Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 93 4005 Miranda Av, Palo Alto, Ca 94304 Bosch - install a 6kw and 12kw prototype energy storage system, install (n) 60a lockable disconnect, install (n) 200a subpanel in server room Permit type: Project - building permit | Permit status: Approved | Permit id: 15000-00824 | |||||
SCORE 93 ![]() ![]() Permit type: Project - building permit | Permit status: Permit issued | Permit id: 14000-00964 | |||||
SCORE 93 535 Cowper St, Palo Alto, Ca 94301 Relocate electrical connection location at 2 locations in open office #3013 and #3014 ![]() ![]() Permit type: Project - building permit | Permit status: Permit issued | Permit id: 14000-00582 | |||||
SCORE 93 ![]() ![]() Permit type: Project - building permit | Permit status: Permit issued | Permit id: 14000-00162 | |||||
SCORE 93 831 High St, Palo Alto, Ca 94301 Palantir: replace and relocate feeder and conduit from transformer to meter. Scope of work includes opening the sidewalk and a disconnect and reconnect at the meter. ![]() ![]() Permit type: Project - building permit | Permit status: Permit issued | Permit id: 13000-01467 | |||||
SCORE 93 855 El Camino Real, Bldg Palo Alto, Ca 94301 Building 1, suite 5: install new 120/208v 200a meter socket for future tenant. Meter to be requested under tenant improvement permit. ![]() ![]() Permit type: Project - building permit | Permit status: Permit issued | Permit id: 15000-01430 | |||||
SCORE 93 395 Page Mill Rd, Palo Alto, Ca 94306 Medallia: add electrical receptacles and workstation circuit feeds (20 sf) revision 3/23/15, removed areas from scope of work: open area 365 near stairwell and open area 386 ![]() ![]() Permit type: Project - building permit | Permit status: Permit issued | Permit id: 14000-02134 | |||||
SCORE 93 9 Arastradero Rd, Palo Alto, Ca 94304 Run electrical conduit from existing landscape light to existing trash enclosure for new light ![]() ![]() Permit type: Project - building permit | Permit status: Permit issued | Permit id: 16000-00627 | |||||
SCORE 93 755 Page Mill Rd, Palo Alto, Ca 94304 Installation of 2 dual head level 2 ev chargers new 2 amp subpanel and 2 amp breaker enclosure ![]() ![]() Permit type: Project - building permit | Permit status: In plan check | Permit id: 16000-02424 | |||||
SCORE 93 395 Page Mill Rd, Palo Alto, Ca 94306 San Diego Ca Medallia: add electrical receptacles and workstation circuit feeds (20 sf) revision 3 23 15, removed areas from scope of work: open area 365 near stairwell and open area 386 ![]() ![]() Permit status: Permit issued | Permit id: 14000-02134 | |||||
SCORE 93 Unit 1 / 855 El Camino Real, Suite 1, Palo Alto, Ca 94301 San Diego Ca Commercial amp level 2 ev charger.. ![]() ![]() Permit status: Permit issued | Permit id: 14000-00964 | |||||
SCORE 93 535 Cowper St, Palo Alto, Ca 94301 San Diego Ca Relocate electrical connection location at 2 locations in open office #3013 and #3014 ![]() ![]() Permit status: Permit issued | Permit id: 14000-00582 | |||||
SCORE 93 6 High St, Palo Alto, Ca 94301 San Diego Ca Install (4) level 2 chargers--wall mounted in palantir parking lot ![]() ![]() Permit status: Permit issued | Permit id: 14000-00162 | |||||
SCORE 93 831 High St, Palo Alto, Ca 94301 San Diego Ca Palantir: replace and relocate feeder and conduit from transformer to meter. Scope of work includes opening the sidewalk and a disconnect and reconnect at the meter. ![]() ![]() Permit status: Permit issued | Permit id: 13000-01467 | |||||
SCORE 93 4005 Miranda Av, Palo Alto, Ca 94304 San Diego Ca Bosch - install a 6kw and 12kw prototype energy storage system, install (n) 60a lockable disconnect, install (n) 200a subpanel in server room ![]() ![]() Permit status: In plan check | Permit id: 15000-00824 | |||||
SCORE 93 855 El Camino Real, Bldg Palo Alto, Ca 94301 San Diego Ca Building 1, suite 5: install new 120 208v 200a meter socket for future tenant. Meter to be requested under tenant improvement permit. ![]() ![]() Permit status: Permit issued | Permit id: 15000-01430 | |||||
SCORE 93 ![]() ![]() Permit status: Permit issued | Permit id: 17000-00829 | |||||
SCORE 93 ![]() ![]() Permit status: Permit issued | Permit id: 17000-01309 | |||||
SCORE 93 537 Hamilton Av, Palo Alto, Ca 94301 San Diego Ca Install one dedicated quad receptacle in the it room ![]() ![]() Permit status: Permit issued | Permit id: 17000-01525 | |||||
SCORE 93 3421 Hillview Av, Palo Alto, Ca 94304 San Diego Ca Vmware: ti to update electrical outlets and lighting (4536 sf) ![]() ![]() Permit status: Permit issued | Permit id: 17000-03033 |