SCORE 89 222 Massachusetts Avenue Nw Washington Dc Capitol crossing support of excavation at 2nd st nw from e street to mass ave nw. Includes soldier beams, lagging, tiebacks, and associated excavation. Date: September 30, 2014 Contractor: Balfour Beatty Construction Dc Client: Lds Cph Llc | Permit type: Excavation; sheeting | |||||
SCORE 89 Date: October 28, 2014 Contractor: Balfour Beatty Construction Dc Client: Lds Cph Llc | Permit type: Excavation; caisson | Permit id: Pa102103 | |||||
SCORE 89 222 Massachusetts Avenue Nw Washington Dc Enabling package in i-395 for capitol crossing project. Work includes demolition of median barriers and shoulder barriers, removal of highway streetlight poles, installation of temporary trench drains, and demolition of pavement in the shoulder. Date: October 24, 2014 Contractor: Balfour Beatty Construction Dc Permit type: Paving; roadway | Permit status: Permit expired | Expiration date: February 19, 2016 | Permit id: Pa101902 | |||||
SCORE 89 222 Massachusetts Avenue Nw Washington Dc Demolition work north air rights tunnelon walls,tunnel lights, protective dust barriers Date: September 18, 2015 Contractor: Balfour Beatty Construction Dc Permit type: Mega projects; capitol crossing/i 395 tunnel | Permit status: Cancel/withdrawn | Expiration date: September 16, 2016 | |||||
SCORE 89 222 Massachusetts Avenue Nw Washington Dc Small temporary support of excavation notch is public space to allow access to installing mass ave bridge caissons previous permitted in the north block, of capitol crossing Date: September 30, 2015 Contractor: Balfour Beatty Construction Dc Permit type: Mega projects; capitol crossing/i 395 tunnel, excavation; sheeting & shoring (for buildings) | Permit status: Issued | Expiration date: August 31, 2016 | Permit id: Pa116911 | |||||
SCORE 89 222 Massachusetts Avenue Nw Washington Dc Sheeting & shoring design for the support of excavation to construct the mass ave i-395 highway entrance portal to the highway Date: November 2, 2015 Contractor: Balfour Beatty Construction Dc Permit type: Excavation; sheeting & shoring (for buildings), mega projects; capitol crossing/i 395 tunnel | Permit status: Issued | Expiration date: November 7, 2016 | Permit id: Pa118552 | |||||
SCORE 89 222 Massachusetts Avenue Nw Washington Dc Capitol crossing support of excavation at 2nd st nw from e street to mass ave nw. Includes soldier beams, lagging, tiebacks, and associated excavation. Date: February 16, 2016 Contractor: Balfour Beatty Construction Dc Permit type: Excavation; sheeting & shoring (for buildings) | Permit status: Issued | Expiration date: February 18, 2017 | Permit id: Pa100807-R1 | |||||
SCORE 89 222 Massachusetts Avenue Nw Washington Dc Soe for the north block, west & north sides of the capitol crossing project along 3rd s nw to g st & along mass ave from 3rd st nw to the mass ave bridge over i-395 Date: May 3, 2016 Contractor: Balfour Beatty Construction Dc Permit type: Excavation; sheeting & shoring (for buildings), mega projects; capitol crossing/i 395 tunnel | Permit status: Issued | Expiration date: November 27, 2016 | Permit id: Pa137191 | |||||
SCORE 89 222 Massachusetts Avenue Nw Washington Dc Sheeting & shoring design for the support of excavation to construct the mass ave i-395 highway entrance portal to the highway Date: October 13, 2016 Contractor: Balfour Beatty Construction Dc Permit type: Excavation; sheeting & shoring (for buildings), mega projects; capitol crossing/i 395 tunnel | Permit status: Issued | Expiration date: October 31, 2017 | Permit id: Pa118552-R1 | |||||
