Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 89 Capitol crossing support of excavation at 2nd st nw from e street to mass ave nw. Includes soldier beams, lagging, tiebacks, and associated excavation. Date: September 30, 2014 Contractor: Balfour Beatty Construction Dc Client: Lds Cph Llc | Permit type: Excavation; sheeting | |||||
SCORE 89 Installation of bridge caisson in i-395 Date: October 28, 2014 Contractor: Balfour Beatty Construction Dc Client: Lds Cph Llc | Permit type: Excavation; caisson | Permit id: Pa102103 | |||||
Location and size of three curb cuts for capitol crossing project in squares 564, 566 and 568. Date: January 7, 2015 Value: $1,380 Client: Lds Cph Llc | Permit type: Paving; driveway(s) | |||||
SCORE 89 Enabling package in i-395 for capitol crossing project. Work includes demolition of median barriers and shoulder barriers, removal of highway streetlight poles, installation of temporary trench drains, and demolition of pavement in the shoulder. Date: October 24, 2014 Contractor: Balfour Beatty Construction Dc Permit type: Paving; roadway | Permit status: Permit expired | Expiration date: February 19, 2016 | Permit id: Pa101902 | |||||
SCORE 86 Location and size of three curb cuts for capitol crossing project in squares 564, 566 and 568. Date: January 7, 2015 Contractor: Lds Cph Llc Permit type: Paving; driveway(s) new- commercial | Permit status: Revise and resubmit | Expiration date: February 26, 2016 | |||||
SCORE 89 Demolition work north air rights tunnelon walls,tunnel lights, protective dust barriers Date: September 18, 2015 Contractor: Balfour Beatty Construction Dc Permit type: Mega projects; capitol crossing/i 395 tunnel | Permit status: Cancel/withdrawn | Expiration date: September 16, 2016 | |||||
SCORE 89 Small temporary support of excavation notch is public space to allow access to installing mass ave bridge caissons previous permitted in the north block, of capitol crossing Date: September 30, 2015 Contractor: Balfour Beatty Construction Dc Permit type: Mega projects; capitol crossing/i 395 tunnel, excavation; sheeting & shoring (for buildings) | Permit status: Issued | Expiration date: August 31, 2016 | Permit id: Pa116911 | |||||
SCORE 89 Sheeting & shoring design for the support of excavation to construct the mass ave i-395 highway entrance portal to the highway Date: November 2, 2015 Contractor: Balfour Beatty Construction Dc Permit type: Excavation; sheeting & shoring (for buildings), mega projects; capitol crossing/i 395 tunnel | Permit status: Issued | Expiration date: November 7, 2016 | Permit id: Pa118552 | |||||
SCORE 89 Capitol crossing support of excavation at 2nd st nw from e street to mass ave nw. Includes soldier beams, lagging, tiebacks, and associated excavation. Date: February 16, 2016 Contractor: Balfour Beatty Construction Dc Permit type: Excavation; sheeting & shoring (for buildings) | Permit status: Issued | Expiration date: February 18, 2017 | Permit id: Pa100807-R1 | |||||
SCORE 89 Soe for the north block, west & north sides of the capitol crossing project along 3rd s nw to g st & along mass ave from 3rd st nw to the mass ave bridge over i-395 Date: May 3, 2016 Contractor: Balfour Beatty Construction Dc Permit type: Excavation; sheeting & shoring (for buildings), mega projects; capitol crossing/i 395 tunnel | Permit status: Issued | Expiration date: November 27, 2016 | Permit id: Pa137191 | |||||
To drill and construct (15) 6 inch diameter dewatering wells to 1 feet deep via mud rotary drilling method. Each well will be equipped with a 14 inch permanent surface casing to feet deep which will be removed up completion of dewatering activities. All drill spoils and fluids will be contained and disposed of per doee regulation. Date: June 1, 2016 Client: Sean Cahill Lds, Cph, Llc | Permit type: Excavation; monitoring well (each addl), excavation; monitoring well (single), mega projects; capitol crossing/i 395 tunnel | Permit status: Issued | Expiration date: October 6, 2016 | Permit id: Pa168513 | |||||
