Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 Macdill Blvd Sw, Washington, Dc 20032 On behalf of the district of columbia water and sewer authority -dc water-, the dc clean rivers -dccr- project requests the approval to abandon 32 wells located along the blue plains tunnel -division a-. These monitoring wells and vibrating wire piezometers were installed by dccr during the investigation and design phase to provide information regarding subsurface conditions. Construction of the tunnel and near surface structures under divisions a are now complete. Therefore, the wells installed as part of these divisions are no longer needed and will be abandoned. Date: July 25, 2017 Client: Joint Base Anacostia-Bolling | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1700306 |