit type: Plumbing permit | Permit status: Completed | Completion date: May 15, 2017 | Permit id: 776199 | |||||
SCORE 100 1742 Market St Philadelphia Pa 191034113 Faucet replacement in kitchen pantry area (office space)the installation shall comply with the philadelphia plumbing code, 2004 Date: January 17, 2017 Contractor: Mmb Contractors Inc Permit type: Plumbing permit | Permit status: Completed | Completion date: April 19, 2017 | Permit id: 751843 | |||||
SCORE 100 1500 John F Kennedy Blvd Philadelphia Pa 191029997 Install new hand sink, mop sink, waste sink, coffee and ice maker and one indirect waste the installation will comply with the philadelphia plumbing code 2004 Date: July 23, 2015 Contractor: Mmb Contractors Inc Client: Crown Two Penn Center Ass | Client Company: Asi Management | Permit type: Plumbing permit | Permit status: Completed | Completion date: September 29, 2015 | Permit id: 620335 | |||||
SCORE 100 1500 John F Kennedy Blvd Philadelphia Pa 191029997 For a change in occupancy in suite 2 of an existing building. Work to include new interior non-bearing partitions, finishes and employee areas. Building shall be fully sprinklered. Separate permits required for mechanical, electrical, plumbing, and fire suppression systems. Date: June 30, 2015 Contractor: Mmb Contractors Inc Client: Crown Two Penn Center Ass | Client Company: Asi Management | Permit type: Alteration permit | Permit status: Completed | Completion date: December 4, 2015 | Permit id: 610988 | |||||
SCORE 100 120709 Chestnut St Philadelphia Pa 191074101 Relocate and install new sinks and toilets in bathrooms on the 2nd and 3rd floor-the installation will comply with the philadelphia plumbing code 2004 Date: March 6, 2015 Contractor: Mmb Contractors Inc Permit type: Plumbing permit | Permit status: Completed | Completion date: May 15, 2015 | Permit id: 594517 | |||||
SCORE 100 122533 Locust St Philadelphia Pa 191075414 Replace & reconnect 5-sinks, to existing drain lines & replace shut off valve for each sink (medical clinic) replace fixtures w no addl piping Date: June 20, 2014 Contractor: Mmb Contractors Inc Client: Afc Locust Realty Associa | Permit type: Plumbing permit | Permit status: Completed | Completion date: August 4, 2014 | Permit id: 544582 | |||||
SCORE 100 11 S Broad St Philadelphia Pa 191465024 Installation of the new backflow (commercial)the installation shall comply with the philadelphia plumbing code, 2004 Date: May 12, 2017 Contractor: Mmb Contractors Inc Permit type: Plumbing permit | Permit status: Completed | Completion date: July 7, 2017 | Permit id: 783423 | |||||
SCORE 100 Date: January 13, 2017 Contractor: Mmb Contractors Inc Permit type: Plumbing permit | Permit status: Completed | Completion date: January 19, 2017 | Permit id: 750123 | |||||
SCORE 100 1500 John F Kennedy Blvd Philadelphia Pa 191029997 For prepared food shop on concourse level (ste 2b) with other uses in the same building as previously approved, no sign on this permit, Date: June 24, 2016 Contractor: Mmb Contractors Inc Client: Crown Two Penn Center Ass | Client Company: Asi Management | Permit type: Use permit | Permit status: Completed | Completion date: June 24, 2016 | Permit id: 702523 | |||||
SCORE 100 1500 John F Kennedy Blvd Philadelphia Pa 191029997 Installlation of the new glass wall with the entry door. New corridor as shown on the plans. Separate permit required for certificate of occupancy Date: December 4, 2015 Contractor: Mmb Contractors Inc Client: Crown Two Penn Center Ass | Client Company: Asi Management | Permit type: Alteration permit | Permit status: Completed | Completion date: February 23, 2017 | Permit id: 652590 | |||||
SCORE 100 3821 Powelton Ave Philadelphia Pa 191042367 Installation of new backflow preventer as per water department approval Date: October 3, 2016 Contractor: Mmb Contractors Inc Client: Jc & Jd Llc | Permit type: Plumbing permit | Permit status: Completed | Completion date: October 17, 2016 | Permit id: 726476 | |||||
SCORE 100 1 S Broad St Philadelphia Pa 191101023 Interior plumbing alterations for a new tenant fit-out (ac moore) on the basement, 1st floor and mezzanine levels for the retail sale of consumer goods - the installation will comply with the approved plans and the philadelhia plumbing code 2004 Date: January 9, 2017 Contractor: Mmb Contractors Inc Client: L T B Limited Ptnship | Client Company: A S I Management | Permit type: Plumbing permit | Permit status: Completed | Completion date: April 6, 2017 | Permit id: 748195 | |||||
SCORE 100 1 S Broad St Philadelphia Pa 191101023 Repair broken cast iron pipe in the basement and one water closet and one lavy sink Date: February 3, 2014 Contractor: Mmb Contractors Inc Client: L T B Limited Ptnship | Client Company: A S I Management | Permit type: Plumbing permit | Permit status: Completed | Completion date: September 15, 2014 | Permit id: 518024 | |||||
SCORE 100 183539 S Broad St Philadelphia Pa 191482115 Installl new ada toilet room - water closet and wall sink Date: August 19, 2013 Contractor: Mmb Contractors Inc Client: Raj Land Lp | Permit type: Plumbing permit | Permit status: Completed | Completion date: April 8, 2014 | Permit id: 489992 | |||||
SCORE 100 8235 Bayard St Philadelphia Pa 191501701 Relocate tub drain, water drains (h&c), drain for vanity and toilet. 2nd floor bath: relocate tub drain, h&c water, vanity and toilet drains, kitchen sink drain and new cold and hot water Date: November 15, 2017 Contractor: Mmb Contractors Inc Client: Eagles Holding Partnershi | Permit type: Plumbing permit | Permit status: Active | Completion date: November 16, 2017 | Permit id: 830235 | |||||
SCORE 100 Date: November 14, 2014 Contractor: Mmb Contractors Inc Permit type: Plumbing permit | Permit status: Expired | Completion date: June 19, 2015 | Permit id: 574358 | |||||
SCORE 100 23941 N Broad St Philadelphia Pa 191071511 Level ii alterations (no change of occupancy) to existing four (4) story building to create opening for new elevator installation as per approved plans. Separate permit required from pa dept of labor and industry for elevator installation. Date: June 11, 2015 Contractor: Mmb Contractors Inc Permit type: Alteration permit | Permit status: Completed | Completion date: June 6, 2016 | Permit id: 607914 |