SCORE 96 Connect 222 massachusetts ave nw by building 31 feet of 12-way service conduit and miscellaneous equipment in sidewalk of 3rd st nw, 217 feet south of massachusetts ave nw, as indicated on attached print. Tcp site specific; ward 2; wr #3513350; cut #30126; walter altemburger/202-388-2576/waltemburger@pepco. Com (shorts/aclan) Date: June 27, 2016 Contractor: Potomac Electric Power Company Permit type: Excavation; electric connection (trench) | Permit status: Assigned | Expiration date: September 30, 2016 | |||||
To drill and construct (15) 6 inch diameter dewatering wells to 1 feet deep via mud rotary drilling method. Each well will be equipped with a 14 inch permanent surface casing to feet deep which will be removed up completion of dewatering activities. All drill spoils and fluids will be contained and disposed of per doee regulation. Date: September 19, 2016 Client: Sean Cahill Lds, Cph, Llc | Permit type: Excavation; monitoring well (each addl), excavation; monitoring well (single), mega projects; capitol crossing/i 395 tunnel | Permit status: Issued | Expiration date: December 5, 2016 | Permit id: Pa168513-R1 | |||||
SCORE 89 Sheeting & shoring design for the support of excavation to construct the mass ave i-395 highway entrance portal to the highway Date: October 13, 2016 Contractor: Balfour Beatty Construction Dc Permit type: Excavation; sheeting & shoring (for buildings), mega projects; capitol crossing/i 395 tunnel | Permit status: Issued | Expiration date: October 31, 2017 | Permit id: Pa118552-R1 | |||||
SCORE 98 To drill and construct (15) 6 inch diameter dewatering wells to 1 feet deep via mud rotary drilling method. Each well will be equipped with a 14 inch permanent surface casing to feet deep which will be removed up completion of dewatering activities. All drill spoils and fluids will be contained and disposed of per doee regulation. Date: September 19, 2016 Contractor: George King Client: Sean Cahill Lds, Cph, Llc | Permit type: Excavation; monitoring well (each addl), excavation; monitoring well (single), mega projects; capitol crossing/i 395 tunnel | Permit status: Permit expired | Expiration date: December 5, 2016 | Permit id: Pa168513-R1 | |||||
SCORE 86 Construction staging area Contractor: Lds Cph Llc Permit status: Withdrawn | Expiration date: September 1, 2015 | Permit id: 0 | |||||
SCORE 89 Excavation; sheeting & shoring (for buildings) Date: February 12, 2016 Contractor: Balfour Beatty Construction Dc Permit status: 8 | Expiration date: February 19, 2016 | Permit id: Pa100807 | |||||
SCORE 86 Paving; driveway(s) new- commercial Contractor: Lds Cph Llc Permit status: 10 | Expiration date: February 26, 2016 | Permit id: 0 | |||||
SCORE 86 Construction staging area Contractor: Lds Cph Llc Permit status: Withdrawn | Expiration date: April 11, 2016 | Permit id: 0 | |||||
SCORE 86 Construction staging area Date: October 21, 2015 Contractor: Lds Cph Llc Permit status: Expired | Expiration date: April 8, 2016 | Permit id: Pa10214790 | |||||
SCORE 86 Construction staging area Date: February 20, 2015 Contractor: Lds Cph Llc Permit status: Expired | Expiration date: August 22, 2015 | Permit id: Pa10177741 | |||||
SCORE 89 Excavation; sheeting & shoring (for buildings) Contractor: Balfour Beatty Construction Dc Permit status: 12 | Expiration date: May 31, 2018 | Permit id: 0 | |||||
SCORE 89 Paving; sidewalk(s), fixture; bench(es), fixture; bike rack(s), fixture; planter box on sidewalk (exception), fixture; street fixture or furniture (exception), fixture; trash receptacle(s) (exception), landscaping; new tree space(s), landscaping; tree planting Contractor: Balfour Beatty Construction Dc Permit status: 12 | Expiration date: April 26, 2018 | Permit id: 0 | |||||
