SCORE 56 South Capitol Street Southbound An Ramp To Suitland Parkway Se Southbound Washington Capitol Installation of 18 soil borings the diameter will be 6" between to 1 feet deep. The soil borings will be located in different section on public space- potomac ave sw and south capitol st se, south capitol st se and anacostia dr se, defense blvd and capitol st, suitland parkway se and capitol st, suitland parkway se and howard road se, south capitol st sw and anacostia drive se, and south capitol st se, as per site plans, tcp(s), work plans report, dc well construction form. Dc well schematic form. This project is for public space-ddot. Project. South capitol street project. Date: April 19, 2012 Contractor: E2cr Inc. E2cr Inc Client: Ddot Ddot | Permit type: Excavation; boring test pit (single) | Permit status: Cancel/withdrawn | Expiration date: April 29, 2013 |