Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 82 Repair work is going to be done on 24" main leak in park area (6x8). Date: August 25, 2011 Contractor: Dc Water Ops Permit type: Excavation; repair water main line | Permit status: Permit expired | Expiration date: November 25, 2011 | Permit id: Pa65209 | |||||
SCORE 82 Repairs on sewer main line were done in roadway 10x8) sidewalk 10x9 Date: December 20, 2011 Contractor: Dc Water Ops Permit type: Excavation; repair sewer main line | Permit status: Denied | Expiration date: June 19, 2012 | |||||
SCORE 82 Repairs on sewer main line were done in roadway 10x8) sidewalk 10x9 Date: December 20, 2011 Contractor: Dc Water Ops Permit type: Excavation; repair sewer main line | Permit status: Denied | Expiration date: June 19, 2012 | |||||
SCORE 82 Repair work is going to be done on 24" main leak in park area (6x8). Date: August 25, 2011 Contractor: Dc Water Ops Permit type: Excavation; repair water main line | Permit status: Permit expired | Expiration date: November 25, 2011 | Permit id: Pa65209 | |||||
SCORE 89 Construction staging area Date: August 12, 2015 Contractor: J Fletcher Creamer And Son Permit status: Expired | Expiration date: October 15, 2015 | Permit id: Pa10192485-R1 | |||||
SCORE 100 Construction staging area Date: September 17, 2014 Contractor: Dcwater Permit status: Expired | Expiration date: October 18, 2014 | Permit id: Pa10157507 | |||||
SCORE 89 Construction staging area Contractor: J Fletcher Creamer And Son Permit status: Notpaid | Expiration date: April 21, 2015 | Permit id: 0 | |||||
SCORE 82 Excavation; repair sewer main line Contractor: Dc Water Ops Permit status: 2 | Expiration date: June 19, 2012 | Permit id: 0 | |||||
SCORE 82 Excavation; repair water main line Date: November 30, 2011 Contractor: Dc Water Ops Permit status: 8 | Expiration date: November 25, 2011 | Permit id: Pa65209 | |||||
SCORE 100 Construction staging area Contractor: Dcwater Permit status: Notpaid | Expiration date: May 7, 2017 | Permit id: 0 | |||||
SCORE 100 Repair water services (hydrant) in tree space 7x6 Date: April 5, 2017 Contractor: Dcwater Ops Permit status: Permit expired | Expiration date: May 18, 2017 | Permit id: Pa202665 | |||||
SCORE 100 Construction staging area Date: September 17, 2014 Contractor: Dcwater Ops Permit status: Permit expired | Expiration date: October 18, 2014 | Permit id: Pa10157507 | |||||
SCORE 89 Construction staging area Contractor: J Fletcher Creamer And Son Permit status: Not paid | Expiration date: April 21, 2015 | Permit id: 0 | |||||
SCORE 100 Construction staging area Contractor: Dcwater Ops Permit status: Not paid | Expiration date: May 7, 2017 | Permit id: 0 | |||||
SCORE 82 Excavation; repair sewer main line Contractor: Dc Water Ops Permit status: 2 | Expiration date: June 19, 2012 | Permit id: 0 | |||||
SCORE 100 Replace hydrant in sidewalk and roadway. (16x12) Date: August 27, 2014 Contractor: Dcwater Permit type: Excavation; fire hydrant(s) | Permit status: Permit expired | Expiration date: November 7, 2014 | Permit id: Pa99535 | |||||
SCORE 100 Repair water services (hydrant) in tree space 7x6 Date: April 5, 2017 Contractor: Dcwater Permit type: Excavation; repair water service lateral | Permit status: Permit expired | Expiration date: May 18, 2017 | Permit id: Pa202665 | |||||
SCORE 89 Construction staging area Contractor: J Fletcher Creamer And Son Permit status: Notpaid | Expiration date: April 21, 2015 | Permit id: 0 | |||||
SCORE 100 Construction staging area Contractor: Dcwater Permit status: Notpaid | Expiration date: May 7, 2017 | Permit id: 0 | |||||
SCORE 100 Replace hydrant in sidewalk and roadway. (16x12) Date: August 27, 2014 Contractor: Dcwater Ops Permit type: Excavation; fire hydrant(s) | Permit status: Permit expired | Expiration date: November 7, 2014 | Permit id: Pa99535 | |||||