SCORE 89 Excavation; sheeting & shoring (for buildings), mega projects; capitol crossing i 395 tunnel Date: May 23, 2016 Contractor: Balfour Beatty Construction Dc Permit status: 8 | Expiration date: November 27, 2016 | Permit id: Pa137191 | |||||
SCORE 89 Mega projects; capitol crossing i 395 tunnel, excavation; sheeting & shoring (for buildings) Date: October 15, 2015 Contractor: Balfour Beatty Construction Dc Permit status: 8 | Expiration date: August 31, 2016 | Permit id: Pa116911 | |||||
SCORE 89 Mega projects; capitol crossing i 395 tunnel, excavation; sheeting & shoring (for buildings) Date: April 26, 2016 Contractor: Balfour Beatty Construction Dc Permit status: 8 | Expiration date: September 29, 2016 | Permit id: Pa116283 | |||||
SCORE 89 Mega projects; capitol crossing i 395 tunnel Contractor: Balfour Beatty Construction Dc Permit status: 3 | Expiration date: September 16, 2016 | Permit id: 0 | |||||
SCORE 89 Excavation; caisson foundation (capitol crossing only) Date: June 8, 2015 Contractor: Balfour Beatty Construction Dc Permit status: 8 | Expiration date: June 5, 2016 | Permit id: Pa101909 | |||||
SCORE 89 Paving; roadway(s), excavation; boring test pit (each addl), excavation; boring test pit (single), excavation; storm service lateral abandonment, over head work; pole removal (each addl), over head work; pole removal (single or first one), over head work; streetlight temporary removal Date: March 10, 2015 Contractor: Balfour Beatty Construction Dc Permit status: 8 | Expiration date: February 19, 2016 | Permit id: Pa101902 | |||||
SCORE 89 Sheeting & shoring line along the property line in public space, east side of 3rd st nw from f st, south to 501 3rd st nw Date: May 5, 2017 Contractor: Balfour Beatty Construction Dc Permit type: Excavation; sheeting & shoring (for buildings) | Permit status: Assigned | Expiration date: May 31, 2018 | Permit id: 0 | |||||
SCORE 89 Approval of capitol crossings streetscape plans to include special paving (including shared street flush cub at g st nw), tree boxes and new trees, plantings and planter boxes, fixtures (arbor, seating, trash cans) and bike racks. Date: February 16, 2017 Contractor: Balfour Beatty Construction Dc Permit type: Paving; sidewalk | Permit status: Assigned | Expiration date: April 26, 2018 | Permit id: 0 | |||||
SCORE 89 Excavation; sheeting & shoring (for buildings), mega projects; capitol crossing i 395 tunnel Date: November 5, 2015 Contractor: Balfour Beatty Construction Dc Permit status: 8 | Expiration date: November 7, 2016 | Permit id: Pa118552 | |||||
SCORE 86 Construction staging area Date: March 21, 2016 Contractor: Lds Cph Llc Permit status: Expired | Expiration date: October 5, 2016 | Permit id: Pa10214790-R1 | |||||
SCORE 86 Construction staging area Date: August 3, 2016 Contractor: Lds Cph Llc Permit status: Expired | Expiration date: September 30, 2016 | Permit id: Pa10229134-R1 | |||||
SCORE 86 Construction staging area Contractor: Lds Cph Llc Permit status: Notpaid | Expiration date: September 30, 2016 | Permit id: 0 | |||||
SCORE 86 Construction staging area Date: September 30, 2016 Contractor: Lds Cph Llc Permit status: Expired | Expiration date: January 31, 2017 | Permit id: Pa10334774 | |||||
SCORE 86 Construction staging area Date: April 14, 2017 Contractor: Lds Cph Llc Permit status: Issued | Expiration date: October 11, 2017 | Permit id: Pa10395580 | |||||
SCORE 56 2" diameter direct-push soil borings to be advanced for observation of soils as part of an archaeological investigation. Total of 9 borings on proposed i-395 development from e to h street and 2nd to 3rd streets nw. Borings to be advanced with a compact direct-push rig on rubber tracks. Rig will be mobilized to the site on a standard pick-up truck with a trailer. All borings advanced on grass. Estimate 1 day for completion of all borings. A dcra building permit application is being submitted for one boring on private property as part of this project. Date: June 10, 2013 Contractor: Aecom Technical Services Permit status: Permit expired | Expiration date: August 8, 2013 | Permit id: Pa82545 | |||||
