Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 82 465 479 Huntington Av Boston Ma 02115 Installation of new sprinkler system in unprotected areas of the basement;&; sub-basement per nfpa 13;&; 7 cmr requirements. Please see attached impairment letter for additional information. Mfa must establish fire watch;using in-house security ![]() ![]() Permit type: Bfd other | Permit status: Na | Permit id: Sprk477037 | Parcel: 0401796000 | |||||
SCORE 82 3 Newbury St Boston Ma 02115 Coordinate impairment with building managment so that only one zone is impaired at any given time within the building; ![]() ![]() Permit type: Bfd other | Permit status: Na | Permit id: Sprk456630 | Parcel: 0503045110 | |||||
SCORE 82 1 Cambridge St Boston Ma 02114 Coordinate impairment with building managment so that only one zone is impaired at any given time within the building. ![]() ![]() Permit type: Bfd other | Permit status: Na | Permit id: Sprk483710 | Parcel: 0302726180 | |||||
SCORE 82 Shattuck St Boston Ma 02115 Installation shall be inaccordance with 7 cmr and nfpa 13... Only one zone shall be impaired at any given time within the building. ![]() ![]() Permit type: Bfd other | Permit status: Na | Permit id: Sprk459985 | Parcel: 0401896000 | |||||
SCORE 82 8 Harrison Av Roxbury Ma 02118 Coordinate impairment with the buildings impairment coordinator (required by 527 cmr 1. Section 16. 3) so that only one zone is impaired at any given time within the building... Installation shall comply with 7 cmr and nfpa 13 ![]() ![]() Permit type: Bfd other | Permit status: Na | Permit id: Sprk500616 | Parcel: 0801420000 | |||||
SCORE 82 8 Harrison Av Roxbury Ma 02118 Installation shall be in-accordance with the requirements of 7 cmr and nfpa 13..... Coordinate impairment with building management so that the 1st floor zone is the only zone impaired. ![]() ![]() Permit type: Bfd other | Permit status: Na | Permit id: Sprk486071 | Parcel: 0801420000 | |||||
SCORE 82 8 Harrison Av Roxbury Ma 02118 Relocate existing sprinkler system service to accommodate installation of new fuel tank. Extension of existing permit. Bfd paid detail required 1 officer 4 fire fighters (1) pumper truck ![]() ![]() Permit type: Bfd other | Permit status: Na | Permit id: Sprk500599 | Parcel: 0801420000 | |||||
SCORE 82 15 Parkman St Boston Ma 02114 Coordinate impairment with building managment so that only one floor is impaired at any given time ![]() ![]() Permit type: Bfd other | Permit status: Na | Permit id: Sprk472019 | Parcel: 0300370000 | |||||
SCORE 82 99 111 Seaport Bl Boston Ma 02210 Only one zone shall be impaired at any given time within the building.. Coordinate impairment with the buildings impairment coordinator in accordance with 527 cmr 1. 00 ![]() ![]() Permit type: Bfd other | Permit status: Na | Permit id: Sprk490168 | Parcel: 0602640030 | |||||
SCORE 82 32 Fruit St Boston Ma 02114 A complete and fully functioning sprinkler system shall be restored each day. Only one zone shall be impaired for less than 8 hours each day. ![]() ![]() Permit type: Bfd other | Permit status: Na | Permit id: Sprk458361 | Parcel: 0300427000 | |||||
SCORE 82 55 Fruit St Boston Ma 02114 Only one floor shall be impaired at any given time and;impairment shall be limited to 50 sf per floor ![]() ![]() Permit type: Bfd other | Permit status: Na | Permit id: Sprk473341 | Parcel: 0300381001 | |||||
SCORE 82 ![]() ![]() Permit type: Bfd other | Permit status: Na | Permit id: Sprk466351 | Parcel: 0300370000 | |||||
SCORE 82 354 364 Longwood Av Boston Ma 02215 Relocation of fire department connection check valve bfd paid detail required ![]() ![]() Permit type: Bfd other | Permit status: Na | Permit id: Sprk455032 | Parcel: 0401988000 | |||||
SCORE 82 3 Longwood Av Boston Ma 02115 Remove existing fire pump test header piping due to architectural renovations. Existing piping is no longer in service and is not tied into sprinkler system. Sprinkler system will remain in service during this work. ![]() ![]() Permit type: Bfd other | Permit status: Na | Permit id: Sprk504426 | Parcel: 0401870002 | |||||
SCORE 82 8 Harrison Av Roxbury Ma 02118 Only one floor shall be impaired at any given time.... Installation shall comply with the requirements of 7 cmr and nfpa 13 ![]() ![]() Permit type: Bfd other | Permit status: Na | Permit id: Sprk453592 | Parcel: 0801420000 | |||||
SCORE 82 112 Southampton St Roxbury Ma 02118 Install new sprinkler system for phase 2b due to architectural modifications. Rough in new system with temporary uprights which will result in a 1 day shutdown and tie-in to new service. Removal of existing piping will occur after new system is complete and online. ![]() ![]() Permit type: Bfd other | Permit status: Na | Permit id: Sprk457916 | Parcel: 0801027012 | |||||
SCORE 82 112 Southampton St Roxbury Ma 02118 Install new sprinklers in select rooms for phase 2a due to architectural modifications ![]() ![]() Permit type: Bfd other | Permit status: Na | Permit id: Sprk457914 | Parcel: 0801027012 | |||||
SCORE 82 74 76 Fenwood Rd Boston Ma 02115 Jcc #3465 - installation of new sprinkler system for new 11 story building per nfpa requirements. Occupancy - residential ![]() ![]() Permit type: Bfd other | Permit status: Na | Permit id: Sprk440968 | Parcel: 1000319000 | |||||
SCORE 82 401 401 Park Dr Boston Ma 02110 Sprinkler system shall remain fully functioning at all times within the building ![]() ![]() Permit type: Bfd other | Permit status: Na | Permit id: Sprk467506 | |||||
SCORE 82 8 Harrison Av Roxbury Ma 02118 The new standpipe will be fed from the existing supply main in the adjacent existing power plant building. A new floor control valve station will be installed to control all new sprinklers within the new tower. Please see attached impairment letter.; work to be done in accordance with nfpa 13.; coordinate flow with alarm to;both areas of buildings adjacent to each side of bridge.; ![]() ![]() Permit type: Bfd other | Permit status: Na | Permit id: Sprk459455 | Parcel: 0801420000 | |||||
SCORE 82 1 Franklin St Boston Ma 02110 Install new sprinkler system for new 55-story high rise per nfpa standards and 780cmr. This is a renewal of an existing permit sprk397116 ![]() ![]() Permit type: Bfd other | Permit status: Na | Permit id: Sprk491775 | Parcel: 0304584010 | |||||
SCORE 82 17 25 Blackfan St Boston Ma 02115 Installation shall comply with 7 cmr and nfpa 13...... Only one zone shall be impaired at any given time within the building. ![]() ![]() Permit type: Bfd other | Permit status: Na | Permit id: Sprk463251 | Parcel: 0401894000 | |||||
SCORE 82 1 Congress St Boston Ma 02108 Emergency repair of dry standpipe supply to stair 3 and stair 5 per nfpa 14 and 7 cmr requirements. Bfd paid detail required ![]() ![]() Permit type: Bfd other | Permit status: Na | Permit id: Sprk540649 | Parcel: 0302605000 | |||||
SCORE 82 99 111 Seaport Bl Boston Ma 02210 Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with building impairment coordinator (527 cmr 1. Section 16. 3. 2) so that only one zone is impaired at any given time within the building ![]() ![]() Permit type: Bfd other | Permit status: Na | Permit id: Sprk548830 | Parcel: 0602640030 | |||||
