SCORE 100 1326 S 15th St Philadelphia Pa 191464802 Remove all loose and d3efective masonry and replace with new masonry Date: November 15, 2012 Contractor: Dd Fox Construction Llc Client: Richard Pyatt Annie Mae | Permit type: Alteration permit | Permit status: Completed | Completion date: December 5, 2012 | Permit id: 438267 | |||||
SCORE 100 1236 S 26th St Philadelphia Pa 191463840 Ez exterior wall coverings- for the application of exterior wall coverings as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: July 9, 2015 Contractor: Dd Fox Construction Llc Client: Harrison William Brain Willie Mae H W | Permit type: Alteration permit | Permit status: Completed | Completion date: August 10, 2015 | Permit id: 623486 | |||||
SCORE 100 50006 S 61st St Philadelphia Pa 191431013 For the complete demolition of a two-story building (iminently dangerous, l+i violation case no. 509727) as shown in approved plans. All pedestrian protection methods to be in place or streets closure permit issued prior to starting demolition activity. Date: March 24, 2016 Contractor: Dd Fox Construction Llc Client: Christ Of Calvary Church | Permit type: Demolition permit | Permit status: Completed | Completion date: April 25, 2016 | Permit id: 667370 | |||||
SCORE 100 11 S 24th St Philadelphia Pa 191462447 For the complete demolition of a two story attached structure. Structure accessory to the use of a retail store and single family dwelling. All permitted demolition activity to be in accordance with approved site safety demolition plan & such plan to be maintained on site at all times in accordance with code bulletin b-1302. Sidewalk closure required as reflected on approved site plan and in accordance with sectin 3306 of the ibc. Separate street closure permit required and to be on site at all times. Any deviation will require an amended building permit. Date: November 12, 2014 Contractor: Dd Fox Construction Llc Client: Cv Developers Llc | Permit type: Demolition permit | Permit status: Completed | Completion date: August 25, 2015 | Permit id: 551394 | |||||
SCORE 100 Date: September 26, 2013 Contractor: Dd Fox Construction Llc Client: Cv Developers Llc | Permit type: Alteration permit | Permit status: Completed | Completion date: May 4, 2015 | Permit id: 497266 | |||||
SCORE 100 Date: March 30, 2009 Contractor: Dd Fox Construction Llc Client: Jacbuilt Holdings Inc | Permit type: Demolition permit | Permit status: Completed | Completion date: June 11, 2013 | Permit id: 207580 | |||||
SCORE 100 2213 S 8th St Philadelphia Pa 191483100 Masonry front wall - remove existing _ story front masonry wall 15 x 26. Replace with new 8 inch masonry wall, (4" brick & 4" block) on existing foundation. Windows and door same location & shall comply with the 2009 international energy efficiency code, u factor of . 35, and with emergency egress standards as per irc. New door opening for 36 inch door. Horizontal reinforcement (durawall) every 24 inches. Install returns into party walls for structural connection. Flash and seal roof to new front. No other work allowed under this permit. Date: November 17, 2016 Contractor: Dd Fox Construction Llc Client: Moore Eric Moore Kim | Permit type: Alteration permit | Permit status: Expired | Completion date: June 28, 2017 | Permit id: 737554 | |||||
SCORE 100 3636 Haverford Ave Philadelphia Pa 191041927 For complete demolition of exist. Two (2) story above grade plane detached masonry bearing & wood frame construction building via hand held tools & equipment only in accordance with approved site safety demolition plan. A covered walkway or sidewalk closure shall be reqd w in 5 ft. Of bldg. Facade per the phila. Bldg. Code sec. 3306; separate l+i & or dept. Of streets permits may be reqd prior to start of work. Date: December 27, 2016 Contractor: Dd Fox Construction Llc Client: Harte Investments Llc | Permit type: Demolition permit | Permit status: Completed | Completion date: January 30, 2017 | Permit id: 726186 | |||||
SCORE 100 418 Federal St Philadelphia Pa 191475208 New three story front wall on the existing foundation with 4"" cmu & 4" block. Wall ties required at every floor level. Door and windows to match original in size and location. Date: November 4, 2013 Contractor: Dd Fox Construction Llc Client: Lanken Paul N Lanken Mary J | Permit type: Alteration permit | Permit status: Completed | Completion date: December 13, 2013 | Permit id: 504099 | |||||
SCORE 100 1438 Parrish St Philadelphia Pa 191302225 Complete demo, this was submitted as one app, 1438 and 14 are separate properties, see child permit Date: November 27, 2015 Contractor: Dd Fox Construction Llc Permit type: Zoning/use permit | Permit status: Completed | Completion date: November 27, 2015 | Permit id: 633274 | |||||
SCORE 100 1438 Parrish St Philadelphia Pa 191302225 Complete demolition of one (1) story semi-detached structure per plans and in accordance with department code bulletin b-1302r. Maintain protection of adjacent properties, right-of-way and pedestrians at all times. Separate streets department approval required for right-of-way closures encroachments during construction. Date: November 27, 2015 Contractor: Dd Fox Construction Llc Permit type: Demolition permit | Permit status: Completed | Completion date: January 13, 2016 | Permit id: 631217 | |||||
SCORE 100 2403 E Norris St Philadelphia Pa 191252913 Seal windows and doors with plywood to make safe. Remove trash and debris. Remove rear shed. Seperate building and zoning permit required for replacement of shed Date: July 6, 2009 Contractor: Dd Fox Construction Llc Client: Norris Street Holdings Ll | Permit type: Demolition permit | Permit status: Completed | Completion date: August 6, 2009 | Permit id: 224922 | |||||
SCORE 100 1839 Gerritt St Philadelphia Pa 191464629 For the interior demolition of non load-bearing partition walls and ceilings as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: November 10, 2016 Contractor: Dd Fox Construction Llc Client: Wallace Tony | Permit type: Demolition permit | Permit status: Completed | Completion date: November 1, 2017 | Permit id: 735981 | |||||
SCORE 100 1919 S Newkirk St Philadelphia Pa 191452417 Interior demo of non-load bearing walls only, no structural work on this permit, interior alterations to include drywall, sheet rock throughout the bathroom and kitchen, new windows and doors in existing opening. Applicant agrees to limit the construction to comply with ez permit standard for interior alterations, dated january 2011. Deviation from the standard will result in revocation of this permit and imposition of further penalties. Separate permits required for plumbing, electrical and mechanical work Date: September 27, 2017 Contractor: Dd Fox Construction Llc Client: Wesley Wayne P | Permit type: Alteration permit | Permit status: Active | Completion date: October 18, 2017 | Permit id: 819629 | |||||
SCORE 100 Date: May 1, 2015 Contractor: Dd Fox Construction Llc Client: Tropea Anthony Piccolo Ronald | Permit type: Zoning/use permit | Permit status: Completed | Completion date: May 8, 2015 | Permit id: 604280 | |||||
SCORE 100 50006 S 61st St Philadelphia Pa 191431013 For the complete demolition of an existing two-story attached structure to comply l+i imminently dangerous violation (case no. 509727). Size and location as shown in plans. For use as a vacant lot. Date: March 24, 2016 Contractor: Dd Fox Construction Llc Client: Christ Of Calvary Church | Permit type: Zoning/use permit | Permit status: Completed | Completion date: March 24, 2016 | Permit id: 667365 | |||||
SCORE 100 1128 S 19th St Philadelphia Pa 191462938 Erection of a rear second and third floor addition above an existing one story portion and level iii alterations to an existing multi-family dwelling as per approved plans. Building must be fully sprinklered due to increased fire area. Separate permits required for mep & fire suppression work Date: March 10, 2015 Contractor: Dd Fox Construction Llc Client: Shipp George | Permit type: Addition permit | Permit status: Completed | Completion date: November 17, 2016 | Permit id: 586400 | |||||
SCORE 100 Date: December 21, 2010 Contractor: Dd Fox Construction Llc Client: Nguyen Huy Q | Permit type: Demolition permit | Permit status: Completed | Completion date: June 10, 2013 | Permit id: 317364 | |||||
SCORE 100 1353 S Taylor St Philadelphia Pa 191464020 Complete demolition of single family dwelling to create a vacant lot Date: December 21, 2010 Contractor: Dd Fox Construction Llc Client: Nguyen Huy Q | Permit type: Zoning/use permit | Permit status: Completed | Completion date: July 11, 2012 | Permit id: 317411 | |||||
SCORE 100 202933 S 7th St Philadelphia Pa 191482439 Remove wood above and below window at the first floor level and install masonry brick above and below window Date: November 23, 2010 Contractor: Dd Fox Construction Llc Client: Youth Enrichment Programs | Permit type: Alteration permit | Permit status: Completed | Completion date: January 30, 2012 | Permit id: 313343 | |||||
SCORE 100 2012 Wharton St Philadelphia Pa 191464336 For the complete demolition of an existing detached, one story structure. Structure to be demolished by hand and with mechanical equipment per site safety plan. Pedestrian protection to be in place prior to start of work and to be maintained during all demolition activities. Separate streets department permit require for closure of right of way. 21 day posting and notice required per a-303. 2. Asbestos remediation required prior to demolition. Date: April 1, 2016 Contractor: Dd Fox Construction Llc Permit type: Demolition permit | Permit status: Completed | Completion date: June 9, 2016 | Permit id: 673310 | |||||
SCORE 100 1808 Titan St Philadelphia Pa 191462927 New two story brick veneer on a concrete footing 30" below grade. Brick ties required every 2 sq. Ft Date: November 7, 2013 Contractor: Dd Fox Construction Llc Client: Asbury Zachary | Permit type: Alteration permit | Permit status: Completed | Completion date: October 1, 2014 | Permit id: 504106 | |||||