SCORE 86 Capitol crossing support of excavation at 2nd st nw from e street to mass ave nw. Includes soldier beams, lagging, tiebacks, and associated excavation. Date: February 12, 2016 Contractor: Lds Cph Llc Permit status: Permit expired | Expiration date: February 19, 2016 | Permit id: Pa100807 | |||||
SCORE 86 Installation of bridge caisson in i-395 Date: June 8, 2015 Contractor: Lds Cph Llc Permit status: Permit expired | Expiration date: December 10, 2015 | Permit id: Pa102103 | |||||
SCORE 86 Enabling package in i-395 for capitol crossing project. Work includes demolition of median barriers and shoulder barriers, removal of highway streetlight poles, installation of temporary trench drains, and demolition of pavement in the shoulder. Date: March 10, 2015 Contractor: Lds Cph Llc Permit status: Permit expired | Expiration date: February 19, 2016 | Permit id: Pa101902 | |||||
SCORE 86 This package entails part of the foundation work for the capitol crossing project; specifically, the construction of 118 platform deck caissons drilled piles and slurry wall. The design and construction of these caissons is being permitted through dcra; this application is being submitted for ipma and toa approval for installation of the caissons in public space, not the design. We are attaching the notarized dcra structural certification form, and the plans should be approved without a structural check, as provided in section 106. 1. 4. 1 of the dc construction codes supplement of 2008, as requested. Date: June 8, 2015 Contractor: Lds Cph Llc Permit status: Permit expired | Expiration date: June 5, 2016 | Permit id: Pa101909 | |||||
SCORE 86 Location and size of three curb cuts for capitol crossing project in squares 564, 566 and 568. Contractor: Lds Cph Llc Permit status: Revise and resubmit | Expiration date: February 26, 2016 | Permit id: 0 | |||||
SCORE 86 Small temporary support of excavation notch is public space to allow access to installing mass ave bridge caissons previous permitted in the north block, of capitol crossing Date: October 15, 2015 Contractor: Lds Cph Llc Permit status: Permit expired | Expiration date: August 31, 2016 | Permit id: Pa116911 | |||||
SCORE 86 Demolition work north air rights tunnelon walls,tunnel lights, protective dust barriers Contractor: Lds Cph Llc Permit status: Cancel/withdrawn | Expiration date: September 16, 2016 | Permit id: 0 | |||||
SCORE 86 Construction of two highway entrance exit portals, a tunnel, two bridges reconnecting f & g streets nw and a platform over i-395 Date: April 26, 2016 Contractor: Lds Cph Llc Permit status: Permit expired | Expiration date: September 29, 2016 | Permit id: Pa116283 | |||||
SCORE 86 Sheeting & shoring design for the support of excavation to construct the mass ave i-395 highway entrance portal to the highway Date: November 5, 2015 Contractor: Lds Cph Llc Permit status: Permit expired | Expiration date: November 7, 2016 | Permit id: Pa118552 | |||||
SCORE 86 Approval of capitol crossings streetscape plans to include special paving (including shared street flush cub at g st nw), tree boxes and new trees, plantings and planter boxes, fixtures (arbor, seating, trash cans) and bike racks. Contractor: Lds Cph Llc Permit status: Assigned | Expiration date: April 26, 2018 | Permit id: 0 | |||||
SCORE 86 Sheeting & shoring line along the property line in public space, east side of 3rd st nw from f st, south to 501 3rd st nw Contractor: Lds Cph Llc Permit status: Assigned | Expiration date: May 31, 2018 | Permit id: 0 | |||||
SCORE 86 Construction staging area Date: February 20, 2015 Contractor: Lds Cph Llc Permit status: Permit expired | Expiration date: August 22, 2015 | Permit id: Pa10177735 | |||||