SCORE 89 Construction staging area Contractor: J Fletcher Creamer And Son Permit status: Not paid | Expiration date: April 21, 2015 | Permit id: 0 | |||||
SCORE 89 Construction staging area Date: June 9, 2015 Contractor: J Fletcher Creamer And Son Permit status: Permit expired | Expiration date: August 14, 2015 | Permit id: Pa10192485 | |||||
SCORE 100 Construction staging area Contractor: Dcwater Ops Permit status: Not paid | Expiration date: May 7, 2017 | Permit id: 0 | |||||
SCORE 79 Vacumm excavate a total of two (2) test pits adjacent to the edge of the pavement (south of the pavement) on the eastbound side of suitland parkway. The work area will be a 1,0 ft stretch eastward from the suitland parkway se/ stanton rd se face of curb intersection and 5 feet south of the eastbound suitland pkwy face of curb. The test pits will be approximately 1. 5 ft by 1. 5 ft and will extend to the top of an underground water pipe maintained by dc water, approximately 4 ft below the surface. Probes will be placed on the water pipe for corrosivity testing. When the test is complete, the vacuum test pit will be backfilled with the excavated material and compacted in-place. The area will be restored to pre-existing conditions. We anticipate each vacuum excavated test pit will take approximately 4 hours. A vicinity map and temporary traffic control plan is attached for your reference. Date: July 21, 2014 Contractor: Tlb Associates Inc Permit type: Excavation; boring test pit (each addl), excavation; boring test pit (single) | Permit status: Revoked | Expiration date: October 2, 2014 | |||||
SCORE 79 Vacumm excavate a total of two (2) test pits adjacent to the edge of the pavement (south of the pavement) on the eastbound side of suitland parkway. The work area will be a 1,0 ft stretch eastward from the suitland parkway se stanton rd se face of curb intersection and 5 feet south of the eastbound suitland pkwy face of curb. The test pits will be approximately 1. 5 ft by 1. 5 ft and will extend to the top of an underground water pipe maintained by dc water, approximately 4 ft below the surface. Probes will be placed on the water pipe for corrosivity testing. When the test is complete, the vacuum test pit will be backfilled with the excavated material and compacted in-place. The area will be restored to pre-existing conditions. We anticipate each vacuum excavated test pit will take approximately 4 hours. A vicinity map and temporary traffic control plan is attached for your reference. Date: July 21, 2014 Contractor: Tlb Associates Inc Permit type: Excavation; boring test pit (each addl), excavation; boring test pit (single) | Permit status: Revoked | Expiration date: October 2, 2014 | |||||
SCORE 79 Excavation; boring test pit (each addl), excavation; boring test pit (single) Contractor: Tlb Associates Inc Permit status: 5 | Expiration date: October 2, 2014 | Permit id: 0 | |||||
SCORE 79 Construction staging area Contractor: Tlb Associates Inc Permit status: Withdrawn | Expiration date: August 8, 2014 | Permit id: 0 | |||||
SCORE 71 Construction staging area Contractor: Shannon Hudgins Permit status: Notpaid | Expiration date: August 6, 2014 | Permit id: 0 | |||||
SCORE 79 Vacumm excavate a total of two (2) test pits adjacent to the edge of the pavement (south of the pavement) on the eastbound side of suitland parkway. The work area will be a 1,0 ft stretch eastward from the suitland parkway se stanton rd se face of curb intersection and 5 feet south of the eastbound suitland pkwy face of curb. The test pits will be approximately 1. 5 ft by 1. 5 ft and will extend to the top of an underground water pipe maintained by dc water, approximately 4 ft below the surface. Probes will be placed on the water pipe for corrosivity testing. When the test is complete, the vacuum test pit will be backfilled with the excavated material and compacted in-place. The area will be restored to pre-existing conditions. We anticipate each vacuum excavated test pit will take approximately 4 hours. A vicinity map and temporary traffic control plan is attached for your reference. Contractor: Tlb Associates Inc Permit status: Revoked | Expiration date: October 2, 2014 | Permit id: 0 | |||||