SCORE 82 75 Francis St Boston Ma 02115 Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with building impairment coordinator (527 cmr 1. Section 16. 3. 2) so that only one zone is impaired at any given time within the building ![]() ![]() Permit type: Bfd other | Permit status: Na | Permit id: Sprk548073 | Parcel: 0401896000 | |||||
SCORE 82 ![]() ![]() Permit type: Bfd other | Permit status: Na | Permit id: Sprk472938 | Parcel: 0401988000 | |||||
SCORE 82 765 Commonwealth Av Boston Ma 02215 Install new floor sprinkler systems in the b. U. Pappas library per nfpa 13 and 780cmr. Please see attached narrative describing the work. ![]() ![]() Permit type: Bfd other | Permit status: Na | Permit id: Sprk474088 | |||||
SCORE 82 99 111 Seaport Bl Boston Ma 02210 Installation of new sprinkler system in new 18 story building per nfpa 13 14 24 and 7 cmr requirements. ![]() ![]() Permit type: Bfd other | Permit status: Na | Permit id: Sprk455571 | Parcel: 0602640030 | |||||
SCORE 82 ![]() ![]() Permit type: Bfd other | Permit status: Na | Permit id: Sprk459910 | Parcel: 0401988000 | |||||
SCORE 82 2 Longwood Av Boston Ma 02115 Installation shall comply with the requirements of 7 cmr and nfpa 13... Only one;zone shall be impaired at any given time within the building. ![]() ![]() Permit type: Bfd other | Permit status: Na | Permit id: Sprk468819 | Parcel: 0401882000 | |||||
SCORE 82 ![]() ![]() Permit type: Bfd other | Permit status: Na | Permit id: Sprk466338 | Parcel: 0300370000 | |||||
SCORE 82 Shattuck St Boston Ma 02115 Only one floor can be impairement at any given time within the building for less than 8hrs. ![]() ![]() Permit type: Bfd other | Permit status: Na | Permit id: Sprk458299 | Parcel: 0401896000 | |||||
SCORE 82 ![]() ![]() Permit type: Bfd other | Permit status: Na | Permit id: Sprk464451 | Parcel: 2200862000 | |||||
SCORE 82 20 22 Liberty Dr Boston Ma 02210 Install new sprinkler system per 7 cmr & nfpa 13 14 requirements. This is a renewal of an existing permit for 20-22 liberty dr (fan pier c) which expires on 5282015 (see attached) ![]() ![]() Permit type: Bfd other | Permit status: Na | Permit id: Sprk468925 | Parcel: 0602671025 | |||||
SCORE 82 7 Albany St Roxbury Ma 02118 Relocate existing sprinklers in basement floor 1 and floor 2 of the existing power plant building due to architectural changes - relocating sprinklers by repositioning armovers to accommodate necessary sprinkler relocations.; work to be done;per nfpa 13 and 241.; ![]() ![]() Permit type: Bfd other | Permit status: Na | Permit id: Sprk458691 | Parcel: 0801067020 | |||||
SCORE 82 110 112 Southampton St Roxbury Ma 02118 Jcc job# 873191 - install new sprinkler system on 2nd floor of 112 southampton street. Perform 1 day test and tie-in. (new homeless shelter). This is phase 1 of the project. ![]() ![]() Permit type: Bfd other | Permit status: Na | Permit id: Sprk439982 | Parcel: 0801027012 | |||||
SCORE 82 7 Boylston St Boston Ma 02116 Heat detectors shall be installed and test by bfd prior to removing the sprinkler system. Bfd paid detail required ![]() ![]() Permit type: Bfd other | Permit status: Na | Permit id: Sprk471109 | |||||
SCORE 82 ![]() ![]() Permit type: Bfd other | Permit status: Na | Permit id: Sprk459405 | Parcel: 0801420000 | |||||
SCORE 82 9 Anderson St Boston Ma 02114 A temporary c of o was issued for all the work under sprk374951 except the standpipes the existing contactor is no longer on the project therefore;cannistraro is applying for a permit to complete the testing requirements. ![]() ![]() Permit type: Bfd other | Permit status: Na | Permit id: Sprk505629 | Parcel: 0502218000 | |||||
SCORE 82 131 131a Beverly St Boston Ma 02114 Installation of new sprinkler system for 17 story high rise per nfpa 13 14 24 & 7 cmr. Installation of temporary standpipe to include standpipe pac ![]() ![]() Permit type: Bfd other | Permit status: Na | Permit id: Sprk506587 | Parcel: 0303063000 | |||||
SCORE 82 8 Harrison Av Roxbury Ma 02118 Each floor will be tied in separately with no one floor being shut down for longer than eight hours. Please see attached impairment letter for additional information.; work to be done in accordance with code red impairment plan. ![]() ![]() Permit type: Bfd other | Permit status: Na | Permit id: Sprk459470 | Parcel: 0801420000 | |||||
SCORE 82 3 Longwood Av Boston Ma 02115 Relocate existing sprinklers in the first floor clinical building and 1st floor farley building due to architectural renovations per nfpa 13 and 7 cmr requirements.; one floor zone at a time. No patient occupancy in impaired zone. ![]() ![]() Permit type: Bfd other | Permit status: Na | Permit id: Sprk518389 | Parcel: 0401870002 | |||||
SCORE 82 Northern Av Boston Ma 02210 Cut and cap existing underground sprinkler service as it enters the building. Service will be capped and made safe. Building to be razed. ;removal of underground service by others. Building to be unnoccupied and secure from trespass. No other building fire services to be affected by work. Bfd paid detail required ![]() ![]() Permit type: Bfd other | Permit status: Na | Permit id: Sprk516423 | Parcel: 0602671025 | |||||
SCORE 82 465 479 Huntington A Boston Ma Installation of new sprinkler system in unprotected areas of the basement;&; sub-basement per nfpa 13;&; 7 cmr requirements. Please see attached impairment letter for additional information. Mfa must establish fire watch;using in-house security ![]() ![]() Client: Museum Of Fine Arts | Permit type: Bfd sprinkler system | Permit id: Sprk477037 | Parcel: 0401796000 | |||||
SCORE 82 3 Newbury St Boston Ma Coordinate impairment with building managment so that only one zone is impaired at any given time within the building; ![]() ![]() Client: Mskc Newton Res | Permit type: Bfd sprinkler system | Permit id: Sprk456630 | Parcel: 0503045110 | |||||
SCORE 82 1 Cambridge St Boston Ma Coordinate impairment with building managment so that only one zone is impaired at any given time within the building. ![]() ![]() Client: Bright Horizons | Permit type: Bfd sprinkler system | Permit id: Sprk483710 | Parcel: 0302726180 | |||||
SCORE 82 Shattuck St Boston Ma Installation shall be inaccordance with 7 cmr and nfpa 13... Only one zone shall be impaired at any given time within the building. ![]() ![]() Permit type: Bfd sprinkler system | Permit id: Sprk459985 | Parcel: 0401896000 | |||||
SCORE 82 8 Harrison Av Boston Ma Coordinate impairment with the buildings impairment coordinator (required by 527 cmr 1. Section 16. 3) so that only one zone is impaired at any given time within the building... Installation shall comply with 7 cmr and nfpa 13 ![]() ![]() Client: Boston Public Health Comm | Permit type: Bfd sprinkler system | Permit id: Sprk500616 | Parcel: 0801420000 | |||||
SCORE 82 8 Harrison Av Boston Ma Installation shall be in-accordance with the requirements of 7 cmr and nfpa 13..... Coordinate impairment with building management so that the 1st floor zone is the only zone impaired. ![]() ![]() Client: Univ Hospital I | Permit type: Bfd sprinkler system | Permit id: Sprk486071 | Parcel: 0801420000 | |||||