SCORE 86 Construction staging area Contractor: Lds Cph Llc Permit status: Withdrawn | Expiration date: September 1, 2015 | Permit id: 0 | |||||
SCORE 86 Construction staging area Contractor: Lds Cph Llc Permit status: Withdrawn | Expiration date: April 11, 2016 | Permit id: 0 | |||||
SCORE 86 Construction staging area Date: February 5, 2016 Contractor: Lds Cph Llc Permit status: Permit expired | Expiration date: August 5, 2016 | Permit id: Pa10229134 | |||||
SCORE 96 Construction staging area Date: September 2, 2016 Contractor: Potomac Electric Power Company Permit status: Permit expired | Expiration date: October 14, 2016 | Permit id: Pa10334542 | |||||
SCORE 86 Construction staging area Contractor: Lds Cph Llc Permit status: Not paid | Expiration date: September 30, 2016 | Permit id: 0 | |||||
SCORE 86 Construction staging area Date: January 26, 2017 Contractor: Lds Cph Llc Permit status: Issued | Expiration date: July 30, 2017 | Permit id: Pa10334774-R1 | |||||
SCORE 89 This package entails part of the foundation work for the capitol crossing project; specifically, the construction of 118 platform/deck caissons/drilled piles and slurry wall. The design and construction of these caissons is being permitted through dcra; this application is being submitted for ipma and toa approval for installation of the caissons in public space, not the design. We are attaching the notarized dcra structural certification form, and the plans should be approved without a structural check, as provided in section 106. 1. 4. 1 of the dc construction codes supplement of 2008, as requested. Date: October 24, 2014 Contractor: Balfour Beatty Construction Dc Permit type: Excavation; caisson foundation (capitol crossing only) | Permit status: Permit expired | Expiration date: June 5, 2016 | Permit id: Pa101909 | |||||
SCORE 89 Construction of two highway entrance/exit portals, a tunnel, two bridges reconnecting f & g streets nw and a platform over i-395 Date: September 18, 2015 Contractor: Balfour Beatty Construction Dc Permit type: Mega projects; capitol crossing/i 395 tunnel, excavation; sheeting & shoring (for buildings) | Permit status: Permit expired | Expiration date: September 29, 2016 | Permit id: Pa116283 | |||||
SCORE 89 Construction of two highway entrance/exit portals, a tunnel, two bridges reconnecting f & g streets nw and a platform over i-395 Date: September 1, 2016 Contractor: Balfour Beatty Construction Dc Permit type: Mega projects; capitol crossing/i 395 tunnel, excavation; sheeting & shoring (for buildings) | Permit status: Permit expired | Expiration date: September 29, 2017 | Permit id: Pa116283-R1 | |||||
SCORE 89 Approval of capitol crossings street scape plans to include special paving (including shared street flush curb at g st nw), tree boxes and new trees, plantings and planter boxes, fixtures (arbor, seating, trash cans) and bike racks. Date: February 16, 2017 Contractor: Balfour Beatty Construction Dc Permit type: Paving; sidewalk | Permit status: Resubmitted | Expiration date: April 26, 2018 | Permit id: 0 | |||||
SCORE 64 Soe for the north block, west and north sides of the capitol crossing project along 3rd st nw to g st nw and along mass ave nw from 3rd st to the mass ave bridge over i-395 Date: July 21, 2017 Contractor: Balfour Beatty Dc Permit type: Excavation; sheeting & shoring (for buildings) | Permit status: Issued | Expiration date: November 18, 2017 | Permit id: Pa219486 | |||||
SCORE 64 A 3" diameter tree was omitted from the capitol crossing tree mitigation plan. The existing tree is currently located within a portion of sidewalk that is to be permanently removed. This tree must be removed as well. 7 28 17 - this tree will be removed with a lane closure as allowed by the approved tcp for permit 10395976, mot-004. Date: July 27, 2017 Contractor: Balfour Beatty Dc Permit type: Landscaping; tree removal | Permit status: Permit expired | Expiration date: August 26, 2017 | Permit id: Pa219710 | |||||