SCORE 100 723 E Thompson St Philadelphia Pa 191253442 Int demo ez interior demolition- for the interior demolition of non load-bearing partition walls and ceilings as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: April 21, 2015 Contractor: Dd Fox Construction Llc Client: Reutlinger Kristan T | Permit type: Demolition permit | Permit status: Completed | Completion date: February 23, 2016 | Permit id: 604490 | |||||
SCORE 100 1151 S Sydenham St Philadelphia Pa 191463113 For the complete demolition of an existing attached structure. Size and location as shown in plans. For use as a vacant lot. Date: August 1, 2016 Contractor: Dd Fox Construction Llc Client: Jeune Investments Llc Odagbodo Investments Llc | Permit type: Zoning/use permit | Permit status: Completed | Completion date: August 1, 2016 | Permit id: 676292 | |||||
SCORE 100 1151 S Sydenham St Philadelphia Pa 191463113 For the complete demolition of a two (2) story attached structure as shown in approved plans. Pedestrian protection methods to be in place prior to starting work. Site safety plan to remain on site at all times, and is to be approved by building inspector prior to starting any demolition. Date: August 1, 2016 Contractor: Dd Fox Construction Llc Client: Jeune Investments Llc Odagbodo Investments Llc | Permit type: Demolition permit | Permit status: Completed | Completion date: September 9, 2016 | Permit id: 676296 | |||||
SCORE 100 814 Tasker St Philadelphia Pa 191481240 Ez permit for masonry veneer call inspector for an intial inspection prior to the start of work. Contact streets department for dumpster permit and footway closure. Date: October 14, 2014 Contractor: Dd Fox Construction Llc Client: Wachter-Boettcher Sara Anbolton William Ellet | Permit type: Alteration permit | Permit status: Completed | Completion date: June 19, 2015 | Permit id: 567818 | |||||
SCORE 100 1821 S Taylor St Philadelphia Pa 191451814 Stucco_-_exterior plaster. Installation of these materials shall be in compliance with astmc926 and astmc1063 and the provisions of this code. R703. 6. 1 lath. All lath and lath attachments shall be of corrosion- resistant materials. Expanded metal or woven wire lath shall be attached with 1-1 2-inch-long (38 mm), 11 gage nails having a 7 16-inch (11. 1 mm) head, or 7 8-inch-long (22. 2 mm), 16 gage staples, spaced at no more than 6 inches (152 mm), or as otherwise approved. Contact inspector at district office for wall inspection prior to starting work Date: December 19, 2014 Contractor: Dd Fox Construction Llc Client: Brown Eroy Jr | Permit type: Alteration permit | Permit status: Expired | Completion date: October 7, 2015 | Permit id: 580922 | |||||
SCORE 100 2541 N Water St Philadelphia Pa 191251021 Complete demolition of exist. Attached building; size & location as shown in application. Use registration reqd prior to occupancy. Date: June 29, 2017 Contractor: Dd Fox Construction Llc Client: Bajrami Agim | Permit type: Zoning/use permit | Permit status: Completed | Completion date: June 29, 2017 | Permit id: 783881 | |||||
SCORE 100 17 Titan St Philadelphia Pa 191463034 Masonry front wall -remove existing 2 story front masonry wall . Replace with 8" masonry (4" brick and 4" block) on existing foundation and stucco finish. Windows and the doors to remain at the same location. Flash roof to new front. Install returns into party walls for structural connection. Flash and seal roof. Install 2 x 4 frame wall, insulate, and sheetrock on interior front wall for finish. Abutting sidewalk must be closed with fencing a minimum of 6? In height. Separate streets department permit required for sidewalk closure. Date: September 15, 2015 Contractor: Dd Fox Construction Llc Client: Midgette Julie | Permit type: Alteration permit | Permit status: Completed | Completion date: February 22, 2016 | Permit id: 638925 | |||||
SCORE 100 110614 Spring Garden St Philadelphia Pa 191233316 For the partial demolition of attached structure to remove rear one story portion and roof of remaining two story portion as per plans. Date: January 15, 2015 Contractor: Dd Fox Construction Llc Client: Greenway Plaza Llc | Permit type: Demolition permit | Permit status: Completed | Completion date: November 9, 2015 | Permit id: 567835 | |||||
SCORE 100 36466 Snyder Ave Philadelphia Pa 191482634 To remove 4" brown stone in front with and replace with 4 brick using wall ties and weep holes as per code Date: September 22, 2010 Contractor: Dd Fox Construction Llc Client: Regalbuto Joann | Permit type: Alteration permit | Permit status: Completed | Completion date: January 30, 2012 | Permit id: 302488 | |||||
SCORE 100 Date: October 17, 2014 Contractor: Dd Fox Construction Llc Client: Fred Emilio J | Permit type: Alteration permit | Permit status: Expired | Completion date: May 2, 2015 | Permit id: 568579 | |||||
SCORE 100 17 Willington St Philadelphia Pa 191210000 Interior demo of non-load bearing walls only,no structural work on this permit Date: September 27, 2017 Contractor: Dd Fox Construction Llc Client: Raykin Holdings Llc | Permit type: Demolition permit | Permit status: Active | Completion date: September 28, 2017 | Permit id: 819625 | |||||
SCORE 100 Date: April 27, 2010 Contractor: Dd Fox Construction Llc Client: Mckoy Denise | Permit type: Alteration permit | Permit status: Completed | Completion date: June 5, 2014 | Permit id: 275267 | |||||
SCORE 100 5665 Springfield Ave Philadelphia Pa 191434718 14 square feet, interior demolition of non load bearing walls and ceilings only. No other work allowed under this permit. Separate permits required for renovation. Date: September 14, 2012 Contractor: Dd Fox Construction Llc Client: Seldon Marsha | Permit type: Demolition permit | Permit status: Completed | Completion date: October 20, 2012 | Permit id: 427444 | |||||
SCORE 100 1421 Wharton St Philadelphia Pa 191463138 Interior demo of non-load bearing walls only,no structural work on this permit Date: March 23, 2017 Contractor: Dd Fox Construction Llc Client: Mao And Zhang Pa Llc | Permit type: Demolition permit | Permit status: Completed | Completion date: April 19, 2017 | Permit id: 768950 | |||||
SCORE 100 2112 Saint Albans St Philadelphia Pa 191461225 New brick front masonry front wall - remove existing front masonry wall. Replace with new 8 inch masonry wall, (4" brick & 4" block) on existing foundation. Windows and doors to comply with emergency egress standards per irc.. New door opening for 36 inch door. Flash roof to new front. Vertical reinforcement every 24 inches. Install returns into party walls for structural connection. Flash and seal roof. Install 2 x 4 frame wall, r-19 insulation and sheetrock on interior front wall for finish. No other work allowed under this permit. Date: January 4, 2016 Contractor: Dd Fox Construction Llc Client: Lee Alexander Baron Jillian | Permit type: Alteration permit | Permit status: Completed | Completion date: May 24, 2016 | Permit id: 661481 | |||||
SCORE 100 1707 Titan St Philadelphia Pa 191463033 Remove existing brick front and install new front on the existing foundation with 4 brick and 4 cinderblock for sfd. See comments in supplementary. Date: April 27, 2011 Contractor: Dd Fox Construction Llc Client: Harvey Carole | Permit type: Alteration permit | Permit status: Completed | Completion date: August 15, 2011 | Permit id: 337750 | |||||
SCORE 100 2627 S Rosewood St Philadelphia Pa 191454632 Interior demolition as per ez interior demolition permit standard. Date: October 9, 2015 Contractor: Dd Fox Construction Llc Client: Franceschetti Michael Franceschetti Justina | Permit type: Demolition permit | Permit status: Completed | Completion date: July 18, 2017 | Permit id: 644287 | |||||
SCORE 100 1345 S 6th St Philadelphia Pa 191475800 Interior demolition of non load-bearing partition walls on 1st, 2nd & 3rd floors. Separate permits required for building, electric, plumbing and hvac. Date: August 26, 2011 Contractor: Dd Fox Construction Llc Client: B C Fashion Llc | Permit type: Demolition permit | Permit status: Completed | Completion date: October 17, 2011 | Permit id: 360350 | |||||
SCORE 100 1345 S 6th St Philadelphia Pa 191475800 Demolish brick front wall and install new 4" cmu block with brick wall on existing foundation for sfd. Date: August 8, 2011 Contractor: Dd Fox Construction Llc Client: B C Fashion Llc | Permit type: Alteration permit | Permit status: Completed | Completion date: October 31, 2011 | Permit id: 357159 | |||||
SCORE 100 32 Turner St Philadelphia Pa 191212416 New stairs, windows, interior framing doors, drywall kitchrns, baths, basement entry painting - additional permits are required for electrical, plumbing, hvac and suppression Date: July 12, 2013 Contractor: Dd Fox Construction Llc Permit type: Alteration permit | Permit status: Completed | Completion date: June 3, 2014 | Permit id: 480415 | |||||
SCORE 100 32 Turner St Philadelphia Pa 191212416 Amendment to permit number 480415. Two family dwelling revised plan and build permit. Extension of permit # 480415 pursuant to pa act 46 of 20 as modified by act 87 of 2012. This extension to expire on july 1, 2016 unless extended by other portions of the philadelphia code. Contact district office to institute the required inspections. Date: August 27, 2013 Contractor: Dd Fox Construction Llc Permit type: Administrative permit | Permit status: Completed | Completion date: June 7, 2014 | Permit id: 490574 | |||||
SCORE 100 1331 Webster St Philadelphia Pa 191472633 Install 4 inch brick veneer on new concrete footing in front of existing masonry wall as per 2009 irc 703. 7. Maximum height: feet above foundation. Maximum thickness 5 inches. Window and door openings same size location. New concrete footing to be below frost line, ( inches). New wall shall be anchored to supporting wall with corrosion-resistant metal ties 24 inches on center horizontally and vertically. Provide 1 inch air space between walls. Provide weep holes and flashing above window and door openings. Provide capping, flashing and caulking at termination of wall to prevent water infiltration. An inspection of existing wall to be scheduled with inspector before work starts. Date: July 13, 2012 Contractor: Dd Fox Construction Llc Client: Rubley Maura Rubley William P | Permit type: Alteration permit | Permit status: Completed | Completion date: October 3, 2012 | Permit id: 416161 | |||||
