Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 79 ![]() Permit status: 5 | Expiration date: October 9, 2014 | Permit id: 0 | |||||
SCORE 79 Suitland Parkway Se And Stanton Road Se Washington Dc Excavation; boring test pit (each addl), excavation; boring test pit (single) ![]() Permit status: 5 | Expiration date: October 2, 2014 | Permit id: 0 | |||||
SCORE 79 ![]() Permit status: Withdrawn | Expiration date: August 8, 2014 | Permit id: 0 | |||||
SCORE 79 ![]() Permit status: Notpaid | Expiration date: August 8, 2014 | Permit id: 0 | |||||
SCORE 79 24 2499 Block Of 18th Street Se Washington Dc Vacumm excavate a test pit in the norththbound lane of 18th street se. The work area will be 75 ft north of the 18th street se frankford street se face of curb intersection and 7 feet from the east side of 18th st face of curb. The test pit will be approximately 1. 5 ft by 1. 5 ft and will extend to the top of an underground water pipe maintained by dc water, approximately 4 ft below the surface. Probes will be placed on the water pipe for corrosivity testing. When the test is complete, the vacuum test pit will be backfilled with the excavated material and compacted in-place. An asphalt patch will be placed in the top foot of the backfilled area. We anticipate the vacuum excavated test pit will take approximately 4 hours. A vicinity map and temporary traffic control plan is attached for your reference. ![]() Permit status: Revoked | Expiration date: October 9, 2014 | Permit id: 0 | |||||
SCORE 79 Suitland Parkway Se And Stanton Road Se Washington Dc Vacumm excavate a total of two (2) test pits adjacent to the edge of the pavement (south of the pavement) on the eastbound side of suitland parkway. The work area will be a 1,0 ft stretch eastward from the suitland parkway se stanton rd se face of curb intersection and 5 feet south of the eastbound suitland pkwy face of curb. The test pits will be approximately 1. 5 ft by 1. 5 ft and will extend to the top of an underground water pipe maintained by dc water, approximately 4 ft below the surface. Probes will be placed on the water pipe for corrosivity testing. When the test is complete, the vacuum test pit will be backfilled with the excavated material and compacted in-place. The area will be restored to pre-existing conditions. We anticipate each vacuum excavated test pit will take approximately 4 hours. A vicinity map and temporary traffic control plan is attached for your reference. ![]() Permit status: Revoked | Expiration date: October 2, 2014 | Permit id: 0 | |||||
SCORE 79 ![]() Permit status: Withdrawn | Expiration date: August 8, 2014 | Permit id: 0 | |||||
SCORE 79 ![]() Permit status: Not paid | Expiration date: August 8, 2014 | Permit id: 0 | |||||
SCORE 79 Suitland Parkway Se And Stanton Road Se Washington Dc Excavation; boring test pit (each addl), excavation; boring test pit (single) ![]() Permit status: 5 | Expiration date: October 2, 2014 | Permit id: 0 | |||||
SCORE 79 ![]() Permit status: 5 | Expiration date: October 9, 2014 | Permit id: 0 | |||||
SCORE 79 ![]() Permit status: Notpaid | Expiration date: August 8, 2014 | Permit id: 0 | |||||
SCORE 79 ![]() Permit status: Withdrawn | Expiration date: August 8, 2014 | Permit id: 0 | |||||
SCORE 79 Suitland Parkway Se And Stanton Road Se Washington Dc Vacumm excavate a total of two (2) test pits adjacent to the edge of the pavement (south of the pavement) on the eastbound side of suitland parkway. The work area will be a 1,0 ft stretch eastward from the suitland parkway se stanton rd se face of curb intersection and 5 feet south of the eastbound suitland pkwy face of curb. The test pits will be approximately 1. 5 ft by 1. 5 ft and will extend to the top of an underground water pipe maintained by dc water, approximately 4 ft below the surface. Probes will be placed on the water pipe for corrosivity testing. When the test is complete, the vacuum test pit will be backfilled with the excavated material and compacted in-place. The area will be restored to pre-existing conditions. We anticipate each vacuum excavated test pit will take approximately 4 hours. A vicinity map and temporary traffic control plan is attached for your reference. ![]() Permit status: Revoked | Expiration date: October 2, 2014 | Permit id: 0 | |||||
SCORE 79 24 2499 Block Of 18th Street Se Washington Dc Vacumm excavate a test pit in the norththbound lane of 18th street se. The work area will be 75 ft north of the 18th street se frankford street se face of curb intersection and 7 feet from the east side of 18th st face of curb. The test pit will be approximately 1. 5 ft by 1. 5 ft and will extend to the top of an underground water pipe maintained by dc water, approximately 4 ft below the surface. Probes will be placed on the water pipe for corrosivity testing. When the test is complete, the vacuum test pit will be backfilled with the excavated material and compacted in-place. An asphalt patch will be placed in the top foot of the backfilled area. We anticipate the vacuum excavated test pit will take approximately 4 hours. A vicinity map and temporary traffic control plan is attached for your reference. ![]() Permit status: Revoked | Expiration date: October 9, 2014 | Permit id: 0 | |||||