SCORE 71 Construction staging area Contractor: Shannon Hudgins Permit status: Not paid | Expiration date: August 6, 2014 | Permit id: 0 | |||||
SCORE 79 Construction staging area Contractor: Tlb Associates Inc Permit status: Withdrawn | Expiration date: August 8, 2014 | Permit id: 0 | |||||
SCORE 79 Excavation; boring test pit (each addl), excavation; boring test pit (single) Contractor: Tlb Associates Inc Permit status: 5 | Expiration date: October 2, 2014 | Permit id: 0 | |||||
SCORE 71 Construction staging area Contractor: Shannon Hudgins Permit status: Notpaid | Expiration date: August 6, 2014 | Permit id: 0 | |||||
SCORE 79 Construction staging area Contractor: Tlb Associates Inc Permit status: Withdrawn | Expiration date: August 8, 2014 | Permit id: 0 | |||||
SCORE 79 Vacumm excavate a total of two (2) test pits adjacent to the edge of the pavement (south of the pavement) on the eastbound side of suitland parkway. The work area will be a 1,0 ft stretch eastward from the suitland parkway se stanton rd se face of curb intersection and 5 feet south of the eastbound suitland pkwy face of curb. The test pits will be approximately 1. 5 ft by 1. 5 ft and will extend to the top of an underground water pipe maintained by dc water, approximately 4 ft below the surface. Probes will be placed on the water pipe for corrosivity testing. When the test is complete, the vacuum test pit will be backfilled with the excavated material and compacted in-place. The area will be restored to pre-existing conditions. We anticipate each vacuum excavated test pit will take approximately 4 hours. A vicinity map and temporary traffic control plan is attached for your reference. Contractor: Tlb Associates Inc Permit status: Revoked | Expiration date: October 2, 2014 | Permit id: 0 | |||||
SCORE 71 Vacumm excavate a total of two (2) test pits adjacent to the edge of the pavement (south of the pavement) on the eastbound side of suitland parkway. The work area will be a 1,0 ft stretch eastward from the suitland parkway se/ stanton rd se face of curb intersection and 5 feet south of the eastbound suitland pkwy face of curb. The test pits will be approximately 1. 5 ft by 1. 5 ft and will extend to the top of an underground water pipe maintained by dc water, approximately 4 ft below the surface. Probes will be placed on the water pipe for corrosivity testing. When the test is complete, the vacuum test pit will be backfilled with the excavated material and compacted inplace. The area will be restored to preexisting conditions. We anticipate each vacuum excavated test pit will take approximately 4 hours. A vicinity map and temporary traffic control plan is attached for your reference. Date: June 23, 2014 Contractor: Shannon Hudgins Client: Dc Water | Permit type: Excavation; boring test pit (each addl), excavation; boring test pit (single) | Permit status: Permit expired | Expiration date: August 6, 2014 | Permit id: Pa97042 | |||||
SCORE 71 Construction staging area Contractor: Shannon Hudgins Permit status: Not paid | Expiration date: August 6, 2014 | Permit id: 0 | |||||
SCORE 79 Construction staging area Contractor: Tlb Associates Inc Permit status: Withdrawn | Expiration date: August 8, 2014 | Permit id: 0 | |||||
SCORE 89 Construction staging area Date: October 15, 2015 Contractor: J Fletcher Creamer And Son Permit status: Permit expired | Expiration date: December 16, 2015 | Permit id: Pa10214016 |