SCORE 89 222 Massachusetts Avenue Nw Washington Dc Sheeting & shoring line along the property line in public space, east side of 3rd st nw from f st, south to 501 3rd st nw Date: May 5, 2017 Contractor: Balfour Beatty Construction Dc Permit type: Excavation; sheeting & shoring (for buildings) | Permit status: Assigned | Expiration date: May 31, 2018 | Permit id: 0 | |||||
SCORE 89 222 Massachusetts Avenue Nw Washington Dc Approval of capitol crossings streetscape plans to include special paving (including shared street flush cub at g st nw), tree boxes and new trees, plantings and planter boxes, fixtures (arbor, seating, trash cans) and bike racks. Date: February 16, 2017 Contractor: Balfour Beatty Construction Dc Permit type: Paving; sidewalk | Permit status: Assigned | Expiration date: April 26, 2018 | Permit id: 0 | |||||
SCORE 89 222 Massachusetts Avenue Nw Washington Dc This package entails part of the foundation work for the capitol crossing project; specifically, the construction of 118 platform/deck caissons/drilled piles and slurry wall. The design and construction of these caissons is being permitted through dcra; this application is being submitted for ipma and toa approval for installation of the caissons in public space, not the design. We are attaching the notarized dcra structural certification form, and the plans should be approved without a structural check, as provided in section 106. 1. 4. 1 of the dc construction codes supplement of 2008, as requested. Date: October 24, 2014 Contractor: Balfour Beatty Construction Dc Permit type: Excavation; caisson foundation (capitol crossing only) | Permit status: Permit expired | Expiration date: June 5, 2016 | Permit id: Pa101909 | |||||
SCORE 89 222 Massachusetts Avenue Nw Washington Dc Construction of two highway entrance/exit portals, a tunnel, two bridges reconnecting f & g streets nw and a platform over i-395 Date: September 18, 2015 Contractor: Balfour Beatty Construction Dc Permit type: Mega projects; capitol crossing/i 395 tunnel, excavation; sheeting & shoring (for buildings) | Permit status: Permit expired | Expiration date: September 29, 2016 | Permit id: Pa116283 | |||||
SCORE 89 222 Massachusetts Avenue Nw Washington Dc Construction of two highway entrance/exit portals, a tunnel, two bridges reconnecting f & g streets nw and a platform over i-395 Date: September 1, 2016 Contractor: Balfour Beatty Construction Dc Permit type: Mega projects; capitol crossing/i 395 tunnel, excavation; sheeting & shoring (for buildings) | Permit status: Permit expired | Expiration date: September 29, 2017 | Permit id: Pa116283-R1 | |||||
SCORE 89 222 Massachusetts Avenue Nw Washington Dc Approval of capitol crossings street scape plans to include special paving (including shared street flush curb at g st nw), tree boxes and new trees, plantings and planter boxes, fixtures (arbor, seating, trash cans) and bike racks. Date: February 16, 2017 Contractor: Balfour Beatty Construction Dc Permit type: Paving; sidewalk | Permit status: Resubmitted | Expiration date: April 26, 2018 | Permit id: 0 | |||||
SCORE 89 222 Massachusetts Avenue Nw Washington Dc Construction of two highway entrance exit portals, a tunnel, two bridges reconnecting f & g streets nw and a platform over i-395 Date: September 5, 2017 Contractor: Balfour Beatty Construction Dc Permit type: Mega projects; capitol crossing/i 395 tunnel, excavation; sheeting & shoring (for buildings) | Permit status: Issued | Expiration date: September 29, 2018 | Permit id: Pa116283-R2 | |||||
SCORE 89 Date: February 12, 2016 Contractor: Balfour Beatty Construction Dc Permit status: 8 | Expiration date: February 19, 2016 | Permit id: Pa100807 | |||||
