Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Remodel existing basement adding one bathroom sink and one floor drain. Enlarge egress windows. New boiler. 7 sf Client: Bridget Carlin,Robert Kanick | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: April 20, 2007 | Current use: Single family d | |||||
SCORE 99 New one car, 24 x 16 detached garage in rear yard of single-family residence. Scope of work includes electrical service change for 1 amp service to move panel to garage and install sub-panel on house. Client: Bridget Carlin,Robert Kanick | Applicant: Modafferi Construction, Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: October 22, 2008 | Current use: Single family d | |||||
SCORE 95 Installation of a flush mount grid-tied 4. 16kw photovoltaic system. Array to remain below ridge, inside below hips and rake edges, and above eave. See engineerfoots letter and drawings for specific information. ![]() ![]() Client: Bridget Carlin,Robert Kanick | Applicant: Solarcity Corporation | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 22, 2013 | Current use: Single family d | |||||
SCORE 100 Master suite remodel for single family detached dwelling. Scope includes reconfiguration of closet and bath space, addition of one window and replacement of others. No net change in plumbing fixtures. Client: Bridget Carlin,Robert Kanick | Applicant: Melton Construction, Inc | Permit type: Building, electrical | Permit status: Iss | Current use: Single family d | |||||
SCORE 95 Installation of a flush mount grid-tied 4. 16kw photovoltaic system. Array to remain below ridge, inside below hips and rake edges, and above eave. See engineerfoots letter and drawings for specific information. Client: Bridget Carlin | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 22, 2013 | Current use: Single family detached dwelling, existin | Permit id: Pmt2013-02485 | |||||
SCORE 95 Master suite remodel for single family detached dwelling. Scope includes reconfiguration of closet and bath space, addition of one window and replacement of others. No net change in plumbing fixtures. Client: Bridget Carlin | Permit type: Building, electrical, plumbing | Permit status: Cmp | Completion date: November 16, 2015 | Current use: Single family detached dwelling, remodel | Permit id: Pmt2015-03371 | |||||
SCORE 95 Remodel existing basement adding one bathroom sink and one floor drain. Enlarge egress windows. New boiler. 7 sf Client: Bridget Carlin | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: April 20, 2007 | Current use: Single family detached dwelling, remodel | Permit id: Pmt2006-04989 | |||||
SCORE 99 New one car, 24foot x 16foot detached garage in rear yard of single-family residence. Scope of work includes electrical service change for 1 amp service to move panel to garage and install sub-panel on house. Client: Bridget Carlin | Permit type: Building, electrical | Permit status: Cmp | Completion date: October 22, 2008 | Current use: Single family detached dwelling, existin | Permit id: Pmt2008-02264 | |||||
SCORE 95 Total tear-off & reroof of sfd, 16 squares of asphalt shingles on a pitch represented as 5 12. All roof materials shall be installed per manufacturerfoots specs. Client: Bridget Carlin | Permit type: Roofing | Permit status: Iss | Current use: Single family detached dwelling, existin | Permit id: Pmt2017-04754 |