Building Permits at Exit 11 From Interstate 395 Southbound To 3rd Street Nw Washington DC


Estimated Price

Beds

Baths

Rooms

Sq.Ft.

Built:   Lot size:   Taxed:
RENOVATION HISTORY
Based on the information received from building department, associated with Exit 11 From Interstate 395 Southbound To 3rd Street Nw Washington DC over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
SCORE
86
Two borings (b-37 and b-38) shall be performed, b-37 on the left shoulder of the ramp and b-38 will be inside the curb on the right side of the ramp; however will need to block the right shoulder for worker safety. The plan included with this permit shows the approximate locations of each proposed boring. A single truck or atv drill rig (approximately wide by long) will be used to advance an approximate 6 diameter boring (using hollow-stem augers) to a depth of 1 feet below the existing ground surface at each location. During drilling, samples will be taken for geotechnical testing and analyses. Prior to commencing drilling, miss utility will be notified to mark all existing public utilities. A private utility locator will also be used to identify any utilities not marked by miss utility. Upon completion, the borings will be backfilled and patched in general accordance with ddoe requirements. The work will be performed during normal business hours (7 am to 5 pm) and will take 1 to 1. 5
Date:  February 1, 2013
Contractor: Scott Rasmussen

Permit status: Permit expired | Expiration date: March 20, 2013 | Permit id: Pa78001
2013/02/01086Exit 11 From Interstate 395 Southbound To 3rd Street Nw Washington DcScott Rasmussen
SCORE
91
Two borings (b-37 and b-38) shall be performed, b-37 on the left shoulder of the ramp and b-38 will be inside the curb on the right side of the ramp; however will need to block the right shoulder for worker safety. The plan included with this permit shows the approximate locations of each proposed boring. A single truck or atv drill rig (approximately wide by long) will be used to advance an approximate 6 diameter boring (using hollow-stem augers) to a depth of 1 feet below the existing ground surface at each location. During drilling, samples will be taken for geotechnical testing and analyses. Prior to commencing drilling, miss utility will be notified to mark all existing public utilities. A private utility locator will also be used to identify any utilities not marked by miss utility. Upon completion, the borings will be backfilled and patched in general accordance with ddoe requirements. The work will be performed during normal business hours (7 am to 5 pm) and will take 1 to 1. 5
Date:  December 19, 2012
Contractor: Sam Connelly

Client: Sean Cahill | Permit type: Excavation; boring test pit (each addl), excavation; boring test pit (single) | Permit status: Permit expired | Expiration date: March 20, 2013 | Permit id: Pa78001
2012/12/19091Exit 11 From Interstate 395 Southbound To 3rd Street Nw Washington DcSam Connelly
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.