SCORE 89 Contractor: Balfour Beatty Construction Dc Permit status: 12 | Expiration date: May 31, 2018 | Permit id: 0 | |||||
SCORE 89 222 Massachusetts Avenue Nw Washington Dc Paving; sidewalk(s), fixture; bench(es), fixture; bike rack(s), fixture; planter box on sidewalk (exception), fixture; street fixture or furniture (exception), fixture; trash receptacle(s) (exception), landscaping; new tree space(s), landscaping; tree planting Contractor: Balfour Beatty Construction Dc Permit status: 12 | Expiration date: April 26, 2018 | Permit id: 0 | |||||
SCORE 89 222 Massachusetts Avenue Nw Washington Dc Excavation; sheeting & shoring (for buildings), mega projects; capitol crossing i 395 tunnel Date: May 23, 2016 Contractor: Balfour Beatty Construction Dc Permit status: 8 | Expiration date: November 27, 2016 | Permit id: Pa137191 | |||||
SCORE 89 222 Massachusetts Avenue Nw Washington Dc Mega projects; capitol crossing i 395 tunnel, excavation; sheeting & shoring (for buildings) Date: October 15, 2015 Contractor: Balfour Beatty Construction Dc Permit status: 8 | Expiration date: August 31, 2016 | Permit id: Pa116911 | |||||
SCORE 89 222 Massachusetts Avenue Nw Washington Dc Mega projects; capitol crossing i 395 tunnel, excavation; sheeting & shoring (for buildings) Date: April 26, 2016 Contractor: Balfour Beatty Construction Dc Permit status: 8 | Expiration date: September 29, 2016 | Permit id: Pa116283 | |||||
SCORE 89 Contractor: Balfour Beatty Construction Dc Permit status: 3 | Expiration date: September 16, 2016 | Permit id: 0 | |||||
SCORE 89 Date: June 8, 2015 Contractor: Balfour Beatty Construction Dc Permit status: 8 | Expiration date: June 5, 2016 | Permit id: Pa101909 | |||||
SCORE 89 222 Massachusetts Avenue Nw Washington Dc Paving; roadway(s), excavation; boring test pit (each addl), excavation; boring test pit (single), excavation; storm service lateral abandonment, over head work; pole removal (each addl), over head work; pole removal (single or first one), over head work; streetlight temporary removal Date: March 10, 2015 Contractor: Balfour Beatty Construction Dc Permit status: 8 | Expiration date: February 19, 2016 | Permit id: Pa101902 | |||||
SCORE 89 222 Massachusetts Avenue Nw Washington Dc Excavation; sheeting & shoring (for buildings), mega projects; capitol crossing i 395 tunnel Date: November 5, 2015 Contractor: Balfour Beatty Construction Dc Permit status: 8 | Expiration date: November 7, 2016 | Permit id: Pa118552 | |||||
SCORE 89 Contractor: Balfour Beatty Construction Dc Permit status: 3 | Expiration date: September 16, 2016 | Permit id: 0 | |||||
SCORE 89 222 Massachusetts Avenue Nw Washington Dc Paving; sidewalk(s), fixture; bench(es), fixture; bike rack(s), fixture; planter box on sidewalk (exception), fixture; street fixture or furniture (exception), fixture; trash receptacle(s) (exception), landscaping; new tree space(s), landscaping; tree planting, mega projects; capitol crossing i 395 tunnel Contractor: Balfour Beatty Construction Dc Permit status: 11 | Expiration date: April 26, 2018 | Permit id: 0 | |||||
SCORE 89 Date: July 20, 2017 Contractor: Balfour Beatty Construction Dc Permit status: 9 | Expiration date: July 20, 2018 | Permit id: Pa204969 | |||||
SCORE 89 222 Massachusetts Avenue Nw Washington Dc Mega projects; capitol crossing i 395 tunnel, excavation; sheeting & shoring (for buildings) Date: September 12, 2017 Contractor: Balfour Beatty Construction Dc Permit status: 9 | Expiration date: September 29, 2018 | Permit id: Pa116283-R2 |