SCORE 82 8 Harrison Av Boston Ma Relocate existing sprinkler system service to accommodate installation of new fuel tank. Extension of existing permit. Bfd paid detail required 1 officer 4 fire fighters (1) pumper truck ![]() ![]() Client: Univ Hospital I | Permit type: Bfd sprinkler system | Permit id: Sprk500599 | Parcel: 0801420000 | |||||
SCORE 82 15 Parkman St Boston Ma Coordinate impairment with building managment so that only one floor is impaired at any given time ![]() ![]() Client: Partners Healthcare System Mgh | Permit type: Bfd sprinkler system | Permit id: Sprk472019 | Parcel: 0300370000 | |||||
SCORE 82 99 111 Seaport Bl Boston Ma Only one zone shall be impaired at any given time within the building.. Coordinate impairment with the buildings impairment coordinator in accordance with 527 cmr 1. 00 ![]() ![]() Client: Ms Boston Seapo | Permit type: Bfd sprinkler system | Permit id: Sprk490168 | Parcel: 0602640030 | |||||
SCORE 82 32 Fruit St Boston Ma A complete and fully functioning sprinkler system shall be restored each day. Only one zone shall be impaired for less than 8 hours each day. ![]() ![]() Client: Sauro James D T | Permit type: Bfd sprinkler system | Permit id: Sprk458361 | Parcel: 0300427000 | |||||
SCORE 82 55 Fruit St Boston Ma Only one floor shall be impaired at any given time and;impairment shall be limited to 50 sf per floor ![]() ![]() Client: Mass Eye And Ear Infirmary | Permit type: Bfd sprinkler system | Permit id: Sprk473341 | Parcel: 0300381001 | |||||
SCORE 82 ![]() ![]() Client: Partners Healthcare System Mgh | Permit type: Bfd sprinkler system | Permit id: Sprk466351 | Parcel: 0300370000 | |||||
SCORE 82 354 364 Longwood Av Boston Ma Relocation of fire department connection check valve bfd paid detail required ![]() ![]() Client: Diabetes Founda | Permit type: Bfd sprinkler system | Permit id: Sprk455032 | Parcel: 0401988000 | |||||
SCORE 82 3 Longwood Av Boston Ma Remove existing fire pump test header piping due to architectural renovations. Existing piping is no longer in service and is not tied into sprinkler system. Sprinkler system will remain in service during this work. ![]() ![]() Client: Childrens Hosp | Permit type: Bfd sprinkler system | Permit id: Sprk504426 | Parcel: 0401870002 | |||||
SCORE 82 8 Harrison Av Boston Ma Only one floor shall be impaired at any given time.... Installation shall comply with the requirements of 7 cmr and nfpa 13 ![]() ![]() Client: Univ Hospital I | Permit type: Bfd sprinkler system | Permit id: Sprk453592 | Parcel: 0801420000 | |||||
SCORE 82 112 Southampton St Boston Ma Install new sprinkler system for phase 2b due to architectural modifications. Rough in new system with temporary uprights which will result in a 1 day shutdown and tie-in to new service. Removal of existing piping will occur after new system is complete and online. ![]() ![]() Client: City Of Boston | Permit type: Bfd sprinkler system | Permit id: Sprk457916 | Parcel: 0801027012 | |||||
SCORE 82 112 Southampton St Boston Ma Install new sprinklers in select rooms for phase 2a due to architectural modifications ![]() ![]() Client: City Of Boston | Permit type: Bfd sprinkler system | Permit id: Sprk457914 | Parcel: 0801027012 | |||||
SCORE 82 74 76 Fenwood Rd Boston Ma Jcc #3465 - installation of new sprinkler system for new 11 story building per nfpa requirements. Occupancy - residential ![]() ![]() Client: Commwlth Of Mass | Permit type: Bfd sprinkler system | Permit id: Sprk440968 | Parcel: 1000319000 | |||||
SCORE 82 401 401 Park Dr Boston Ma Sprinkler system shall remain fully functioning at all times within the building ![]() ![]() Permit type: Bfd sprinkler system | Permit id: Sprk467506 | |||||
SCORE 82 8 Harrison Av Boston Ma The new standpipe will be fed from the existing supply main in the adjacent existing power plant building. A new floor control valve station will be installed to control all new sprinklers within the new tower. Please see attached impairment letter.; work to be done in accordance with nfpa 13.; coordinate flow with alarm to;both areas of buildings adjacent to each side of bridge.; ![]() ![]() Client: Univ Hospital I | Permit type: Bfd sprinkler system | Permit id: Sprk459455 | Parcel: 0801420000 | |||||
SCORE 82 1 Franklin St Boston Ma Install new sprinkler system for new 55-story high rise per nfpa standards and 780cmr. This is a renewal of an existing permit sprk397116 ![]() ![]() Client: Washington Stre | Permit type: Bfd sprinkler system | Permit id: Sprk491775 | Parcel: 0304584010 | |||||
SCORE 82 17 25 Blackfan St Boston Ma Installation shall comply with 7 cmr and nfpa 13...... Only one zone shall be impaired at any given time within the building. ![]() ![]() Client: Childrens Hosp | Permit type: Bfd sprinkler system | Permit id: Sprk463251 | Parcel: 0401894000 | |||||
SCORE 82 8 Harrison Av Boston Ma Impairment shall be coordinated with the buildings impairment coordinator (mike canning) so that only one zone is impaired at any given time within the building. Installation shall be in accordance with the requirements of 7 cmr nfpa 13 and nfpa 25. ![]() ![]() Client: Univ Hospital I | Permit type: Bfd sprinkler system | Permit id: Sprk526268 | Parcel: 0801420000 | |||||
SCORE 82 8 Harrison Av Boston Ma Impairment shall be coordinated with the buildings impairment coordinator (mike canning)so that only one zone is impaired at any given time within the building. Installation shall be in accordance with the requirements of 7 cmr nfpa 13 and nfpa 25. ![]() ![]() Client: Univ Hospital I | Permit type: Bfd sprinkler system | Permit id: Sprk526260 | Parcel: 0801420000 | |||||
SCORE 82 15 Parkman St Boston Ma Impairment shall be coordinated with the buildings impairment coordinator; so that only one zone is impaired at any given time within the building. Installation shall be in accordance with the requirements of 7 cmr nfpa 13 and nfpa 25. ![]() ![]() Client: Partners Healthcare System Mgh | Permit type: Bfd sprinkler system | Permit id: Sprk527294 | Parcel: 0300370000 | |||||
SCORE 82 99 111 Seaport Bl Boston Ma Relocation of sprinkler heads on the 6th floor due to architectural changes per nfpa 13 and 7 cmr ![]() ![]() Client: Ms Boston Seapo | Permit type: Bfd sprinkler system | Permit id: Sprk524613 | Parcel: 0602640030 | |||||
SCORE 82 374 Commonwealth Av Boston Ma Relocate sprinklers in basement to 5th floor to provide adequate protection due to architectural changes. Installation of new standpipe per nfpa 14 requirements. (please see attached impairment letter for more information.) bfd paid detail required ![]() ![]() Client: Harvard Club Of Boston | Permit type: Bfd sprinkler system | Permit id: Sprk464336 | Parcel: 0503816000 | |||||
SCORE 82 112 Southampton St Boston Ma New sprinkler system for phase 3 due to arch changes. Install new system with temp uprights which results in a 1 day shutdown and tie in to new service. Existing system will then be removed. Phase 3 is isolated from the remainder of the building and shutdowns will only affect the construction area. ![]() ![]() Client: City Of Boston | Permit type: Bfd sprinkler system | Permit id: Sprk536762 | Parcel: 0801027012 | |||||