SCORE 100 2747 Wharton St Philadelphia Pa 191463722 Repairs with like in kind material to correct open violations. Permit application in response to unsafe violations. To comply violation, completed work is to be inspected and approved as an appropriate repair to each violation. No engineers report submitted. Licensed contractor to assume responsibility of work. No other work this permit. Separate permits required for renovation. Date: December 31, 2012 Contractor: Dd Fox Construction Llc Client: Wilson Jack Wilson Diane Hannah | Permit type: Alteration permit | Permit status: Expired | Completion date: June 16, 2016 | Permit id: 443680 | |||||
SCORE 100 1401 Wharton St Philadelphia Pa 191463130 Interior demo of non-load bearing walls only,no structural work on this permit Date: November 7, 2016 Contractor: Dd Fox Construction Llc Client: Entrola Leah | Permit type: Demolition permit | Permit status: Completed | Completion date: April 18, 2017 | Permit id: 734959 | |||||
SCORE 100 Date: March 19, 2009 Contractor: Dd Fox Construction Llc Client: Harrison Inc | Permit type: Zoning/use permit | Permit status: Completed | Completion date: March 19, 2009 | Permit id: 205984 | |||||
SCORE 100 1413 S 18th St Philadelphia Pa 191464743 Remove and replace two story front facade on single family dwelling. New facade shall be four inch cmu with four inch brick facing. Date: December 16, 2013 Contractor: Dd Fox Construction Llc Client: Rachkis Bernadine | Permit type: Alteration permit | Permit status: Completed | Completion date: April 22, 2014 | Permit id: 511478 | |||||
SCORE 100 1413 S 18th St Philadelphia Pa 191464743 Remove and replace rotted floor joists at second floor level only. Interior renovation to include reframe interior partitions and sheetrock same. Install new stairs from first to second floor. Date: October 10, 2013 Contractor: Dd Fox Construction Llc Client: Rachkis Bernadine | Permit type: Alteration permit | Permit status: Completed | Completion date: April 18, 2016 | Permit id: 492108 | |||||
SCORE 100 1704 S 23rd St Philadelphia Pa 191451816 Remove termite damage on existing rear room @ grade level 1 story high, and rebuild walls with cement foundation and mud sill thence 2" x 6" walls insulated r-25 and new roof. No electrical & plumbing work, height to remain as existing, size to remain as existing. Stucco exterior wall. Date: July 6, 2010 Contractor: Dd Fox Construction Llc Client: Zack Valerie I | Permit type: Alteration permit | Permit status: Completed | Completion date: October 14, 2010 | Permit id: 289190 | |||||
SCORE 100 1304 S 18th St Philadelphia Pa 191464601 Interior demo of non-load bearing walls only,no structural work on this permit Date: June 13, 2017 Contractor: Dd Fox Construction Llc Client: Fratini Nicholas | Permit type: Demolition permit | Permit status: Completed | Completion date: August 23, 2017 | Permit id: 791465 | |||||
SCORE 100 1635 S 20th St Philadelphia Pa 191451444 Demo and reinstall front wall to existing foundation (install 4 brick and block on existing foundation.) Date: January 8, 2013 Contractor: Dd Fox Construction Llc Client: Ramirez David | Permit type: Alteration permit | Permit status: Completed | Completion date: March 4, 2013 | Permit id: 446864 | |||||
SCORE 100 1722 S 28th St Philadelphia Pa 191451613 Rebuild masonry retaining on the exixting foundation and install a concrete pation on top of the wall. Apply cement stucco to the rear wall Date: November 23, 2010 Contractor: Dd Fox Construction Llc Client: Phock Soeung | Permit type: Alteration permit | Permit status: Completed | Completion date: July 8, 2011 | Permit id: 313341 | |||||
SCORE 100 817 S 8th St Philadelphia Pa 191472820 Masonry rear wall replacement- remove existing 3 story rear masonry wall 15 x ft. Replace with new 8 inch masonry wall, (4" brick & 4" block) on existing foundation. Windows and door same location, shall comply with the 2009 international energy efficiency code, u factor of . 35, and shall comply with emergency egress standards as per irc. New door opening for 36 inch door. Horizontal reinforcement (durawall) every 24 inches. Install returns into party walls for structural connection. Flash and seal roof to new front. Install 2 x 4 frame wall, r-19 insulation and sheetrock on interior front wall for finish. No other work allowed under this permit. An inspection of existing wall to be scheduled with inspector before work starts. Date: June 21, 2016 Contractor: Dd Fox Construction Llc Client: Bado Bich | Permit type: Alteration permit | Permit status: Expired | Completion date: April 26, 2017 | Permit id: 701698 | |||||
SCORE 100 1529 N 15th St Philadelphia Pa 191214309 Interior demo of non-load bearing walls only, no structural work on permit Date: October 2, 2017 Contractor: Dd Fox Construction Llc Client: Templetown Properties Ii | Permit type: Demolition permit | Permit status: Active | Completion date: October 4, 2017 | Permit id: 820586 | |||||
SCORE 100 2518 Carpenter St Philadelphia Pa 191463908 Interior demo of non-load bearing walls,no structural work on this permit Date: April 8, 2016 Contractor: Dd Fox Construction Llc Client: Meadows Martin V Anderson Erline D | Permit type: Demolition permit | Permit status: Completed | Completion date: April 18, 2017 | Permit id: 682692 | |||||
SCORE 100 11 S 15th St Philadelphia Pa 191463139 Remove rear wall at 3rd floor and rebuild using 8" concrete block and stucco Date: June 11, 2008 Contractor: Dd Fox Construction Llc Client: Ngo Chhoug Meng Chen Hui Yu | Permit type: Alteration permit | Permit status: Completed | Completion date: December 16, 2008 | Permit id: 157660 | |||||
SCORE 100 1124 S 15th St Philadelphia Pa 191463139 Remove rear wall at 3rd floor and rebuild using 8" concrete block and stucco Date: June 4, 2008 Contractor: Dd Fox Construction Llc Client: Yates Beverly | Permit type: Alteration permit | Permit status: Completed | Completion date: December 16, 2008 | Permit id: 156270 | |||||
SCORE 100 1254 S 28th St Philadelphia Pa 191463634 Masonry facade replacement on one-family dwellings as per ez masonry facade permits standards Date: October 30, 2017 Contractor: Dd Fox Construction Llc Client: King Lynaire R | Permit type: Alteration permit | Permit status: Active | Completion date: November 7, 2017 | Permit id: 828074 | |||||
SCORE 100 1432 S 24th St Philadelphia Pa 191464001 Interior and exterior alterations extension of existing single family residence in accordance with approved plans. Use of existing foundations. Permit holder to provide signed and sealed statement from engineer indication use of existing foundations for the intended project is adequate. Ledgers approved only if in compliancw with Date: September 21, 2015 Contractor: Dd Fox Construction Llc Client: Stinnett Naheem | Permit type: Addition permit | Permit status: Expired | Completion date: June 28, 2017 | Permit id: 613309 | |||||
SCORE 100 103 N 53rd St Philadelphia Pa 191392613 Ez interior demolition- for the interior demolition of non load-bearing partition walls and ceilings as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: August 12, 2015 Contractor: Dd Fox Construction Llc Client: Bryant Edgar A | Permit type: Demolition permit | Permit status: Completed | Completion date: May 10, 2016 | Permit id: 631658 | |||||
SCORE 100 1845 N 22nd St Philadelphia Pa 191212110 For a change in occupancy classification to create six (6) dwelling units in an existing structure. Work to include interior non-bearing partitions, millwork, and finishes. Building shall be fully sprinklered. Separate permits required for mechanical, electrical, plumbing, and fire suppression systems. Date: April 11, 2017 Contractor: Dd Fox Construction Llc Client: Blackson Al | Permit type: Alteration permit | Permit status: Active | Completion date: August 25, 2017 | Permit id: 736025 | |||||
SCORE 100 2518 N 27th St Philadelphia Pa 191323522 For the complete demolition of a two-story structure as per plan. A covered walkway or sidewalk closure shall be required within 5 feet of building facade in accordance with section 3306 of the ibc. Separate building and or streets department permits may be required. Any deviation will require an amended building permit. Date: December 22, 2016 Contractor: Dd Fox Construction Llc Client: Hampton Willie | Permit type: Demolition permit | Permit status: Completed | Completion date: January 22, 2017 | Permit id: 726201 | |||||
SCORE 100 1843 N 22nd St Philadelphia Pa 191212110 Dry out basement. Tooth block and brick across crack in north party wall. Brace south party wall. Anchor front veneer to back up masonry and replace missing veneer. Per engineering letter -sfd Date: September 3, 2013 Contractor: Dd Fox Construction Llc Client: Blackson Al | Permit type: Alteration permit | Permit status: Completed | Completion date: June 9, 2014 | Permit id: 492427 | |||||
SCORE 100 1843 N 22nd St Philadelphia Pa 191212110 Remove brick wall. Install new brick wall on the existing foundation Date: September 26, 2013 Contractor: Dd Fox Construction Llc Client: Blackson Al | Permit type: Alteration permit | Permit status: Expired | Completion date: June 9, 2014 | Permit id: 497261 | |||||
SCORE 100 1263 S 23rd St Philadelphia Pa 191464251 Masonry front wall - remove existing 2 story front masonry wall. Replace with new 4 inch brick and 4 inch cmu wall, on existing foundation. Windows and door same location & shall comply with the 2009 international energy efficiency code, u factor of . 35, and with emergency egress standards as per irc. New door opening for 36 inch door. Horizontal reinforcement (durawall) every 24 inches. Install returns into party walls for structural connection, two at each floor level. Flash and seal roof to new front. Date: August 19, 2016 Contractor: Dd Fox Construction Llc Client: Barfield Samuel | Permit type: Alteration permit | Permit status: Expired | Completion date: June 29, 2017 | Permit id: 716290 | |||||
