Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 91 One boring shall be performed on the south side of massachusetts avenue to the east of the bridge over i-395. The boring will be performed in the sidewalk area to the east of the exit from the private business. For the boring a single truck or atv drill rig ( wide x long) will be used. The boring test hole will be 6" in diameter to a depth of approximately 1 feet below the existing ground surface. Miss utility locator to be used prior to work start in addition to a private utility locator. Each boring will be backfilled and patched in accordance with ddoe requirements. The work will take place all at one time and the sidewalk will be closed for a period of approximately 6 hours. The pedestrian traffic will be routed from the southern side of mass. Avenue to the north side of mass. Ave. The work will not impact vehicular traffic on mass ave. Total work duration one day. This construction permit requires a separate occupancy permit. The attached plans and conditions are a part of this pe Date: December 10, 2012 Contractor: Sam Connelly Client: Sean Cahill | Permit type: Excavation; boring test pit (single) | Permit status: Cancel/withdrawn | Expiration date: January 23, 2013 | |||||
SCORE 91 Excavation; boring test pit (single) Contractor: Sam Connelly Permit status: 3 | Expiration date: January 23, 2013 | Permit id: 0 | |||||
SCORE 86 One boring shall be performed on the south side of massachusetts avenue to the east of the bridge over i-395. The boring will be performed in the sidewalk area to the east of the exit from the private business. For the boring a single truck or atv drill rig ( wide x long) will be used. The boring test hole will be 6" in diameter to a depth of approximately 1 feet below the existing ground surface. Miss utility locator to be used prior to work start in addition to a private utility locator. Each boring will be backfilled and patched in accordance with ddoe requirements. The work will take place all at one time and the sidewalk will be closed for a period of approximately 6 hours. The pedestrian traffic will be routed from the southern side of mass. Avenue to the north side of mass. Ave. The work will not impact vehicular traffic on mass ave. Total work duration one day. This construction permit requires a separate occupancy permit. The attached plans and conditions are a part of this pe Contractor: Scott Rasmussen Permit status: Cancel/withdrawn | Expiration date: January 23, 2013 | Permit id: 0 | |||||
SCORE 86 One boring shall be performed on the east bound lane of massachusetts avenue to the east of the bridge over i-395. The boring will be performed in the left lane at the location shown on the diagram attached to this permit. For the boring a single truck or atv drill rig ( wide x long) will be used. The boring test hole will be 6" in diameter to a depth of approximately 1 feet below the existing ground surface. Miss utility locator to be used prior to work start in addition to a private utility locator. Each boring will be backfilled and patched in accordance with ddoe requirements. The work will take place all at one time and the work will be performed at night time between the hours of 7 pm to 5 am during which the left lane in this portion of mass ave will be closed. Traffic control will be provided in general accordance with the traffic control plan included as an attachment to this permit which was based on the ddot temporary traffic control manual. This construction permit requires Date: January 14, 2013 Contractor: Scott Rasmussen Permit status: Permit expired | Expiration date: March 23, 2013 | Permit id: Pa77686 | |||||
SCORE 91 Excavation; boring test pit (single) Contractor: Sam Connelly Permit status: 3 | Expiration date: January 23, 2013 | Permit id: 0 | |||||
SCORE 91 One boring shall be performed on the east bound lane of massachusetts avenue to the east of the bridge over i-395. The boring will be performed in the left lane at the location shown on the diagram attached to this permit. For the boring a single truck or atv drill rig ( wide x long) will be used. The boring test hole will be 6" in diameter to a depth of approximately 1 feet below the existing ground surface. Miss utility locator to be used prior to work start in addition to a private utility locator. Each boring will be backfilled and patched in accordance with ddoe requirements. The work will take place all at one time and the work will be performed at night time between the hours of 7 pm to 5 am during which the left lane in this portion of mass ave will be closed. Traffic control will be provided in general accordance with the traffic control plan included as an attachment to this permit which was based on the ddot temporary traffic control manual. This construction permit requires Date: December 11, 2012 Contractor: Sam Connelly Client: Sean Cahill | Permit type: Excavation; boring test pit (single) | Permit status: Permit expired | Expiration date: March 23, 2013 | Permit id: Pa77686 | |||||
SCORE 86 One boring shall be performed on the south side of massachusetts avenue to the east of the bridge over i-395. The boring will be performed in the sidewalk area to the east of the exit from the private business. For the boring a single truck or atv drill rig ( wide x long) will be used. The boring test hole will be 6" in diameter to a depth of approximately 1 feet below the existing ground surface. Miss utility locator to be used prior to work start in addition to a private utility locator. Each boring will be backfilled and patched in accordance with ddoe requirements. The work will take place all at one time and the sidewalk will be closed for a period of approximately 6 hours. The pedestrian traffic will be routed from the southern side of mass. Avenue to the north side of mass. Ave. The work will not impact vehicular traffic on mass ave. Total work duration one day. This construction permit requires a separate occupancy permit. The attached plans and conditions are a part of this pe Contractor: Scott Rasmussen Permit status: Cancel/withdrawn | Expiration date: January 23, 2013 | Permit id: 0 | |||||
SCORE 86 Route: ny ave to mass ave to 11th st nw Date: October 26, 2005 Contractor: Dc Gov Permit status: Permit expired | Expiration date: October 31, 2005 | Permit id: Pa15765 | |||||
SCORE 86 Date: October 26, 2005 Contractor: Dc Gov Permit status: 8 | Expiration date: October 31, 2005 | Permit id: Pa15765 |