SCORE 82 1 Deaconess Rd Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with building impairment coordinator (527 cmr 1. Section 16. 3. 2) so that only one zone is impaired at any given time within the building ![]() ![]() Client: Beth Israel Dea | Permit type: Bfd sprinkler system | Permit id: Sprk531965 | Parcel: 0401954001 | |||||
SCORE 82 3 Brookline Av Boston Ma Coordinate impairment with building impairment coordinator so that only one zone is impaired at any given time within the building ![]() ![]() Client: Beth Israel Hospital | Permit type: Bfd sprinkler system | Permit id: Sprk533536 | Parcel: 0401862000 | |||||
SCORE 82 7 Boylston St Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with building impairment coordinator (527 cmr 1. Section 16. 3. 2) so that only one zone is impaired at any given time within the building ![]() ![]() Permit type: Bfd sprinkler system | Permit id: Sprk542994 | |||||
SCORE 82 1153 Centre St Boston Ma Bfd witness testing is required contact john alves 617-343-3034 to schedule test bfd paid detail required-1-pump 1-officer &; 3 firefighters ![]() ![]() Client: Faulkner Hospit | Permit type: Bfd sprinkler system | Permit id: Sprk542365 | Parcel: 1902598000 | |||||
SCORE 82 265 Charles St Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with building impairment coordinator (527 cmr 1. Section 16. 3. 2) so that only one zone is impaired at any given time within the building ![]() ![]() Client: Partners Healthcare System Mgh | Permit type: Bfd sprinkler system | Permit id: Sprk546295 | Parcel: 0300370000 | |||||
SCORE 82 2 Longwood Av Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with building impairment coordinator (527 cmr 1. Section 16. 3. 2) so that only one zone is impaired at any given time within the building ![]() ![]() Permit type: Bfd sprinkler system | Permit id: Sprk547711 | Parcel: 0401882000 | |||||
SCORE 82 Staniford St Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with building impairment coordinator (527 cmr 1. Section 16. 3. 2) so that only one zone is impaired at any given time within the building ![]() ![]() Client: Charles River P | Permit type: Bfd sprinkler system | Permit id: Sprk546019 | Parcel: 0300470000 | |||||
SCORE 82 1 Congress St Boston Ma Emergency repair of dry standpipe supply to stair 3 and stair 5 per nfpa 14 and 7 cmr requirements. Bfd paid detail required ![]() ![]() Client: Gsa Fin Div Util Unit 01173457 | Permit type: Bfd sprinkler system | Permit id: Sprk540649 | Parcel: 0302605000 | |||||
SCORE 82 99 111 Seaport Bl Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with building impairment coordinator (527 cmr 1. Section 16. 3. 2) so that only one zone is impaired at any given time within the building ![]() ![]() Client: Ms Boston Seapo | Permit type: Bfd sprinkler system | Permit id: Sprk548830 | Parcel: 0602640030 | |||||
SCORE 82 75 Francis St Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with building impairment coordinator (527 cmr 1. Section 16. 3. 2) so that only one zone is impaired at any given time within the building ![]() ![]() Permit type: Bfd sprinkler system | Permit id: Sprk548073 | Parcel: 0401896000 | |||||
SCORE 82 161 209 Cambridge St Boston Ma Install new sprinkler system on level 7 of 165 cambridge st (charles river plaza). Space is currently empty and protected with temporary heat detectors (see approved bfd permit attached and supplemental jcc impairment letter). Installation to conform with nfpa and 780cmr requirements ![]() ![]() Client: Div Charles River Limited | Permit type: Bfd sprinkler system | Permit id: Sprk542594 | Parcel: 0300660000 | |||||
SCORE 82 201 201 Brookline Av Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with building impairment coordinator (527 cmr 1. Section 16. 3. 2) so that only one zone is impaired at any given time within the building ![]() ![]() Permit type: Bfd sprinkler system | Permit id: Sprk550026 | |||||
SCORE 82 Rowes Wharf Downtown Ma Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with building impairment coordinator (527 cmr 1. Section 16. 3. 2) so that only one zone is impaired at any given time within the building ![]() ![]() Client: Rowes Wharf Con | Permit type: Bfd sprinkler system | Permit id: Sprk550944 | Parcel: 0302961000 | |||||
SCORE 82 161 209 Cambridge St Boston Ma Relocate a small portion of standpipe to accommodate a new egress door in stairwell on level 7 of 165 cambridge st (charles st plaza). Work will take place during 1-8 hour shutdown. (impairment letter attached) bfd paid detail required ![]() ![]() Client: Div Charles River Limited | Permit type: Bfd sprinkler system | Permit id: Sprk551355 | Parcel: 0300660000 | |||||
SCORE 82 ![]() ![]() Client: Diabetes Founda | Permit type: Bfd sprinkler system | Permit id: Sprk472938 | Parcel: 0401988000 | |||||
SCORE 82 765 Commonwealth Av Boston Ma Install new floor sprinkler systems in the b. U. Pappas library per nfpa 13 and 780cmr. Please see attached narrative describing the work. ![]() ![]() Permit type: Bfd sprinkler system | Permit id: Sprk474088 | |||||
SCORE 82 99 111 Seaport Bl Boston Ma Installation of new sprinkler system in new 18 story building per nfpa 13 14 24 and 7 cmr requirements. ![]() ![]() Client: Ms Boston Seapo | Permit type: Bfd sprinkler system | Permit id: Sprk455571 | Parcel: 0602640030 | |||||
SCORE 82 ![]() ![]() Client: Diabetes Founda | Permit type: Bfd sprinkler system | Permit id: Sprk459910 | Parcel: 0401988000 | |||||
SCORE 82 2 Longwood Av Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa 13... Only one;zone shall be impaired at any given time within the building. ![]() ![]() Permit type: Bfd sprinkler system | Permit id: Sprk468819 | Parcel: 0401882000 | |||||
SCORE 82 ![]() ![]() Client: Partners Healthcare System Mgh | Permit type: Bfd sprinkler system | Permit id: Sprk466338 | Parcel: 0300370000 | |||||
SCORE 82 Shattuck St Boston Ma Only one floor can be impairement at any given time within the building for less than 8hrs. ![]() ![]() Permit type: Bfd sprinkler system | Permit id: Sprk458299 | Parcel: 0401896000 | |||||
SCORE 82 ![]() ![]() Client: Harvard Realls | Permit type: Bfd sprinkler system | Permit id: Sprk464451 | Parcel: 2200862000 | |||||
SCORE 82 20 22 Liberty Dr South Boston Ma Install new sprinkler system per 7 cmr & nfpa 13 14 requirements. This is a renewal of an existing permit for 20-22 liberty dr (fan pier c) which expires on 5/28/2015 (see attached) ![]() ![]() Client: Fan Pier Develo | Permit type: Bfd sprinkler system | Permit id: Sprk468925 | Parcel: 0602671025 | |||||
SCORE 82 7 Albany St Boston Ma Relocate existing sprinklers in basement floor 1 and floor 2 of the existing power plant building due to architectural changes - relocating sprinklers by repositioning armovers to accommodate necessary sprinkler relocations.; work to be done;per nfpa 13 and 241.; ![]() ![]() Client: Six Sixty Corpo | Permit type: Bfd sprinkler system | Permit id: Sprk458691 | Parcel: 0801067020 | |||||