SCORE 100 1127 S 23rd St Philadelphia Pa 191462835 Permit to comply violation, case #241900. Demolish rear wall. Separate permit required for reconstruction and renovation of this property. Date: August 6, 2010 Contractor: Dd Fox Construction Llc Client: Cooper Harry L | Permit type: Alteration permit | Permit status: Completed | Completion date: January 13, 2015 | Permit id: 294982 | |||||
SCORE 100 Date: December 27, 2010 Contractor: Dd Fox Construction Llc Client: Cooper Harry L | Permit type: Addition permit | Permit status: Completed | Completion date: September 13, 2012 | Permit id: 314371 | |||||
SCORE 100 1127 S 23rd St Philadelphia Pa 191462835 4" brick front, 4" block on existing foundation use wall ties and weep holes as per code. Date: September 22, 2010 Contractor: Dd Fox Construction Llc Client: Cooper Harry L | Permit type: Alteration permit | Permit status: Completed | Completion date: April 18, 2011 | Permit id: 302482 | |||||
SCORE 100 Date: December 22, 2016 Contractor: Dd Fox Construction Llc Client: Hampton Willie | Permit type: Zoning/use permit | Permit status: Completed | Completion date: December 22, 2016 | Permit id: 744576 | |||||
SCORE 100 1536 S 24th St Philadelphia Pa 191464002 Interior demo of non-load bearing walls only, no structural work on this permit Date: October 18, 2017 Contractor: Dd Fox Construction Llc Client: Josh Thornton Ester | Permit type: Demolition permit | Permit status: Active | Completion date: November 8, 2017 | Permit id: 825081 | |||||
SCORE 100 1233 S 18th St Philadelphia Pa 191463045 Stucco basement wall and back wall with concrete basemnt for a sdf. For replacement of old sheetrock in various locations throughout the building. Date: November 27, 2009 Contractor: Dd Fox Construction Llc Client: Pino Johanna | Permit type: Alteration permit | Permit status: Completed | Completion date: July 7, 2011 | Permit id: 250236 | |||||
SCORE 100 1845 N 22nd St Philadelphia Pa 191212110 Remove brick wall. Install new brick wall on the existing foundation Date: September 26, 2013 Contractor: Dd Fox Construction Llc Client: Blackson Al | Permit type: Alteration permit | Permit status: Completed | Completion date: August 1, 2014 | Permit id: 497292 | |||||
SCORE 100 1252 S 28th St Philadelphia Pa 191463634 Make safe permit - make safe permit - permit application in response to unsafe violations on case #610372. To comply violation, remove existing 2 story front masonry wall 15 x 26. Replace with new 8 inch cmu wall on existing foundation to the underside of the cornice. Windows and door openings at same locations. New door opening for 36 inch door. Horizontal reinforcement every 24 inches. Install returns into party walls for structural connection. No other work allowed under this permit. Contact csu inspector for initial inspection at least 24 hours prior to starting work. No other work on this permit. Separate permits required for alterations, plumbing, electric and hvac. Date: November 16, 2017 Contractor: Dd Fox Construction Llc Client: Bates Anna | Permit type: Alteration permit | Permit status: Active | Completion date: November 27, 2017 | Permit id: 832743 | |||||
SCORE 100 Date: November 15, 2016 Contractor: Dd Fox Construction Llc Client: Blackson Al | Permit type: Mechanical permit | Permit status: Completed | Completion date: December 20, 2016 | Permit id: 736886 | |||||
SCORE 100 Date: May 8, 2012 Contractor: Dd Fox Construction Llc Client: Brumbelow Paula L Brumbelow Maryann T | Permit type: Demolition permit | Permit status: Completed | Completion date: October 29, 2012 | Permit id: 403783 | |||||
SCORE 100 5002 Rosehill St Philadelphia Pa 191203939 Remove exiting brick front and install new on the existing foundation with brick and block. Single family dwelling. New wall to be secured with either reinforcing bar into existing foundation or durawall. Reframe interior and drywall as required. Date: May 12, 2011 Contractor: Dd Fox Construction Llc Client: Riddick Quran W | Permit type: Alteration permit | Permit status: Completed | Completion date: December 16, 2011 | Permit id: 340610 | |||||
SCORE 100 Date: May 4, 2009 Contractor: Dd Fox Construction Llc Client: Harrison Inc | Permit type: Alteration permit | Permit status: Expired | Completion date: March 2, 2010 | Permit id: 213839 | |||||
SCORE 100 1405 S Patton St Philadelphia Pa 191463423 Complete demolition of existing structure. For use as a vacant lot (use registration permit required prior to occupancy). Date: December 19, 2016 Contractor: Dd Fox Construction Llc Client: Bullard Drucilla | Permit type: Zoning/use permit | Permit status: Completed | Completion date: February 23, 2017 | Permit id: 740860 | |||||
SCORE 100 1815 Daly St Philadelphia Pa 191453715 Ez interior demolition- for the interior demolition of non load-bearing partition walls and ceilings as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: July 15, 2016 Contractor: Dd Fox Construction Llc Client: Bull Tyler D | Permit type: Demolition permit | Permit status: Completed | Completion date: August 12, 2016 | Permit id: 707718 | |||||
SCORE 100 2222 N Chadwick St Philadelphia Pa 191324422 Masonry front wall -remove existing front masonry wall. Replace with new 8 inch masonry wall, (4" brick & 4" block) on existing foundation. Windows and doors to comply with emergency egress standards per irc.. New door opening for 36 inch door. Flash roof to new front. Vertical reinforcement every 24 inches. Install returns into party walls for structural connection. Separate permits for exterior alterations for finish work. Abutting sidewalk must be closed with fencing a minimum of 6? In height. Separate streets department permit required for sidewalk closure. Date: June 7, 2016 Contractor: Dd Fox Construction Llc Permit type: Alteration permit | Permit status: Completed | Completion date: January 1, 2017 | Permit id: 697925 | |||||
SCORE 100 1405 S Patton St Philadelphia Pa 191463423 For the complete demolition of an existing, two (2) story, imminently dangerous structure. Structure to be demolished by hand. Pedestrian protection to be in place prior to start of work and to be maintained during all demolition activities. A covered walkway or sidewalk closure shall be required within 8 feet of building facade in accordance with section 3306 of the ibc. Separate building and or streets department permits are required. 21 day posting and notice waved per a-303. 2 exception newly exposed exterior wall to be treated. Date: December 19, 2016 Contractor: Dd Fox Construction Llc Client: Bullard Drucilla | Permit type: Demolition permit | Permit status: Completed | Completion date: February 23, 2017 | Permit id: 740859 | |||||
SCORE 100 1033 S Randolph St Philadelphia Pa 191474021 Removal of existing front wall and construction of new wood stud and masonry veneer wall; construction of three (3) two (2) story rear wood frame addition over crawl space on reinforced concrete footing, cmu foundation wall with rated side walls and stucco rear wall. Roof deck included over two (2) story portion. Interior alterations including non-bearing partitions, braced walls per engineers calculations and finishes throughout. Separate permits for all mechanical, electrical and plumbing work. Date: August 28, 2015 Contractor: Dd Fox Construction Llc Client: Gary Elizabeth Marie Dalack Andrew John | Permit type: Addition permit | Permit status: Completed | Completion date: March 28, 2016 | Permit id: 618077 | |||||
SCORE 100 2527 Ellsworth St Philadelphia Pa 191463926 Installation of drywall on ceiling in single family dwelling Date: May 12, 2011 Contractor: Dd Fox Construction Llc Client: Rose Boulware | Permit type: Alteration permit | Permit status: Completed | Completion date: August 22, 2012 | Permit id: 340612 | |||||
SCORE 100 1925 Federal St Philadelphia Pa 191462916 Make safe permit to comply unsafe violation number 501367 for the removal and reconstruction of rear and partial side two story walls for an existing single family dwelling as per approved plans. Work to include temporary floor roof bracing as prescribed in plans. No interior work allowed on this permit Date: June 24, 2016 Contractor: Dd Fox Construction Llc Client: Abbot Aaron | Permit type: Alteration permit | Permit status: Completed | Completion date: August 31, 2016 | Permit id: 673232 | |||||
SCORE 100 17 Cecil B Moore Ave Philadelphia Pa 191213212 Amend demolition permit # 591321 to reflect a change in the previously approved contractor to a new contractor: dd fox construction, llc. New contractor agress to follow previously approved demolition site safety plan. No work to commence until all safety measures in place, inspected and approved by department separate streets department approval required for any right-of-way closures encroachments. Date: October 9, 2015 Contractor: Dd Fox Construction Llc Client: Todd Joseph Properties Ll | Permit type: Administrative permit | Permit status: Completed | Completion date: June 7, 2016 | Permit id: 635121 | |||||
SCORE 100 Date: May 12, 2011 Contractor: Dd Fox Construction Llc Permit type: Zoning/use permit | Permit status: Completed | Completion date: July 27, 2015 | Permit id: 340620 | |||||
SCORE 100 Date: May 12, 2011 Contractor: Dd Fox Construction Llc Permit type: Demolition permit | Permit status: Expired | Completion date: February 8, 2012 | Permit id: 340622 | |||||
SCORE 100 14 Parrish St Philadelphia Pa 191302225 Complete demo, filed as 1438, created since determined to be a separate property Date: November 27, 2015 Contractor: Dd Fox Construction Llc Permit type: Zoning/use permit | Permit status: Completed | Completion date: November 27, 2015 | Permit id: 636718 | |||||
SCORE 100 14 Parrish St Philadelphia Pa 191302225 Ez interior demolition- for the interior demolition of non load-bearing partition walls and ceilings as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. This work activity will be performed by a contractor licensed by city of philadelphia. Post this permit post the project information sign Date: June 25, 2015 Contractor: Dd Fox Construction Llc Permit type: Demolition permit | Permit status: Completed | Completion date: January 13, 2016 | Permit id: 620496 | |||||
