16000-03053: revision field clarification revised panel schedule, modified evp panel from amp to 1 amp, anchorage for transformer, Date: September 22, 2017 Permit status: Permit issued | Permit id: 17rev-00599 |
SCORE 61 Replace rooftop boiler and two (2) pumps on the roof, Date: August 14, 2017 Value: $34,253 Permit status: Permit issued | Permit id: 17000-01925 |
SCORE 89 16000-03053: revision to add 3 4" pvc for future bike kiosk 18" below grade through landspace Date: March 13, 2017 Contractor: El Camino Electrical Services Permit status: Permit issued | Permit id: 17rev-00150 |
SCORE 89 Install (2) level 2 dual evse at parking lot. Date: December 8, 2016 Contractor: El Camino Electrical Services Permit type: Project - building permit | Permit status: Permit issued | Permit id: 16000-03053 |
SCORE 89 Install (2) level 2 dual evse at parking lot. 3 13 17 updated scope of work to add install (1) 225 amp 120 8v panel board. Dt Date: December 8, 2016 Contractor: El Camino Electrical Services Permit status: Permit issued | Permit id: 16000-03053 |
SCORE 89 Replace two (2) rooftop hvac equipment. Unit dimensions have changed from (e) unit Permit type: Project - building permit | Permit status: Finaled | Permit id: 16000-01094 |
SCORE 89 Replace two (2) rooftop hvac equipment. Unit dimensions have changed from (e) unit Permit status: Finaled | Permit id: 16000-01094 |
SCORE 99 Existing firm "bosch" install lights and outlet in existing office space 200sf. Date: April 26, 2016 Contractor: Mc Larney Construction Inc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 16000-00960 |
SCORE 56 Install (1) dual evse at parking lot. Date: March 15, 2016 Contractor: Evolvelectric Inc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 16000-00598 |
SCORE 89 Replace two (2) rooftop hvac equipment. Unit dimensions have changed from (e) unit Permit type: Project - building permit | Permit status: Permit issued | Permit id: 15000-02881 |