SCORE 82 110 112 Southampton Boston Ma Jcc job# 873191 - install new sprinkler system on 2nd floor of 112 southampton street. Perform 1 day test and tie-in. (new homeless shelter). This is phase 1 of the project. ![]() ![]() Client: City Of Boston | Permit type: Bfd sprinkler system | Permit id: Sprk439982 | Parcel: 0801027012 | |||||
SCORE 82 7 Boylston St Boston Ma Heat detectors shall be installed and test by bfd prior to removing the sprinkler system. Bfd paid detail required ![]() ![]() Permit type: Bfd sprinkler system | Permit id: Sprk471109 | |||||
SCORE 82 ![]() ![]() Client: Univ Hospital I | Permit type: Bfd sprinkler system | Permit id: Sprk459405 | Parcel: 0801420000 | |||||
SCORE 82 9 Anderson St Boston Ma A temporary c of o was issued for all the work under sprk374951 except the standpipes the existing contactor is no longer on the project therefore;cannistraro is applying for a permit to complete the testing requirements. ![]() ![]() Client: Emerald Realty Capital Llc | Permit type: Bfd sprinkler system | Permit id: Sprk505629 | Parcel: 0502218000 | |||||
SCORE 82 131 131a Beverly St Boston Ma Installation of new sprinkler system for 17 story high rise per nfpa 13 14 24 & 7 cmr. Installation of temporary standpipe to include standpipe pac ![]() ![]() Client: Beverly Wharf L | Permit type: Bfd sprinkler system | Permit id: Sprk506587 | Parcel: 0303063000 | |||||
SCORE 82 8 Harrison Av Boston Ma Each floor will be tied in separately with no one floor being shut down for longer than eight hours. Please see attached impairment letter for additional information.; work to be done in accordance with code red impairment plan. ![]() ![]() Client: Boston Public Health Comm | Permit type: Bfd sprinkler system | Permit id: Sprk459470 | Parcel: 0801420000 | |||||
SCORE 82 3 Longwood Av Boston Ma Relocate existing sprinklers in the first floor clinical building and 1st floor farley building due to architectural renovations per nfpa 13 and 7 cmr requirements.; one floor zone at a time. No patient occupancy in impaired zone. ![]() ![]() Client: Childrens Hosp | Permit type: Bfd sprinkler system | Permit id: Sprk518389 | Parcel: 0401870002 | |||||
SCORE 82 Northern Av Boston Ma Cut and cap existing underground sprinkler service as it enters the building. Service will be capped and made safe. Building to be razed. ;removal of underground service by others. Building to be unnoccupied and secure from trespass. No other building fire services to be affected by work. Bfd paid detail required ![]() ![]() Client: Fan Pier Develo | Permit type: Bfd sprinkler system | Permit id: Sprk516423 | Parcel: 0602671025 | |||||
SCORE 82 354 364 Longwood Av Boston Ma Coordinate impairment with the building impairment coordinator so that only one zone is impaired at any given time ![]() ![]() Client: Diabetes Founda | Permit type: Bfd sprinkler system | Permit id: Sprk522854 | Parcel: 0401988000 | |||||
SCORE 82 26 North St Boston Ma Coordinate impairment with the building impairment manager so that only one zone is impaired at any given time ![]() ![]() Permit type: Bfd sprinkler system | Permit id: Sprk522887 | |||||
SCORE 82 8 Boylston St Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with buildings listed;impairment coordinator so that only one zone is impaired at any given time within the building ![]() ![]() Client: Bp Prucenter Acquisition Llc | Permit type: Bfd sprinkler system | Permit id: Sprk587156 | Parcel: 0401037100 | |||||
SCORE 82 55 Fruit St Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards....... Coordinate sprinkler;impairment with buildings listed;impairment coordinator so that only one zone is impaired at any given time within the building ![]() ![]() Permit type: Bfd sprinkler system | Permit id: Sprk595352 | |||||
SCORE 82 465479 Huntington A Boston Ma Installation of new sprinkler system in unprotected areas of the basement;&; sub-basement per nfpa 13;&; 7 cmr requirements. Please see attached impairment letter for additional information. Mfa must establish fire watch;using in-house security ![]() ![]() Client: Museum Of Fine Arts | Permit type: Bfd sprinkler system | Permit id: Sprk477037 | Parcel: 0401796000 | |||||
SCORE 82 8 Harrison Av Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with building impairment coordinator (527 cmr 1. Section 16. 3. 2) so that only one zone is impaired at any given time within the building ![]() ![]() Client: Boston Public Health Comm | Permit type: Bfd sprinkler system | Permit id: Sprk554582 | Parcel: 0801420000 | |||||
SCORE 82 8 Harrison Ave Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards....... Coordinate sprinkler;impairment with buildings listed;impairment coordinator so that only one zone is impaired at any given time within the building ![]() ![]() Permit type: Bfd sprinkler system | Permit id: Sprk598734 | |||||
SCORE 82 1 Childrens Rd Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with buildings listed;impairment coordinator so that only one zone is impaired at any given time within the building ![]() ![]() Client: Childrens Hospital Corp The | Permit type: Bfd sprinkler system | Permit id: Sprk587320 | Parcel: 0401895000 | |||||
SCORE 82 1 Childrens Rd Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with buildings listed;impairment coordinator (per buildings nfpa 241 report )so that only one zone is impaired at any given time within the building ![]() ![]() Client: Childrens Hospital Corp The | Permit type: Bfd sprinkler system | Permit id: Sprk570458 | Parcel: 0401895000 | |||||
SCORE 82 465479 Huntington A Boston Ma Condition of approval: during the sprinkler tie-in (impairment) any area effected by the sprinkler shut down shall not be occupied. The tie-in will impair approximately 7 5 sf of attic space and 5 0 sf of gallery space. Both spaces are currently closed to the public. ![]() ![]() Client: Museum Of Fine Arts | Permit type: Bfd sprinkler system | Permit id: Sprk590195 | Parcel: 0401796000 | |||||
SCORE 82 124 Boylston St Boston Ma Conditions of approval: heat detectors shall be installed and tested with bfd prior to removing the sprinkler system. Only one floors sprinkler system shall be impaired at any given time within the building. ![]() ![]() Permit type: Bfd sprinkler system | Permit id: Sprk592761 | |||||
SCORE 82 304 Commonwealth Av Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with building impairment coordinator (527 cmr 1. Section 16. 3. 2) so that only one zone is impaired at any given time within the building ![]() ![]() Client: Clark Weld House Condo Trust | Permit type: Bfd sprinkler system | Permit id: Sprk565149 | Parcel: 0503070000 | |||||
SCORE 82 8 Harrison Av Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with buildings listed;impairment coordinator (roger goudreau) so that only one zone is impaired at any given time within the building ![]() ![]() Client: Boston Public Health Comm | Permit type: Bfd sprinkler system | Permit id: Sprk565985 | Parcel: 0801420000 | |||||