SCORE 100 Date: July 12, 2017 Contractor: Dd Fox Construction Llc Client: Udley Joyce | Permit type: Alteration permit | Permit status: Active | Completion date: July 12, 2017 | Permit id: 799254 | |||||
SCORE 100 Date: September 27, 2016 Contractor: Dd Fox Construction Llc Client: Snyder James J | Permit type: Alteration permit | Permit status: Completed | Completion date: June 28, 2017 | Permit id: 725001 | |||||
SCORE 100 2142 Cross St Philadelphia Pa 191464549 Make safe permit - for remove existing 2 story front masonry wall. Replace with new 4" bricks and 4" blocks, on existing foundation. Windows and door same location & shall comply with the 2009 international energy efficiency code, u factor of . 35, and with emergency egress standards as per irc. New door opening for 36 inch door. Horizontal reinforcement (durawall) every 24 inches. Install returns into party walls for structural connection, two at each floor level. Flash and seal roof to new front, to resolve case #417162. Abutting sidewalk must be closed with fencing a minimum of 6 in height. Separate streets department permit required for sidewalk closure. A separate permit is required for any additional alterations that are not specifically addressed on case #417162. Date: June 21, 2016 Contractor: Dd Fox Construction Llc Client: Snyder Lonnie M | Permit type: Alteration permit | Permit status: Completed | Completion date: July 13, 2016 | Permit id: 701839 | |||||
SCORE 100 415 Manton St Philadelphia Pa 191475214 For the complete demolition of one attached three story structure for use as a single-family dwelling. All permitted demolition activity to be in accordance with approved site safety demolition plan & such plan to be maintained on site at all times in accordance with updated demolition regulation. Pedestrian protection fence to be in place on property as referenced in approved site plan and in accordance with section 3306 of the ibc. Separate permits required for all other work. Street sidewalk closure permit from streets department & license to be secured by person(s) causing demolition prior to commencement of permitted demolition work. Any deviation will require an amended building permit. Date: January 28, 2016 Contractor: Dd Fox Construction Llc Client: Kent Fraser | Permit type: Demolition permit | Permit status: Completed | Completion date: March 8, 2016 | Permit id: 662319 | |||||
SCORE 100 2052 Fernon St Philadelphia Pa 191451422 Make-safe permit issued to correct unsafe violation (case no. 494915). Work to include the removal and replacement of side and front walls (shoring to be provided to secure structure) as per submitted plans. No encroachments permitted in the public right-of-way prior to obtaining streets department approval. Date: July 5, 2016 Contractor: Dd Fox Construction Llc Client: Kim Thom Wanda Michidila De | Permit type: Alteration permit | Permit status: Completed | Completion date: September 23, 2016 | Permit id: 697894 | |||||
SCORE 100 1311 Mount Vernon St Philadelphia Pa 191233211 Level ii alterations (no change of occupancy) to remove existing three story rear portion of an attached single family dwelling by hand methods only as per approved plans. Separate permits required for any new construction Date: October 7, 2016 Contractor: Dd Fox Construction Llc Client: Mcfadden Angela | Permit type: Alteration permit | Permit status: Completed | Completion date: November 25, 2016 | Permit id: 726204 | |||||
SCORE 100 1143 S Cleveland St Philadelphia Pa 191462909 New two story front wall on the existing foundation with 4" block and 4" masonry veneer. Door and windows to match original in size and location. Date: November 7, 2013 Contractor: Dd Fox Construction Llc Client: Timothy Purnell & Edna | Permit type: Alteration permit | Permit status: Completed | Completion date: June 6, 2014 | Permit id: 504104 | |||||
SCORE 100 1932 Reed St Philadelphia Pa 191464637 Masonry front wall - remove existing 2 story front masonry wall. Replace with new 8 inch masonry wall, (4" brick & 4" block) on existing foundation. Windows and door same location, shall comply with the 2009 international energy efficiency code, u factor of . 35, and shall comply with emergency egress standards as per irc. New door opening for 36 inch door. Horizontal reinforcement (durawall) every 24 inches. Install returns into party walls for structural connection. Flash and seal roof to new front. Install 2 x 4 frame wall, r-19 insulation and sheetrock on interior front wall for finish. No other work allowed under this permit. Date: May 31, 2013 Contractor: Dd Fox Construction Llc Client: Bunch Georgette | Permit type: Alteration permit | Permit status: Completed | Completion date: June 5, 2014 | Permit id: 474692 | |||||
SCORE 100 Date: March 23, 2017 Contractor: Dd Fox Construction Llc Client: Bowman Cyrus Maurice | Permit type: Alteration permit | Permit status: Active | Completion date: July 28, 2017 | Permit id: 768953 | |||||
SCORE 100 Date: May 2, 2008 Contractor: Dd Fox Construction Llc Client: Cf Holdings Llc | Permit type: Alteration permit | Permit status: Expired | Completion date: January 13, 2015 | Permit id: 149535 | |||||
SCORE 100 1442 Point Breeze Ave Philadelphia Pa 191464522 Replace exterior wood joist at front 8 joist in total. If damage exceeds 8 joist inspector to be contacted prior to continuance of work. Date: September 27, 2016 Contractor: Dd Fox Construction Llc Client: Williams Corey | Permit type: Alteration permit | Permit status: Completed | Completion date: October 24, 2016 | Permit id: 725002 | |||||
SCORE 100 2222 Ridge Ave Philadelphia Pa 191212930 Permit application in response to unsafe violations. To comply violation # 435792 as per engineers report (engineer- daniel banks, p. E). Completed work is to be inspected and approved as an appropriate repair to each violation. No other work approved in this permit. Separate permits required for renovation. Date: August 4, 2014 Contractor: Dd Fox Construction Llc Client: Basi Victoria | Permit type: Alteration permit | Permit status: Expired | Completion date: May 8, 2015 | Permit id: 552642 | |||||
SCORE 100 80507 S Mildred St Philadelphia Pa 191472824 For the complete demolition of existing three story and one story structure. All construction must be in compliance with code bulletin no. B-1302r. Full sidewalk and street closure required as reflected on approved site plan and in accordance with section 3306 of the ibc. Separate street closure permit required prior to start of work. Any deviation will require an amended building permit. Separate plumbing permit required to seal existing lateral. 21 day notification to adjacent property owners to be waived as per section a-303. 2 of the phila administrative code. Date: May 1, 2015 Contractor: Dd Fox Construction Llc Client: Tropea Anthony Piccolo Ronald | Permit type: Demolition permit | Permit status: Expired | Completion date: June 2, 2015 | Permit id: 602427 | |||||
SCORE 100 Date: December 13, 2012 Contractor: Dd Fox Construction Llc Client: Cavemen Llc | Permit type: Zoning/use permit | Permit status: Completed | Completion date: December 13, 2012 | Permit id: 443353 | |||||
SCORE 100 345 Emily St Philadelphia Pa 191482623 Stucco exterior ez exterior wall coverings- for the application of exterior wall coverings as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans Date: November 9, 2015 Contractor: Dd Fox Construction Llc Client: Hunisch Robert Spera Dana | Permit type: Alteration permit | Permit status: Completed | Completion date: August 3, 2016 | Permit id: 650783 | |||||
SCORE 100 8 S Front St Philadelphia Pa 191474343 - remove existing brick front wall, 4 square feet. Frame new front wall with 2 x 4 studs . New framing to be structurally fastened to existing party walls and inspected prior to closing. Foundation wall to extend to first floor at 8 inch width. Physically tie in every 4 feet at adjoining wall. New windows and doors must comply with all glazing requirements of the 2009 international energy conservation code. Install capping, flashing and weep holes as per code requirements. R-13 insulation and sheetrock on interior front wall for finish. Date: February 24, 2017 Contractor: Dd Fox Construction Llc Client: Snyder James J | Permit type: Alteration permit | Permit status: Expired | Completion date: March 18, 2017 | Permit id: 762090 | |||||
SCORE 100 2002 Cecil B Moore Ave Philadelphia Pa 191214012 Ez interior demolition - for the interior demolition of non load-bearing partition walls and ceilings as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: April 9, 2015 Contractor: Dd Fox Construction Llc Client: Ripley Jade S | Permit type: Demolition permit | Permit status: Completed | Completion date: October 31, 2015 | Permit id: 601743 | |||||
SCORE 100 1151 E Passyunk Ave Philadelphia Pa 191475134 Ez interior demolition- for the interior demolition of non load-bearing partition walls and ceilings as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Post this permit post the project information sign Date: August 28, 2015 Contractor: Dd Fox Construction Llc Client: Epstein Royce | Permit type: Demolition permit | Permit status: Completed | Completion date: November 28, 2015 | Permit id: 635401 | |||||
SCORE 100 48 Merion Ave Philadelphia Pa 191314609 Ez exterior wall coverings-removal and reconstruction as per ez facade standards for the application of exterior wall coverings as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: September 19, 2017 Contractor: Dd Fox Construction Llc Client: Cleveland Betty R | Permit type: Alteration permit | Permit status: Active | Completion date: November 8, 2017 | Permit id: 817360 | |||||
