Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Dc clean rivers project: erosion and sediment control and pollution prevention bmps Date: March 19, 2012 Client: U.S. Government | Applicant: Ernestine Tyus | Permit type: Addition | Permit status: Permit issued | Permit id: B1205404 | |||||
Erosion and sediment control for excavation of diaphragm wall and shaft. Date: October 3, 2012 Client: Dc Water Dc Water | Applicant: Dc Water Dc Water; Tim Lamutt Tsjd | Permit type: Excavation only | Permit status: Permit issued | Permit id: Ex1200079 | |||||
Install instrumentation wells for monitoring during shaft construction Date: August 16, 2012 Client: Dc Water Water | Applicant: Dc Water Water; Tim Lamutt Tsjd | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1200377 | |||||
Construction of a 55 foot diameter, 1 foot deep shaft which will serve as the access point to the new blue plains tunnel being built as part of the d. C. Clean rivers project. This permit application will cover both the construction of the slurry wall (soe), the excavation ofthe shaft and the construction of the shaft liner. Date: October 12, 2012 Client: D.C. Water | Applicant: Damian Ruppert | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1213970 | |||||
Repair, rehabilitate or replace underground sewer pipes, laterals, and manholes (see attached documents and drawings for details permit for sediment control only. Date: June 11, 2013 Client: U. S. Airforce | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1307539 | |||||
Install 45 instuments on jbab to monitor the tunnel constuction along the potomac river. The tunnel is 23ft diamiter at a depth of roughly 100ft. Max depth of instrument is 103ft, diameter of boring is 8in using mud rotary and hollow stem auger. Date: May 31, 2013 Client: Dc Water Dc Water | Applicant: Dc Water Dc Water; Tim Lamutt Tsjd | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1200465 | |||||
Install 9 instruments to monitor tunnel construction. Max depth of instrument is 83ft, diamiter of borig is 8in using hollow stem aguer and mud rotary. Date: September 9, 2013 Client: Dc Water | Applicant: Tim Lamutt Tsjd | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1300301 | |||||
1st extension to building permit# b1307539 to expire 12/11/2014 Date: May 2, 2014 Client: U.S. Air Force | Applicant: Daniel Jeon/ Obrien And Gere | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1406982 | |||||
Install 22 manchette pipes along the south navy tenant building Date: March 6, 2014 Client: Dc Water | Applicant: Tim Lamutt | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400199 | |||||
Repair, rehabilitate or replace underground sewer pipes, laterals, and manholes (see attached documents and drawings for details permit for sediment control only. Date: June 11, 2013 Client: U. S. Airforce | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1307539 | |||||
SCORE 67 Erosion and sediment control for excavation of diaphragm wall and shaft. Date: October 3, 2012 Contractor: Dc Water Dc Water Tim Lamutt Tsjd Client: Dc Water Dc Water | Permit type: Excavation only | Permit status: Permit issued | Permit id: Ex1200079 | |||||
Repair, rehabilitate or replace underground sewer pipes, laterals, and manholes (see attached documents and drawings for details permit for sediment control only. Date: June 11, 2013 Client: U. S. Airforce | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1307539 | |||||
SCORE 67 Install 45 instuments on jbab to monitor the tunnel constuction along the potomac river. The tunnel is 23ft diamiter at a depth of roughly 100ft. Max depth of instrument is 103ft, diameter of boring is 8in using mud rotary and hollow stem auger. Date: May 31, 2013 Contractor: Dc Water Dc Water Tim Lamutt Tsjd Client: Dc Water Dc Water | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1200465 | |||||
SCORE 59 Install instrumentation wells for monitoring during shaft construction Date: August 16, 2012 Contractor: Dc Water Water Tim Lamutt Tsjd Client: Dc Water Water | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1200377 | |||||
SCORE 70 Install 45 instuments on jbab to monitor the tunnel constuction along the potomac river. The tunnel is 23ft diamiter at a depth of roughly 100ft. Max depth of instrument is 103ft, diameter of boring is 8in using mud rotary and hollow stem auger. Date: May 31, 2013 Contractor: Dc Water Dc Water; Tim Lamutt Tsjd Client: Dc Water Dc Water | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1200465 | |||||
SCORE 82 Install 9 instruments to monitor tunnel construction. Max depth of instrument is 83ft, diamiter of borig is 8in using hollow stem aguer and mud rotary. Date: September 9, 2013 Contractor: Tim Lamutt Tsjd Client: Dc Water | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1300301 | |||||
SCORE 86 Install 22 manchette pipes along the south navy tenant building Date: March 6, 2014 Contractor: Tim Lamutt Client: Dc Water | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400199 | |||||
SCORE 70 Erosion and sediment control for excavation of diaphragm wall and shaft. Date: October 3, 2012 Contractor: Dc Water Dc Water; Tim Lamutt Tsjd Client: Dc Water Dc Water | Permit type: Excavation only | Permit status: Permit issued | Permit id: Ex1200079 | |||||
SCORE 69 Dc clean rivers project: erosion and sediment control and pollution prevention bmps Date: March 19, 2012 Contractor: Ernestine Tyus Client: U.S. Government | Permit type: Addition | Permit status: Permit issued | Permit id: B1205404 | |||||
SCORE 86 Construction of a 55 foot diameter, 1 foot deep shaft which will serve as the access point to the new blue plains tunnel being built as part of the d. C. Clean rivers project. This permit application will cover both the construction of the slurry wall (soe), the excavation ofthe shaft and the construction of the shaft liner. Date: October 12, 2012 Contractor: Damian Ruppert Client: D.C. Water | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1213970 | |||||
SCORE 59 Install instrumentation wells for monitoring during shaft construction Date: August 16, 2012 Contractor: Dc Water Water; Tim Lamutt Tsjd Client: Dc Water Water | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1200377 | |||||
SCORE 56 24 soil boring locations, each to a depth of 17 ft. Date: August 17, 2016 Contractor: Joint Base Anacostia Bolling Client: Joint Base Anacostia Bolling | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1600347 | |||||
SCORE 56 1st extension to building permit# b1307539 to expire 12/11/2014 Date: May 2, 2014 Contractor: Daniel Jeon Obrien And Gere Client: U.S. Air Force | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1406982 | |||||
SCORE 56 On behalf of the district of columbia water and sewer authority -dc water-, the dc clean rivers -dccr- project requests the approval to abandon 32 wells located along the blue plains tunnel -division a-. These monitoring wells and vibrating wire piezometers were installed by dccr during the investigation and design phase to provide information regarding subsurface conditions. Construction of the tunnel and near surface structures under divisions a are now complete. Therefore, the wells installed as part of these divisions are no longer needed and will be abandoned. Date: July 25, 2017 Client: Joint Base Anacostia-Bolling | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1700306 | |||||
SCORE 56 Sprint cellular is replacing a light pole and foundation at a ballfield on jbab to install a larger foundation and light pole to support cellular antennas. Date: May 20, 2016 Contractor: Na Sprint; William Armour Client: Na Sprint | Permit type: Foundation only | Permit status: Permit issued | Permit id: Fd1600086 |