SCORE 89 Construction of two highway entrance exit portals, a tunnel, two bridges reconnecting f & g streets nw and a platform over i-395 Date: September 5, 2017 Contractor: Balfour Beatty Construction Dc Permit type: Mega projects; capitol crossing/i 395 tunnel, excavation; sheeting & shoring (for buildings) | Permit status: Issued | Expiration date: September 29, 2018 | Permit id: Pa116283-R2 | |||||
SCORE 74 2" diameter direct-push soil borings to be advanced for observation of soils as part of an archaeological investigation. Total of 9 borings on proposed i-395 development from e to h street and 2nd to 3rd streets nw. Borings to be advanced with a compact direct-push rig on rubber tracks. Rig will be mobilized to the site on a standard pick-up truck with a trailer. All borings advanced on grass. Estimate 1 day for completion of all borings. A dcra building permit application is being submitted for one boring on private property as part of this project. Date: May 9, 2013 Contractor: Gavin Kitchens Client: Capital Crossing Ii Llc | Permit type: Excavation; boring test pit (each addl), excavation; boring test pit (single) | Permit status: Permit expired | Expiration date: August 8, 2013 | Permit id: Pa82545 | |||||
SCORE 86 Paving; driveway(s) new- commercial Contractor: Lds Cph Llc Permit status: 10 | Expiration date: February 26, 2016 | Permit id: 0 | |||||
SCORE 89 Mega projects; capitol crossing i 395 tunnel Contractor: Balfour Beatty Construction Dc Permit status: 3 | Expiration date: September 16, 2016 | Permit id: 0 | |||||
SCORE 98 To drill and construct (15) 6 inch diameter dewatering wells to 1 feet deep via mud rotary drilling method. Each well will be equipped with a 14 inch permanent surface casing to feet deep which will be removed up completion of dewatering activities. All drill spoils and fluids will be contained and disposed of per doee regulation. Date: June 1, 2016 Contractor: George King Client: Sean Cahill Lds, Cph, Llc | Permit type: Excavation; monitoring well (each addl), excavation; monitoring well (single), mega projects; capitol crossing/i 395 tunnel | Permit status: Permit expired | Expiration date: October 6, 2016 | Permit id: Pa168513 | |||||
SCORE 96 Connect 222 massachusetts ave nw by building 31 feet of 12-way service conduit and miscellaneous equipment in sidewalk of 3rd st nw, 217 feet south of massachusetts ave nw, as indicated on attached print. Tcp site specific; ward 2; wr #3513350; cut #30126; walter altemburger 202-388-2576 waltemburger@pepco. Com (shorts aclan) Date: June 27, 2016 Contractor: Potomac Electric Power Company Permit type: Excavation; electric connection (trench) | Permit status: Permit expired | Expiration date: October 27, 2016 | Permit id: Pa179724 | |||||
SCORE 89 Paving; sidewalk(s), fixture; bench(es), fixture; bike rack(s), fixture; planter box on sidewalk (exception), fixture; street fixture or furniture (exception), fixture; trash receptacle(s) (exception), landscaping; new tree space(s), landscaping; tree planting, mega projects; capitol crossing i 395 tunnel Contractor: Balfour Beatty Construction Dc Permit status: 11 | Expiration date: April 26, 2018 | Permit id: 0 | |||||
SCORE 89 Excavation; sheeting & shoring (for buildings) Date: July 20, 2017 Contractor: Balfour Beatty Construction Dc Permit status: 9 | Expiration date: July 20, 2018 | Permit id: Pa204969 | |||||
SCORE 64 Excavation; sheeting & shoring (for buildings) Date: July 21, 2017 Contractor: Balfour Beatty Dc Permit status: 9 | Expiration date: November 18, 2017 | Permit id: Pa219486 | |||||
SCORE 64 Landscaping; tree removal Date: July 28, 2017 Contractor: Balfour Beatty Dc Permit status: 8 | Expiration date: August 26, 2017 | Permit id: Pa219710 | |||||