SCORE 100 12 E Fletcher St Philadelphia Pa 191253504 For the complete demoltion of an attached two-story structure. Full sidewalk and street closure may be required as reflected on approved site plan and in accordance with section 3306 of the ibc. Separate street closure permit required prior to start of work. Any deviation will require an amended building permit. Date: October 11, 2016 Contractor: Dd Fox Construction Llc Client: Staab William Staab Susan | Permit type: Demolition permit | Permit status: Completed | Completion date: February 6, 2017 | Permit id: 702856 | |||||
SCORE 100 Date: December 27, 2016 Contractor: Dd Fox Construction Llc Client: Blaine Street Llc | Permit type: Zoning/use permit | Permit status: Completed | Completion date: September 1, 2017 | Permit id: 735407 | |||||
SCORE 100 2009 W Hunting Park Ave Philadelphia Pa 191402813 Complete demolition of existing buildings by hand . All permitted demolition activity to be in accordance with approved site safety demolition plan & such plan to be maintained on site at all times. Full sidewalk closure required as reflected on approved site plan and in accordance with section 3306 of the ibc. Separate street closure permit required prior to start of work. Se Date: December 27, 2016 Contractor: Dd Fox Construction Llc Client: Blaine Street Llc | Permit type: Demolition permit | Permit status: Completed | Completion date: March 8, 2017 | Permit id: 735436 | |||||
SCORE 100 Date: October 25, 2017 Contractor: Dd Fox Construction Llc Client: Board Of Home Missions Ofthe Ame Zion Church | Permit type: Alteration permit | Permit status: Active | Completion date: November 6, 2017 | Permit id: 826867 | |||||
SCORE 100 2054 Fernon St Philadelphia Pa 191451422 Re-construction of an existing attached single family dwelling to include replacement of all joists and portions of exterior wall as per approved plans. Work to include just floor and wall construction, no interior partitions or stair construction. Work to comply unsafe violation #494920 separate permits required for fit out of shell building Date: September 22, 2016 Contractor: Dd Fox Construction Llc Client: Hargaden Liam | Permit type: New construction permit | Permit status: Completed | Completion date: February 16, 2017 | Permit id: 716291 | |||||
SCORE 100 1906 Ingersoll St Philadelphia Pa 191214916 Interior demo ez interior demolition- for the interior demolition of non load-bearing partition walls and ceilings as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: July 13, 2015 Contractor: Dd Fox Construction Llc Client: Razadosi Properties Llc | Permit type: Demolition permit | Permit status: Completed | Completion date: April 3, 2016 | Permit id: 624177 | |||||
SCORE 100 Date: November 5, 2015 Contractor: Dd Fox Construction Llc Client: Battles Betty | Permit type: Alteration permit | Permit status: Completed | Completion date: February 26, 2016 | Permit id: 650188 | |||||
SCORE 100 1613 Cecil B Moore Ave Philadelphia Pa 191213209 Interior demo of non-load bearing walls only,no structural work on this permit Date: September 7, 2017 Contractor: Dd Fox Construction Llc Client: Raycey Holdings Llc | Permit type: Demolition permit | Permit status: Active | Completion date: October 2, 2017 | Permit id: 814263 | |||||
SCORE 100 649 Foulkrod St Philadelphia Pa 191202125 Remove all bowling lanes and partitions. Int demo. Remove front steps and platform in front of bldg to grade level. Date: March 22, 2013 Contractor: Dd Fox Construction Llc Client: Phang Kochi Zhu Xiu Lian | Permit type: Demolition permit | Permit status: Completed | Completion date: November 11, 2013 | Permit id: 460761 | |||||
SCORE 100 1731 Christian St Philadelphia Pa 191461907 Rebuild non-load bearing front wall with new brick and block wall on existing foundation to three family dwelling. Positive attachment to existing foundation and party wall required. Date: September 6, 2011 Contractor: Dd Fox Construction Llc Client: Hannah Lorraine | Permit type: Alteration permit | Permit status: Completed | Completion date: December 5, 2012 | Permit id: 361608 | |||||
SCORE 100 20 Cecil B Moore Ave Philadelphia Pa 191214012 Ez interior demolition - for the interior demolition of non load-bearing partition walls and ceilings as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: April 9, 2015 Contractor: Dd Fox Construction Llc Client: Ripley Jade S | Permit type: Demolition permit | Permit status: Completed | Completion date: October 31, 2015 | Permit id: 601720 | |||||
SCORE 100 525 Fitzwater St Philadelphia Pa 191473030 For complete demolition of a residential structure. This permit compiles violation #215026. All work shall be performed in a workmanship like manner and in accordance to departmental regulations. Date: September 22, 2009 Contractor: Dd Fox Construction Llc Client: Cai Andrew N Lee Clara | Permit type: Demolition permit | Permit status: Completed | Completion date: June 3, 2014 | Permit id: 238481 | |||||
SCORE 100 1723 S Cleveland St Philadelphia Pa 191452106 Interior demo of non-load bearing walls only,no structural work on this permit Date: November 7, 2016 Contractor: Dd Fox Construction Llc Client: Foschini Nicholas Foschini Gerald | Permit type: Demolition permit | Permit status: Completed | Completion date: October 30, 2017 | Permit id: 734956 | |||||
SCORE 100 13 S Harmony St Philadelphia Pa 191463212 12 stucco on side wall - exterior plaster. Installation of these materials shall be in compliance with astmc926 and astmc1063 and the provisions of this code. R703. 6. 1 lath. All lath and lath attachments shall be of corrosion- resistant materials. Expanded metal or woven wire lath shall be attached with 1-1 2-inch-long (38 mm), 11 gage nails having a 7 16-inch (11. 1 mm) head, or 7 8-inch-long (22. 2 mm), 16 gage staples, spaced at no more than 6 inches (152 mm), or as otherwise approved. Contact inspector at district office for wall inspection prior to starting work. Date: November 8, 2012 Contractor: Dd Fox Construction Llc Permit type: Alteration permit | Permit status: Completed | Completion date: December 5, 2012 | Permit id: 436895 | |||||
SCORE 100 13 S Harmony St Philadelphia Pa 191463212 12 square feet, interior demolition of non load bearing walls and ceilings only. No other work allowed under this permit. Separate permits required for renovation. No structural changes. Date: November 8, 2012 Contractor: Dd Fox Construction Llc Permit type: Demolition permit | Permit status: Expired | Completion date: May 12, 2014 | Permit id: 436871 | |||||
SCORE 100 2718 Federal St Philadelphia Pa 191463715 Complete demolition of single family dwelling to create vacant lot. Date: December 13, 2012 Contractor: Dd Fox Construction Llc Client: Cavemen Llc | Permit type: Demolition permit | Permit status: Completed | Completion date: December 19, 2013 | Permit id: 443352 | |||||
SCORE 100 1615 Cecil B Moore Ave Philadelphia Pa 191213209 Interior demo of non-load bearing walls only,no structural work on this permit Date: September 7, 2017 Contractor: Dd Fox Construction Llc Client: Raycey Holdings Llc | Permit type: Demolition permit | Permit status: Active | Completion date: October 2, 2017 | Permit id: 814266 | |||||
SCORE 100 762 N Croskey St Philadelphia Pa 191302608 Masonry front wall - remove existing 2 story front masonry wall 15 x 30. Replace with new 8 inch masonry wall, (4" brick & 4" block) on existing foundation. Windows and door same location, shall comply with 2009 internation energy efficiency code, u factor of . 35 & shall comply with emergency egress standards as per irc. New door opening for 36 inch door. Horizontal reinforcement (durawall) every 24 inches. Install returns into party walls for structural connection. Flash and seal roof to new front. Install 2 x 4 frame wall, r-19 insulation and sheetrock on interior front wall for finish. No other work allowed under this permit. Date: February 22, 2013 Contractor: Dd Fox Construction Llc Client: Alfier Nickolas A Alfier Joseph A | Permit type: Alteration permit | Permit status: Completed | Completion date: May 22, 2013 | Permit id: 455157 | |||||
SCORE 100 1908 Ingersoll St Philadelphia Pa 191214916 For the complete demolition of the exisitng structure. For use as a vacant lot. Date: October 9, 2015 Contractor: Dd Fox Construction Llc Client: Razadosi Properties Llc | Client Company: Razadoski Properties Llc | Permit type: Zoning/use permit | Permit status: Completed | Completion date: October 9, 2015 | Permit id: 633271 | |||||
SCORE 100 Date: August 3, 2015 Contractor: Dd Fox Construction Llc Client: Razadosi Properties Llc | Client Company: Razadoski Properties Llc | Permit type: Demolition permit | Permit status: Completed | Completion date: April 3, 2016 | Permit id: 629073 | |||||
SCORE 100 1908 Ingersoll St Philadelphia Pa 191214916 For the complete demolition of all existing structure on the lot. Demolition of 1906 and 1908 ingersoll st to be completed in conjunction. Existing party walls to be demolished as part of approved permit. All work to be done by hand and in a horizontal manner. Protection of pedestrians to be maintained during all demolition activities. Separate permits required for sidewalk closure. See a p no 631223 for approved plans and supplemental documentation. 2 4 16 owner was issued permit #631228 Date: February 4, 2016 Contractor: Dd Fox Construction Llc Client: Razadosi Properties Llc | Client Company: Razadoski Properties Llc | Permit type: Demolition permit | Permit status: Completed | Completion date: March 31, 2016 | Permit id: 631228 | |||||
SCORE 100 2447 Federal St Philadelphia Pa 191462431 Interior demo of non-load bearing walls only, no structural work on this permit Date: June 8, 2017 Contractor: Dd Fox Construction Llc Client: Brooks Carolyn Y | Permit type: Demolition permit | Permit status: Completed | Completion date: September 20, 2017 | Permit id: 790469 | |||||
SCORE 100 1335 S Colorado St Philadelphia Pa 191464704 1 square feet of interior alterations within a single family dwelling. Applicants agrees to limit the construction to comply with ez permit standard for interior dated february 2007. Any deviations from this standard will result in the revocation of this permit and the imposition of further penalties Date: April 27, 2010 Contractor: Dd Fox Construction Llc Client: Brown Viola Andrews Donya | Permit type: Alteration permit | Permit status: Completed | Completion date: September 1, 2011 | Permit id: 275181 | |||||
