Building Permits at South Capitol Street Southbound An Ramp To Suitland Parkway Se Southbound Washington Capitol


Estimated Price

Beds

Baths

Rooms

Sq.Ft.

Built:   Lot size:   Taxed:
RENOVATION HISTORY
Based on the information received from building department, associated with South Capitol Street Southbound An Ramp To Suitland Parkway Se Southbound Washington Capitol over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
SCORE
56
Installation of 18 soil borings the diameter will be 6" between to 1 feet deep. The soil borings will be located in different section on public space- potomac ave sw and south capitol st se, south capitol st se and anacostia dr se, defense blvd and capitol st, suitland parkway se and capitol st, suitland parkway se and howard road se, south capitol st sw and anacostia drive se, and south capitol st se, as per site plans, tcp(s), work plans report, dc well construction form. Dc well schematic form. This project is for public space-ddot. Project. South capitol street project.
Date:  April 19, 2012
Contractor: E2cr Inc. E2cr Inc

Client: Ddot Ddot | Permit type: Excavation; boring test pit (single) | Permit status: Cancel/withdrawn | Expiration date: April 29, 2013
2012/04/19056South Capitol Street Southbound An Ramp To Suitland Parkway Se Southbound Washington CapitolE2cr Inc. E2cr Inc
SCORE
89
Proposed work includes digging few pits as needed to access the existing electric pipe on the pepco transmission line and repair damaged portions of the pipe which are approximately located on the right hand side of suitland parkway se southbound at the beginning of the ramp to i-295 southbound. See attached traffic control plans for details. " extended restoration applicable as determined by siod."
Date:  January 23, 2013

Permit type: Excavation; repair electric ml conduit | Permit status: Permit expired | Expiration date: April 18, 2013 | Permit id: Pa78829
2013/01/23089South Capitol Street Southbound An Ramp To Suitland Parkway Se Southbound Washington CapitolPepco Its Successors And Assigns
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.