SCORE 82 11 Post Office Sq Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with buildings listed;impairment coordinator (per the buildings nfpa 241 report;) so that only one zone is impaired at any given time within the building ![]() ![]() Permit type: Bfd sprinkler system | Permit id: Sprk567370 | |||||
SCORE 82 7 Boylston St Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards....... Coordinate sprinkler;impairment with buildings listed;impairment coordinator so that only one zone is impaired at any given time within the building ![]() ![]() Permit type: Bfd sprinkler system | Permit id: Sprk603608 | |||||
SCORE 82 401401 Park Dr Boston Ma Sprinkler system shall remain fully functioning at all times within the building ![]() ![]() Permit type: Bfd sprinkler system | Permit id: Sprk467506 | |||||
SCORE 82 1 Northern Av Boston Ma Cut cap and make safe existing fire protection service to allow for demolition of building. ![]() ![]() Client: Pier Four Inc | Permit type: Bfd sprinkler system | Permit id: Sprk569808 | Parcel: 0602671060 | |||||
SCORE 82 8 Harrison Av Boston Ma Impairment limited to;just the penthouse no other floor sprinkler system shall be impaired during this scheduled work..... Coordinate impairment with the buildings impairment coordinator... Building permit alt563738 ![]() ![]() Client: Boston Public Health Comm | Permit type: Bfd sprinkler system | Permit id: Sprk539381 | Parcel: 0801420000 | |||||
SCORE 82 8 Harrison Av Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with buildings listed;impairment coordinator so that only one zone is impaired at any given time within the building ![]() ![]() Client: Boston Public Health Comm | Permit type: Bfd sprinkler system | Permit id: Sprk572356 | Parcel: 0801420000 | |||||
SCORE 82 161209 Cambridge St Boston Ma Relocate a small portion of standpipe to accommodate a new egress door in stairwell on level 7 of 165 cambridge st (charles st plaza). Work will take place during 1-8 hour shutdown. (impairment letter attached) bfd paid detail required ![]() ![]() Client: Div Charles River Lps | Permit type: Bfd sprinkler system | Permit id: Sprk551355 | Parcel: 0300660000 | |||||
SCORE 82 1 Harbor St Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with buildings listed;impairment coordinator so that only one zone is impaired at any given time within the building. ![]() ![]() Client: Economic Development And | Permit type: Bfd sprinkler system | Permit id: Sprk582729 | Parcel: 0602674000 | |||||
SCORE 82 147149 Milk St Boston Ma Install (2) fire department valves on 10th floor to allow for standpipe testing per nfpa 14 and 7 cmr requirements. ![]() ![]() Client: Mept 147 Milk Llc | Permit type: Bfd sprinkler system | Permit id: Sprk603631 | Parcel: 0304027000 | |||||
SCORE 82 7 Albany St Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with buildings listed;impairment coordinator so that only one zone is impaired at any given time within the building ![]() ![]() Client: Boston Public Health Comm | Permit type: Bfd sprinkler system | Permit id: Sprk575119 | Parcel: 0801067020 | |||||
SCORE 82 4 Brookline Av Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with building impairment coordinator (527 cmr 1. Section 16. 3. 2) so that only one zone is impaired at any given time within the building. ![]() ![]() Client: Children Cancer Research | Permit type: Bfd sprinkler system | Permit id: Sprk559655 | Parcel: 0401913000 | |||||
SCORE 82 354364 Longwood Av Boston Ma Coordinate impairment with the building impairment coordinator so that only one zone is impaired at any given time ![]() ![]() Client: Diabetes Foundation Inc | Permit type: Bfd sprinkler system | Permit id: Sprk522854 | Parcel: 0401988000 | |||||
SCORE 82 601 Congress St Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with buildings listed;impairment coordinator so that only one zone is impaired at any given time within the building ![]() ![]() Client: John Hancock Life Insurance | Permit type: Bfd sprinkler system | Permit id: Sprk571699 | Parcel: 0602678701 | |||||
SCORE 82 1 Franklin St Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards installation shall be per isd approved phasing plan. ![]() ![]() Client: Four 26 Washington St Owner | Permit type: Bfd sprinkler system | Permit id: Sprk579648 | Parcel: 0304584010 | |||||
SCORE 82 125 Summer St Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with buildings listed;impairment coordinator and test the system per nfpa 13 on completion. Bfd paid detail required... 1-officer &; 3-firefighters; ![]() ![]() Client: Opg 125 Summer Owner (de)llc | Permit type: Bfd sprinkler system | Permit id: Sprk582882 | Parcel: 0304256000 | |||||
SCORE 82 99111 Seaport Bl Boston Ma Relocation of sprinkler heads on the 6th floor due to architectural changes per nfpa 13 and 7 cmr ![]() ![]() Client: Ms Boston Seaport Llc | Permit type: Bfd sprinkler system | Permit id: Sprk524613 | Parcel: 0602640030 | |||||
SCORE 82 1862 Brookline Av Boston Ma Installation of a new sprinkler system for a new 32 story high rise per nfpa 13 14 24 and 7 cmr ![]() ![]() Client: Fenway Ventures Point | Permit type: Bfd sprinkler system | Permit id: Sprk562641 | Parcel: 2100055000 | |||||
SCORE 82 1 Franklin St Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with buildings listed;impairment coordinator so that only one zone is impaired at any given time within the building ![]() ![]() Client: Four 26 Washington St Owner | Permit type: Bfd sprinkler system | Permit id: Sprk590159 | Parcel: 0304584010 | |||||
SCORE 82 2 Longwood Av Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards....... Coordinate sprinkler;impairment with buildings listed;impairment coordinator so that only one zone is impaired at any given time within the building ![]() ![]() Client: Harvard College | Permit type: Bfd sprinkler system | Permit id: Sprk587337 | Parcel: 0401882000 | |||||
SCORE 82 32 Fruit St Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with buildings listed;impairment coordinator so that only one zone is impaired at any given time within the building ![]() ![]() Client: The General Hospital Corp | Permit type: Bfd sprinkler system | Permit id: Sprk587325 | Parcel: 0300445000 | |||||
SCORE 82 1725 Blackfan St Boston Ma Installation shall comply with 7 cmr and nfpa 13...... Only one zone shall be impaired at any given time within the building. ![]() ![]() Client: Childrens Hospital Med Cntr | Permit type: Bfd sprinkler system | Permit id: Sprk463251 | Parcel: 0401894000 | |||||
SCORE 82 99111 Seaport Bl Boston Ma Installation of new sprinkler system in new 18 story building per nfpa 13 14 24 and 7 cmr requirements. ![]() ![]() Client: Ms Boston Seaport Llc | Permit type: Bfd sprinkler system | Permit id: Sprk455571 | Parcel: 0602640030 | |||||
SCORE 82 32 Fruit St Boston Ma Relocate sprinkler heads throughout 5th and 6th floors of mgh yawkey. Floors will be zoned out and no more than 1 floor will be shut down at a time. (this is an extension of sprk#458361) work to be done per nfpa stands. 7 cmr one floor zone at a time 8hrs. No patient occupancy in impaired zone. ![]() ![]() Client: The General Hospital Corp | Permit type: Bfd sprinkler system | Permit id: Sprk579201 | Parcel: 0300445000 | |||||