SCORE 100 1727 Manton St Philadelphia Pa 191463017 Masonry front wall with veneer - remove existing brick front wall, square feet. Frame new front wall with 2 x 6 studs and plywood sheathing. New framing to be structurally fastened to existing party walls and inspected prior to starting brickwork. Foundation wall to extend to first floor at 8 inch width. Start 4 inch brick veneer at first floor level, install brick ties every 32 inches, vertical and horizontal. Physically tie in every 4 feet at adjoining wall. Windows and door same location. Install capping, flashing and weep holes as per code requirements. Date: October 17, 2013 Contractor: Dd Fox Construction Llc Client: Nato Ian | Permit type: Alteration permit | Permit status: Completed | Completion date: April 22, 2014 | Permit id: 501102 | |||||
SCORE 100 1731 Christian St Philadelphia Pa 191461907 Revisions to prior permit ap326790, permit to correct dangerous conditions with existing rear footing foundation. Remove existing rear footings and construct new footings, in conjunction with rear 3rd floor addition. All prior requirements remain, must adequately brace and protect adjacent property structure foundation, walls, roof. Date: November 25, 2011 Contractor: Dd Fox Construction Llc Client: Hannah Lorraine | Permit type: Alteration permit | Permit status: Completed | Completion date: May 17, 2012 | Permit id: 371661 | |||||
SCORE 100 14 Parrish St Philadelphia Pa 191302225 See asbestos report complete demolition of four (4) story attached corner structure per plans (earl f. Buser, pe 012184e) in accordance with department code bulletin b-1302r. Maintain protection of adjacent properties, right-of-way and pedestrians at all times. Separate streets department approval required for right-of-way closures encroachments during construction. See permit # 631217 for plans docs. Date: November 27, 2015 Contractor: Dd Fox Construction Llc Permit type: Demolition permit | Permit status: Completed | Completion date: January 13, 2016 | Permit id: 649316 | |||||
SCORE 100 2755 Earp St Philadelphia Pa 191463713 Repair replace existing masonry wall with 8" cmu. Attach a 2 x ledger board and new joists with hangars as needed on 1st, 2nd and 3rd floors. New plywood on floors-sfd Date: February 27, 2012 Contractor: Dd Fox Construction Llc Client: Mccullough John Wilford Halliday Aaliyah | Permit type: Alteration permit | Permit status: Completed | Completion date: October 10, 2012 | Permit id: 390221 | |||||
SCORE 100 234 E Johnson St Philadelphia Pa 191441643 Make safe permit - for the removal of the collapsed porch roof to resolve case #501027. Clean-out debris and structurally stabilize site to make safe only. No other work this permit. Separate permits required for renovation. Make safe porch Date: April 3, 2017 Contractor: Dd Fox Construction Llc Client: Johnson Jannie N | Permit type: Alteration permit | Permit status: Completed | Completion date: April 3, 2017 | Permit id: 771654 | |||||
SCORE 100 2407 Grays Ferry Ave Philadelphia Pa 191462407 Interior alteration, reconstruct rear exterior walls as noted on plans, underpinning, a third floor addition and roof deck atop the third floor level. All work to be done in accordance with the approved plans and review documents. Date: July 28, 2015 Contractor: Dd Fox Construction Llc Client: Patnaik Chirag Kulshreshtha Megha | Permit type: Addition permit | Permit status: Completed | Completion date: August 12, 2016 | Permit id: 595393 | |||||
SCORE 100 2054 Fernon St Philadelphia Pa 191451422 Partial demolition of an existing semi-detached (vacant lot on one side) two story, single family masonry and wood building by hand methods. Work to include removal of all joists (see a p 716291 for plans). See also a p 6978 for removal and replacement of front and side walls. Work to comply unsafe violation #494920 work to start immediately due to unsafe violation Date: September 22, 2016 Contractor: Dd Fox Construction Llc Client: Hargaden Liam | Permit type: Demolition permit | Permit status: Completed | Completion date: September 26, 2016 | Permit id: 723378 | |||||
SCORE 100 2054 Fernon St Philadelphia Pa 191451422 Make-safe permit issued to correct unsafe violation (case no. 494920). Work to include the removal and replacement of side and front walls (shoring to be provided to secure structure) as per submitted plans. No encroachments permitted in the public right-of-way prior to obtaining streets department approval. Date: July 5, 2016 Contractor: Dd Fox Construction Llc Client: Hargaden Liam | Permit type: Alteration permit | Permit status: Completed | Completion date: September 23, 2016 | Permit id: 697890 | |||||
SCORE 100 1218 Christian St Philadelphia Pa 191473612 Interior demo of non-loadbearing walls only. No structural work on this permit. Date: July 20, 2017 Contractor: Dd Fox Construction Llc Client: Moa & Zhang Fl1 Llc | Permit type: Demolition permit | Permit status: Active | Completion date: August 17, 2017 | Permit id: 801539 | |||||
SCORE 100 1627 Christian St Philadelphia Pa 191462009 Demolition of existing three story structure; the portion of existing party walls attached to the adjacent structures will remain. Full sidewalk closure required as reflected on approved site plan and in accordance with section 3306 of the ibc. Separate street closure permit required prior to start of work. Any deviation will require an amended building permit. Date: August 8, 2014 Contractor: Dd Fox Construction Llc Client: Jmvp Partners Llc | Permit type: Demolition permit | Permit status: Completed | Completion date: June 2, 2015 | Permit id: 523187 | |||||
SCORE 100 1706 S Cleveland St Philadelphia Pa 191452107 Interior demo of non-load bearing walls only,no structural work on this permit Date: April 8, 2016 Contractor: Dd Fox Construction Llc Client: Bolduc Paul E | Permit type: Demolition permit | Permit status: Completed | Completion date: July 13, 2016 | Permit id: 682686 | |||||
SCORE 100 1731 Christian St Philadelphia Pa 191461907 Interior exterior alterations, structural modifications, remove replace new roof framing, partial floor framing, and exterior walls at 3rd level. Construct new decks balcony additions, replace windows, doors, new openings. Interior upgrades to finishes, renovations of existing 3 family dwelling. New partitions 1 hour stair enclosure, 1 hour floor ceiling dwelling unit separations, 1 hour exterior wall. No change in use classification, no co on record co attached on this permit as a matter of record, prior 3 family pre-code use. Date: April 8, 2011 Contractor: Dd Fox Construction Llc Client: Hannah Lorraine | Permit type: Alteration permit | Permit status: Expired | Completion date: January 7, 2013 | Permit id: 326790 | |||||
SCORE 100 2834 N 12th St Philadelphia Pa 191331229 Ez permit stadard alterations- for alterations to an existing one family dwelling as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: August 18, 2016 Contractor: Dd Fox Construction Llc Client: Builders Of Better Neighb | Permit type: Alteration permit | Permit status: Completed | Completion date: June 14, 2017 | Permit id: 716061 | |||||
SCORE 100 2834 N 12th St Philadelphia Pa 191331229 Make safe permit - for removal of tree and rebuild rear masonry wall and small portion (5x7) with like in kind material- of side wall to resolve case 440590. Abutting sidewalk must be closed with fencing a minimum of 6? In height. Separate streets department permit required for sidewalk closure. A separate permit is required for any additional alterations that are not specifically addressed on case 440590. Date: September 15, 2015 Contractor: Dd Fox Construction Llc Client: Builders Of Better Neighb | Permit type: Alteration permit | Permit status: Completed | Completion date: April 22, 2016 | Permit id: 638929 | |||||
SCORE 100 Date: July 3, 2017 Contractor: Dd Fox Construction Llc Client: Molina Fabian Jr Molina Maria | Permit type: Alteration permit | Permit status: Active | Completion date: July 17, 2017 | Permit id: 796913 | |||||
SCORE 100 2905 S 13th St Philadelphia Pa 191484947 Ez interior demolition- for the interior demolition of non load-bearing partition walls and ceilings as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: August 2, 2016 Contractor: Dd Fox Construction Llc Client: Liccio Alexa Rae | Permit type: Demolition permit | Permit status: Expired | Completion date: June 27, 2017 | Permit id: 711798 | |||||
SCORE 100 1906 Ingersoll St Philadelphia Pa 191214916 For the complete demolition of all existing structure on the lot. Demolition of 1906 and 1908 ingersoll st to be completed in conjunction. Existing party walls to be demolished as part of approved permit. All work to be done by hand and in a horizontal manner. Protection of pedestrians to be maintained during all demolition activities. Separate permits required for sidewalk closure. Date: February 4, 2016 Contractor: Dd Fox Construction Llc Client: Razadosi Properties Llc | Permit type: Demolition permit | Permit status: Completed | Completion date: March 31, 2016 | Permit id: 631223 | |||||
SCORE 100 2834 N 12th St Philadelphia Pa 191331229 Ez interior demolition- for the interior demolition of non load-bearing partition walls and ceilings as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: April 22, 2016 Contractor: Dd Fox Construction Llc Client: Builders Of Better Neighb | Permit type: Demolition permit | Permit status: Completed | Completion date: October 28, 2016 | Permit id: 686495 | |||||
SCORE 100 11 S 24th St Philadelphia Pa 191462447 To demo portion of roof, ceiling floor partly collapsed. Permit application in response to unsafe violations. To comply violation, completed work is to be inspected and approved as an appropriate repair to each violation. No engineers report submitted. Licensed contractor to assume responsibility of work. No other work this permit. Separate permits required for renovation. Date: July 3, 2013 Contractor: Dd Fox Construction Llc Client: Cv Developers Llc | Permit type: Alteration permit | Permit status: Completed | Completion date: May 13, 2015 | Permit id: 480414 | |||||
