Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 7 Murdock St Cambridge, Ma Repairs to front entry exterior landing- replace all rot damage to floor planks and any guard rail pieces damaged by rot. Rear 2nd story deck platform to be reduced by half existing size; install missing framing connectors using heavy galv. Hangers and fasteners; and construct new pressure treated stairway from existing upper platform to lower existing platform with all necessary pressure treated structure guardrail and hand rail. Permit type: Addition/alteration | Completion date: June 6, 2014 | Current use: One-family | Parcel: 8741 |