SCORE 82 15 Marina Park Dr Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with buildings listed;impairment coordinator so that only one zone is impaired at any given time within the building ![]() ![]() Client: Fan Pier Development Llc | Permit type: Bfd sprinkler system | Permit id: Sprk575295 | Parcel: 0602671025 | |||||
SCORE 82 South St Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards....... Coordinate sprinkler;impairment with buildings listed;impairment coordinator so that only one zone is impaired at any given time within the building ![]() ![]() Client: Sixty South Street Limited | Permit type: Bfd sprinkler system | Permit id: Sprk587378 | Parcel: 0304300010 | |||||
SCORE 82 1 Francis St Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with buildings listed;impairment coordinator so that only one zone is impaired at any given time within the building ![]() ![]() Client: Beth Israel Deaconess Inc | Permit type: Bfd sprinkler system | Permit id: Sprk582736 | Parcel: 0401964000 | |||||
SCORE 82 131131a Beverly St Boston Ma Installation of new sprinkler system for 17 story high rise per nfpa 13 14 24 & 7 cmr. Installation of temporary standpipe to include standpipe pac ![]() ![]() Client: Related Lovejoy Residential | Permit type: Bfd sprinkler system | Permit id: Sprk506587 | Parcel: 0303063000 | |||||
SCORE 82 Northern Av Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards....... Coordinate sprinkler;impairment with buildings listed;impairment coordinator so that only one zone is impaired at any given time within the building ![]() ![]() Client: Fan Pier Development Llc | Permit type: Bfd sprinkler system | Permit id: Sprk607964 | Parcel: 0602671025 | |||||
SCORE 82 7476 Fenwood Rd Boston Ma Jcc #3465 - installation of new sprinkler system for new 11 story building per nfpa requirements. Occupancy - residential ![]() ![]() Client: Commonwealth Of Mass | Permit type: Bfd sprinkler system | Permit id: Sprk440968 | Parcel: 1000319000 | |||||
SCORE 82 55 Fruit St Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with building impairment coordinator (527 cmr 1. Section 16. 3. 2) so that only one zone is impaired at any given time within the building ![]() ![]() Client: General Hospital Corp | Permit type: Bfd sprinkler system | Permit id: Sprk554383 | Parcel: 0300370000 | |||||
SCORE 82 55 Thomson Pl Boston Ma Repair section of underground sprinkler pipe and replace leaking os&y valve on backflow preventer. ![]() ![]() Client: Fifty 5 Thomson St Invest Lp | Permit type: Bfd sprinkler system | Permit id: Sprk572066 | Parcel: 0602654001 | |||||
SCORE 82 8 Harrison Av Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with buildings listed;impairment coordinator so that only one zone is impaired at any given time within the building.;anticipated to start after phase 1 in august 2016. ![]() ![]() Client: Boston Public Health Comm | Permit type: Bfd sprinkler system | Permit id: Sprk572374 | Parcel: 0801420000 | |||||
SCORE 82 8 Harrison Av Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with buildings listed;impairment coordinator so that only one zone is impaired at any given time within the building. Anticipated to state work after phase 1 august 16 2016 ![]() ![]() Client: Boston Public Health Comm | Permit type: Bfd sprinkler system | Permit id: Sprk572341 | Parcel: 0801420000 | |||||
SCORE 82 201201 Brookline Av Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with building impairment coordinator (527 cmr 1. Section 16. 3. 2) so that only one zone is impaired at any given time within the building ![]() ![]() Permit type: Bfd sprinkler system | Permit id: Sprk550026 | |||||
SCORE 82 25 Harvard St Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards ; the requirements of nfpa 13 section 8. 17. 4. 6. 2 shall be addressed with isd ![]() ![]() Permit type: Bfd sprinkler system | Permit id: Sprk579444 | |||||
SCORE 82 3 Longwood Av Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards....... Coordinate sprinkler;impairment with buildings listed;impairment coordinator so that only one zone is impaired at any given time within the building ![]() ![]() Permit type: Bfd sprinkler system | Permit id: Sprk589520 | |||||
SCORE 82 267 Charles St Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with building impairment coordinator (527 cmr 1. Section 16. 3. 2) so that only one zone is impaired at any given time within the building. ![]() ![]() Client: Mass Gen Eye * Ear Inf | Permit type: Bfd sprinkler system | Permit id: Sprk563496 | Parcel: 0300381001 | |||||
SCORE 82 111 Court St Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards....... Coordinate sprinkler;impairment with buildings listed;impairment coordinator so that only one zone is impaired at any given time within the building ![]() ![]() Client: Ames Investor Llc | Permit type: Bfd sprinkler system | Permit id: Sprk602613 | Parcel: 0302885000 | |||||
SCORE 82 109 Brookline Av Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with buildings listed;impairment coordinator (per buildings nfpa 241 report )so that only one zone is impaired at any given time within the building ![]() ![]() Client: Hub Properties Trust | Permit type: Bfd sprinkler system | Permit id: Sprk569335 | Parcel: 2100071000 | |||||
SCORE 82 161209 Cambridge St Boston Ma Install new sprinkler system on level 7 of 165 cambridge st (charles river plaza). Space is currently empty and protected with temporary heat detectors (see approved bfd permit attached and supplemental jcc impairment letter). Installation to conform with nfpa and 780cmr requirements ![]() ![]() Client: Charles River Plaza Primary | Permit type: Bfd sprinkler system | Permit id: Sprk542594 | Parcel: 0300660010 | |||||
SCORE 82 125 Summer St Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with buildings listed;impairment coordinator so that only one zone is impaired at any given time within the building ![]() ![]() Client: Opg 125 Summer Owner (de)llc | Permit type: Bfd sprinkler system | Permit id: Sprk568196 | Parcel: 0304256000 | |||||
SCORE 82 273 Charles St Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with building impairment coordinator (527 cmr 1. Section 16. 3. 2) so that only one zone is impaired at any given time within the building ![]() ![]() Client: General Hospital Corp | Permit type: Bfd sprinkler system | Permit id: Sprk557098 | Parcel: 0300371000 | |||||
SCORE 82 1725 Blackfan St Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards....... Coordinate sprinkler;impairment with buildings listed;impairment coordinator so that only one zone is impaired at any given time within the building ![]() ![]() Client: Childrens Hospital Med Cntr | Permit type: Bfd sprinkler system | Permit id: Sprk587371 | Parcel: 0401894000 | |||||
SCORE 82 ![]() ![]() Client: Diabetes Foundation Inc | Permit type: Bfd sprinkler system | Permit id: Sprk472938 | Parcel: 0401988000 | |||||