SCORE 100 2407 Grays Ferry Ave Philadelphia Pa 191462407 For the erection of a rear second story roof deck with communicating exterior spiral stairs per manufacturers installation instructions to a previously approved roof deck above third story per submitted plan. Date: January 11, 2016 Contractor: Dd Fox Construction Llc Client: Patnaik Chirag Kulshreshtha Megha | Permit type: Alteration permit | Permit status: Completed | Completion date: August 2, 2016 | Permit id: 654520 | |||||
SCORE 100 1906 Ingersoll St Philadelphia Pa 191214916 For the complete demolition of the exisitng structure. For use as a vacant lot. Date: October 9, 2015 Contractor: Dd Fox Construction Llc Client: Razadosi Properties Llc | Permit type: Zoning/use permit | Permit status: Completed | Completion date: October 9, 2015 | Permit id: 633270 | |||||
SCORE 100 764 S 9th St Philadelphia Pa 191472837 Ez interior demolition- for the interior demolition of non load-bearing partition walls and ceilings as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: January 28, 2016 Contractor: Dd Fox Construction Llc Client: Sabelli Paul J | Permit type: Demolition permit | Permit status: Expired | Completion date: October 4, 2016 | Permit id: 666494 | |||||
SCORE 100 2409 S Carlisle St Philadelphia Pa 191454421 Interior demo of non-load bearing walls only, no structural work on this permit Date: November 6, 2017 Contractor: Dd Fox Construction Llc Client: Mooney Louise | Permit type: Demolition permit | Permit status: Active | Completion date: November 6, 2017 | Permit id: 829739 | |||||
SCORE 100 20 Annin St Philadelphia Pa 191462809 For the complete demolition of a two (2) story structure as per code bulletin b-1302 and per approved documents. Full street closure permit required prior to the start of work. Date: January 15, 2015 Contractor: Dd Fox Construction Llc Client: Jamaiyar Shreya Das Nilanjan | Permit type: Demolition permit | Permit status: Completed | Completion date: May 13, 2015 | Permit id: 567825 | |||||
SCORE 100 2409 N Carlisle St Philadelphia Pa 191324018 Interior of demo of non-load bearing walls only,no structural work on this permit Date: November 3, 2017 Contractor: Dd Fox Construction Llc Client: Klein Jonathan M | Permit type: Demolition permit | Permit status: Active | Completion date: November 6, 2017 | Permit id: 829611 | |||||
SCORE 100 Date: March 5, 2010 Contractor: Dd Fox Construction Llc Client: Marino Anthony | Permit type: Demolition permit | Permit status: Completed | Completion date: June 11, 2013 | Permit id: 265323 | |||||
SCORE 100 1616 Brown St Philadelphia Pa 191302807 Make safe permit to comply case #425694; work to include: repairs to structurally stabilize and make watertight the rear wall, side wall and main roof. Demolition of interior debris to be allowed so that contractor to have access to damaged portions of the structure. A separate permit is required for any additional alterations that are not specifically addressed on case 425694. Date: January 12, 2016 Contractor: Dd Fox Construction Llc Client: M Organization Llc | Permit type: Alteration permit | Permit status: Expired | Completion date: June 3, 2016 | Permit id: 662958 | |||||
SCORE 100 1417 S Bancroft St Philadelphia Pa 191464720 Masonry front wall - remove existing 2 story front masonry wall 15w x 26 h. Replace with new 8 inch masonry wall, (4" brick & 4" block) on existing foundation. Windows and door same location. New door opening for 36 inch door. Flash roof to new front. Horizantal reinforcement every 24 inches. Install returns into party walls for structural connection. Flash and seal roof. Interior work not included on this permit. Separate permits required for interior alterations, plumbing, electric and hvac. Contact district inspector for initial inspection at least 24 hours prior to the start of work. Date: November 27, 2017 Contractor: Dd Fox Construction Llc Client: Underwood Darnella Underwood Glordia Nadine | Permit type: Alteration permit | Permit status: Active | Completion date: November 27, 2017 | Permit id: 834714 | |||||
SCORE 100 2302 Alter St Philadelphia Pa 191462416 Complete demolition. Full sidewalk closure required as reflected on approved site plan and in accordance with section 3306 of the ibc. Separate street closure permit required prior to start of work. Any deviation will require an amended building permit. Asbestos removal necessary prior to demo as per air. Date: August 8, 2014 Contractor: Dd Fox Construction Llc Client: Martin Lorin L Martin Dana J | Permit type: Demolition permit | Permit status: Completed | Completion date: June 2, 2015 | Permit id: 523182 | |||||
SCORE 100 440022 N Broad St Philadelphia Pa 191401933 For the complete demolition of an existing semi-detached structure. All other buildings on site to remain. Size and location as shown in application. For use as existing religious assembly in buildings to remain on site. Date: November 29, 2016 Contractor: Dd Fox Construction Llc Client: First Redemption Evangeli | Permit type: Zoning/use permit | Permit status: Completed | Completion date: November 29, 2016 | Permit id: 738745 | |||||
SCORE 100 2026 Reed St Philadelphia Pa 191464523 New facade to back of building ,replace on existing foundation Date: September 18, 2012 Contractor: Dd Fox Construction Llc Client: Wilson-Doffoney Charlene | Permit type: Alteration permit | Permit status: Completed | Completion date: May 28, 2013 | Permit id: 427851 | |||||
SCORE 100 440022 N Broad St Philadelphia Pa 191401933 Complete demolition of an existing semi-detached (yard on one side) three story, masonry and wood single family dwelling by hand methods. Permit to comply unsafe violation number 552599 all permitted demolition activity to be in accordance with approved site safety demolition plan & such plan to be maintained on site at all times in accordance with philadelphia administrative code. Complete sidewalk closure required as reflected on approved site plan and in accordance with section 3306 of the ibc. Separate street closure permit required prior to start of work. Any deviation will require an amended building permit. Work to begin immediately per unsafe violation no. 552599 Date: November 29, 2016 Contractor: Dd Fox Construction Llc Client: First Redemption Evangeli | Permit type: Demolition permit | Permit status: Completed | Completion date: May 23, 2017 | Permit id: 738746 | |||||
SCORE 100 1616 Brown St Philadelphia Pa 191302807 Ez interior demolition- for the interior demolition of non load-bearing partition walls and ceilings as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: June 22, 2016 Contractor: Dd Fox Construction Llc Client: M Organization Llc | Permit type: Demolition permit | Permit status: Completed | Completion date: August 19, 2017 | Permit id: 702150 | |||||
SCORE 100 1439 S Bouvier St Philadelphia Pa 191464724 For complete demolition of an attached structure. Size and location as per submitted plans Date: May 13, 2015 Contractor: Dd Fox Construction Llc Client: Clarence Carr | Client Company: C Carr Etux | Permit type: Zoning/use permit | Permit status: Completed | Completion date: November 21, 2015 | Permit id: 609478 | |||||
SCORE 100 1439 S Bouvier St Philadelphia Pa 191464724 For the complete demolition of an existing attached structure to comply imminently dangerous condition, in accordance with code bulletin b-1302r. Pedestrian protection to be provided in accordance to b-3306. Sidewalk closure permit to be secured for any closure of the right-of-way. Date: May 13, 2015 Contractor: Dd Fox Construction Llc Client: Clarence Carr | Client Company: C Carr Etux | Permit type: Demolition permit | Permit status: Expired | Completion date: June 8, 2015 | Permit id: 607062 | |||||
SCORE 100 1316 S Bouvier St Philadelphia Pa 191464703 Int demo- ez interior demolition- for the interior demolition of non load-bearing partition walls and ceilings as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: July 15, 2016 Contractor: Dd Fox Construction Llc Client: Lee Kyung Y | Permit type: Demolition permit | Permit status: Completed | Completion date: January 3, 2017 | Permit id: 707715 | |||||
SCORE 100 Date: October 10, 2013 Contractor: Dd Fox Construction Llc Client: Morris Nathaniel | Permit type: Alteration permit | Permit status: Completed | Completion date: June 13, 2014 | Permit id: 499908 | |||||
SCORE 100 Date: March 5, 2010 Contractor: Dd Fox Construction Llc Client: Marino Anthony | Permit type: Zoning/use permit | Permit status: Completed | Completion date: March 5, 2010 | Permit id: 265322 | |||||
SCORE 100 2009 S Garnet St Philadelphia Pa 191452802 Interior alterations to include drywall throughout, moisture resistant drywall in the bathroom and kitchen, new windows and doors in existing opening. Applicant agrees to limit the construction to comply with ez permit standard for interior alterations, dated january 2011. Deviation from the standard will result in revocation of this permit and imposition of further penalties. Separate permits required for plumbing, electrical and mechanical work Date: November 7, 2016 Contractor: Dd Fox Construction Llc Client: Esai Raj | Permit type: Alteration permit | Permit status: Completed | Completion date: August 30, 2017 | Permit id: 734966 | |||||
SCORE 100 2021 N 20th St Philadelphia Pa 191211540 Make safe - remove loose and hanging roof boards on case #515213 and clean up debris on property. Date: December 7, 2017 Contractor: Dd Fox Construction Llc Client: Jmmp Properties Llc | Permit type: Alteration permit | Permit status: Active | Completion date: December 8, 2017 | Permit id: 837838 | |||||
SCORE 100 Date: December 8, 2017 Contractor: Dd Fox Construction Llc Client: Pinckney Robert S Pinckney Virginia | Permit type: Alteration permit | Permit status: Active | Completion date: December 11, 2017 | Permit id: 837976 |