SCORE 89 Mega projects; capitol crossing i 395 tunnel, excavation; sheeting & shoring (for buildings) Date: September 12, 2017 Contractor: Balfour Beatty Construction Dc Permit status: 9 | Expiration date: September 29, 2018 | Permit id: Pa116283-R2 | |||||
SCORE 86 Construction staging area Contractor: Lds Cph Llc Permit status: Withdrawn | Expiration date: September 1, 2015 | Permit id: 0 | |||||
SCORE 86 Construction staging area Contractor: Lds Cph Llc Permit status: Withdrawn | Expiration date: April 11, 2016 | Permit id: 0 | |||||
SCORE 86 Construction staging area Contractor: Lds Cph Llc Permit status: Notpaid | Expiration date: September 30, 2016 | Permit id: 0 | |||||
SCORE 86 Construction staging area Date: October 4, 2017 Contractor: Lds Cph Llc Permit status: Issued | Expiration date: January 2, 2018 | Permit id: Pa10395576-R1 | |||||
SCORE 86 Demolition work north air rights tunnelon walls,tunnel lights, protective dust barriers Contractor: Lds Cph Llc Permit status: Cancel/withdrawn | Expiration date: September 16, 2016 | Permit id: 0 | |||||
SCORE 86 Approval of capitol crossings street scape plans to include special paving (including shared street flush curb at g st nw), tree boxes and new trees, plantings and planter boxes, fixtures (arbor, seating, trash cans) and bike racks. Contractor: Lds Cph Llc Permit status: Resubmitted | Expiration date: April 26, 2018 | Permit id: 0 | |||||
SCORE 86 Sheeting & shoring line along the property line in public space, east side of 3rd st nw from f st, south to 501 3rd st nw Date: July 20, 2017 Contractor: Lds Cph Llc Permit status: Issued | Expiration date: July 20, 2018 | Permit id: Pa204969 | |||||
SCORE 86 Soe for the north block, west and north sides of the capitol crossing project along 3rd st nw to g st nw and along mass ave nw from 3rd st to the mass ave bridge over i-395 Date: July 21, 2017 Contractor: Lds Cph Llc Permit status: Issued | Expiration date: November 18, 2017 | Permit id: Pa219486 | |||||
SCORE 86 A 3" diameter tree was omitted from the capitol crossing tree mitigation plan. The existing tree is currently located within a portion of sidewalk that is to be permanently removed. This tree must be removed as well. 7 28 17 - this tree will be removed with a lane closure as allowed by the approved tcp for permit 10395976, mot-004. Date: July 28, 2017 Contractor: Lds Cph Llc Permit status: Permit expired | Expiration date: August 26, 2017 | Permit id: Pa219710 | |||||
SCORE 86 Construction of two highway entrance exit portals, a tunnel, two bridges reconnecting f & g streets nw and a platform over i-395 Date: September 12, 2017 Contractor: Lds Cph Llc Permit status: Issued | Expiration date: September 29, 2018 | Permit id: Pa116283-R2 | |||||
SCORE 86 Steel plate- single location Date: April 7, 2015 Contractor: Lds Cph Llc Permit status: Permit expired | Expiration date: April 11, 2015 | Permit id: Pa10183423 | |||||
SCORE 86 Construction staging area Contractor: Lds Cph Llc Permit status: Withdrawn | Expiration date: September 1, 2015 | Permit id: 0 | |||||
SCORE 86 Construction staging area Contractor: Lds Cph Llc Permit status: Withdrawn | Expiration date: April 11, 2016 | Permit id: 0 | |||||
SCORE 86 Construction staging area Date: February 10, 2016 Contractor: Lds Cph Llc Permit status: Permit expired | Expiration date: August 16, 2016 | Permit id: Pa10177741-R2 | |||||
SCORE 96 Construction staging area Date: September 23, 2016 Contractor: Potomac Electric Power Company Permit status: Permit expired | Expiration date: November 11, 2016 | Permit id: Pa10334542-R1 | |||||
SCORE 86 Construction staging area Contractor: Lds Cph Llc Permit status: Not paid | Expiration date: September 30, 2016 | Permit id: 0 | |||||
SCORE 86 Construction staging area Date: February 6, 2017 Contractor: Lds Cph Llc Permit status: Permit expired | Expiration date: May 20, 2017 | Permit id: Pa10374668 |