SCORE 82 15 Marina Park Dr Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with building impairment coordinator (527 cmr 1. Section 16. 3. 2) so that only one zone is impaired at any given time within the building. ![]() ![]() Client: Fan Pier Development Llc | Permit type: Bfd sprinkler system | Permit id: Sprk564178 | Parcel: 0602671025 | |||||
SCORE 82 55 Thomson Pl Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with buildings listed;impairment coordinator so that only one zone is impaired at any given time within the building ![]() ![]() Client: Fifty 5 Thomson St Invest Lp | Permit type: Bfd sprinkler system | Permit id: Sprk581166 | Parcel: 0602654001 | |||||
SCORE 82 Blossom St Boston Ma Only one floor shall be impaired at a time and the entire sprinkler system for that floor shall be fully restored that day. The impairment of the sprinkler system shall be coordinated with the designated building impairment coordinator. ![]() ![]() Client: General Hospital Corp | Permit type: Bfd sprinkler system | Permit id: Sprk584866 | Parcel: 0300370000 | |||||
SCORE 82 2022 Liberty Dr South Boston Ma Install new sprinkler system per 7 cmr & nfpa 13 14 requirements. This is a renewal of an existing permit for 20-22 liberty dr (fan pier c) which expires on 5 28 2015 (see attached) ![]() ![]() Client: Fan Pier Development Llc | Permit type: Bfd sprinkler system | Permit id: Sprk468925 | Parcel: 0602671025 | |||||
SCORE 82 3 Longwood Av Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with building impairment coordinator (527 cmr 1. Section 16. 3. 2) so that only one zone is impaired at any given time within the building ![]() ![]() Client: Childrens Hospital Corp | Permit type: Bfd sprinkler system | Permit id: Sprk565205 | Parcel: 0401870000 | |||||
SCORE 82 ![]() ![]() Client: Diabetes Foundation Inc | Permit type: Bfd sprinkler system | Permit id: Sprk459910 | Parcel: 0401988000 | |||||
SCORE 82 110112 Southampton Boston Ma Jcc job# 873191 - install new sprinkler system on 2nd floor of 112 southampton street. Perform 1 day test and tie-in. (new homeless shelter). This is phase 1 of the project. ![]() ![]() Client: City Of Boston | Permit type: Bfd sprinkler system | Permit id: Sprk439982 | Parcel: 0801027012 | |||||
SCORE 82 ![]() ![]() Client: Harvard Re Allston Inc | Permit type: Bfd sprinkler system | Permit id: Sprk464451 | Parcel: 2200862000 | |||||
SCORE 82 22 Liberty Dr Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards....... Coordinate sprinkler;impairment with buildings listed;impairment coordinator so that only one zone is impaired at any given time within the building ![]() ![]() Client: Fan Pier Development Llc | Permit type: Bfd sprinkler system | Permit id: Sprk599861 | Parcel: 0602671025 | |||||
SCORE 82 Liberty Dr Boston Ma Installation of a new sprinkler system in new 14 story building per nfpa13 and 7 cmr ![]() ![]() Client: Fan Pier Development Llc | Permit type: Bfd sprinkler system | Permit id: Sprk603479 | Parcel: 0602671025 | |||||
SCORE 82 22012209 Washington Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards....... Coordinate sprinkler;impairment with buildings listed;impairment coordinator so that only one zone is impaired at any given time within the building ![]() ![]() Client: Madison Washington Ii Llc | Permit type: Bfd sprinkler system | Permit id: Sprk605400 | Parcel: 0902478000 | |||||
SCORE 82 354364 Longwood Av Boston Ma Relocation of fire department connection check valve bfd paid detail required ![]() ![]() Client: Diabetes Foundation Inc | Permit type: Bfd sprinkler system | Permit id: Sprk455032 | Parcel: 0401988000 | |||||
SCORE 82 149 Thirteenth St Charlestown Ma Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with buildings listed;impairment coordinator so that only one zone is impaired at any given time within the building ![]() ![]() Client: Constitution Office Park Le | Permit type: Bfd sprinkler system | Permit id: Sprk583820 | Parcel: 0203510451 | |||||
SCORE 82 149 Thirteenth St Charlestown Ma Installation shall comply with the requirements of 7 cmr and nfpa standards....... Coordinate sprinkler;impairment with buildings listed;impairment coordinator so that only one zone is impaired at any given time within the building ![]() ![]() Client: Constitution Office Park Le | Permit type: Bfd sprinkler system | Permit id: Sprk595353 | Parcel: 0203510451 | |||||
SCORE 82 125 Summer St Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with buildings listed;impairment coordinator so that only one zone is impaired at any given time within the building bfd paid detail required ![]() ![]() Client: Opg 125 Summer Owner (de)llc | Permit type: Bfd sprinkler system | Permit id: Sprk582880 | Parcel: 0304256000 | |||||
SCORE 82 149 Thirteenth St Charlestown Ma Relocate sprinkler branch line due to new ahu being installed in building 149 per nfpa 13 and 7 cmr. ![]() ![]() Client: Constitution Office Park Le | Permit type: Bfd sprinkler system | Permit id: Sprk601496 | Parcel: 0203510451 | |||||
SCORE 82 99111 Seaport Bl Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with building impairment coordinator (527 cmr 1. Section 16. 3. 2) so that only one zone is impaired at any given time within the building ![]() ![]() Client: Ms Boston Seaport Llc | Permit type: Bfd sprinkler system | Permit id: Sprk548830 | Parcel: 0602640030 | |||||
SCORE 82 75 Francis St Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards....... Coordinate sprinkler;impairment with buildings listed;impairment coordinator so that only one zone is impaired at any given time within the building ![]() ![]() Client: Brigham& Womens Hosp Inc | Permit type: Bfd sprinkler system | Permit id: Sprk595706 | Parcel: 0401896000 | |||||
SCORE 82 333 Longwood Av Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with buildings listed;impairment coordinator so that only one zone is impaired at any given time within the building ![]() ![]() Client: Chb Properties Inc | Permit type: Bfd sprinkler system | Permit id: Sprk576146 | Parcel: 0401855000 | |||||
SCORE 82 125 Summer St Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with building impairment coordinator (527 cmr 1. Section 16. 3. 2) so that only one zone is impaired at any given time within the building. ![]() ![]() Client: Opg 125 Summer Owner (de)llc | Permit type: Bfd sprinkler system | Permit id: Sprk563561 | Parcel: 0304256000 | |||||
SCORE 82 8082 Fenwood Rd Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards ![]() ![]() Client: Commonwealth Of Mass | Permit type: Bfd sprinkler system | Permit id: Sprk557237 | Parcel: 1000319000 | |||||
SCORE 82 99111 Seaport Bl Boston Ma Only one zone shall be impaired at any given time within the building.. Coordinate impairment with the buildings impairment coordinator in accordance with 527 cmr 1. 00 ![]() ![]() Client: Ms Boston Seaport Llc | Permit type: Bfd sprinkler system | Permit id: Sprk490168 | Parcel: 0602640030 | |||||
SCORE 82 225 Albany St Boston Ma Installation of new sprinkler system in new 6 story building per nfpa 13 14 24 and 7 cmr requirements. ![]() ![]() Client: Ink Block Three Llc | Permit type: Bfd sprinkler system | Permit id: Sprk579199 | Parcel: 0306730000 |