SCORE 79 ![]() Permit status: Withdrawn | Expiration date: August 8, 2014 | Permit id: 0 | |||||
SCORE 79 ![]() Permit status: Not paid | Expiration date: August 8, 2014 | Permit id: 0 | |||||
SCORE 79 Suitland Parkway Se And Stanton Road Se Washington Dc Vacumm excavate a total of two (2) test pits adjacent to the edge of the pavement (south of the pavement) on the eastbound side of suitland parkway. The work area will be a 1,0 ft stretch eastward from the suitland parkway se/ stanton rd se face of curb intersection and 5 feet south of the eastbound suitland pkwy face of curb. The test pits will be approximately 1. 5 ft by 1. 5 ft and will extend to the top of an underground water pipe maintained by dc water, approximately 4 ft below the surface. Probes will be placed on the water pipe for corrosivity testing. When the test is complete, the vacuum test pit will be backfilled with the excavated material and compacted in-place. The area will be restored to pre-existing conditions. We anticipate each vacuum excavated test pit will take approximately 4 hours. A vicinity map and temporary traffic control plan is attached for your reference. ![]() ![]() Permit type: Excavation; boring test pit (each addl), excavation; boring test pit (single) | Permit status: Revoked | Expiration date: October 2, 2014 | |||||
SCORE 79 24 2499 Block Of 18th Street Se Washington Dc Vacumm excavate a test pit in the norththbound lane of 18th street se. The work area will be 75 ft north of the 18th street se/ frankford street se face of curb intersection and 7 feet from the east side of 18th st face of curb. The test pit will be approximately 1. 5 ft by 1. 5 ft and will extend to the top of an underground water pipe maintained by dc water, approximately 4 ft below the surface. Probes will be placed on the water pipe for corrosivity testing. When the test is complete, the vacuum test pit will be backfilled with the excavated material and compacted in-place. An asphalt patch will be placed in the top foot of the backfilled area. We anticipate the vacuum excavated test pit will take approximately 4 hours. A vicinity map and temporary traffic control plan is attached for your reference. ![]() ![]() Permit type: Excavation; boring test pit (single) | Permit status: Revoked | Expiration date: October 9, 2014 | |||||
SCORE 79 24 2499 Block Of 18th Street Se Washington Dc Vacumm excavate a test pit in the norththbound lane of 18th street se. The work area will be 75 ft north of the 18th street se/ frankford street se face of curb intersection and 7 feet from the east side of 18th st face of curb. The test pit will be approximately 1. 5 ft by 1. 5 ft and will extend to the top of an underground water pipe maintained by dc water, approximately 4 ft below the surface. Probes will be placed on the water pipe for corrosivity testing. When the test is complete, the vacuum test pit will be backfilled with the excavated material and compacted in-place. An asphalt patch will be placed in the top foot of the backfilled area. We anticipate the vacuum excavated test pit will take approximately 4 hours. A vicinity map and temporary traffic control plan is attached for your reference. ![]() ![]() Permit type: Excavation; boring test pit (single) | Permit status: Revoked | Expiration date: October 9, 2014 | |||||
SCORE 79 Suitland Parkway Se And Stanton Road Se Washington Dc Vacumm excavate a total of two (2) test pits adjacent to the edge of the pavement (south of the pavement) on the eastbound side of suitland parkway. The work area will be a 1,0 ft stretch eastward from the suitland parkway se stanton rd se face of curb intersection and 5 feet south of the eastbound suitland pkwy face of curb. The test pits will be approximately 1. 5 ft by 1. 5 ft and will extend to the top of an underground water pipe maintained by dc water, approximately 4 ft below the surface. Probes will be placed on the water pipe for corrosivity testing. When the test is complete, the vacuum test pit will be backfilled with the excavated material and compacted in-place. The area will be restored to pre-existing conditions. We anticipate each vacuum excavated test pit will take approximately 4 hours. A vicinity map and temporary traffic control plan is attached for your reference. ![]() ![]() Permit type: Excavation; boring test pit (each addl), excavation; boring test pit (single) | Permit status: Revoked | Expiration date: October 2, 2014 | |||||
SCORE 79 24 2499 Block Of 18th Street Se Washington Dc Vacumm excavate a test pit in the norththbound lane of 18th street se. The work area will be 75 ft north of the 18th street se frankford street se face of curb intersection and 7 feet from the east side of 18th st face of curb. The test pit will be approximately 1. 5 ft by 1. 5 ft and will extend to the top of an underground water pipe maintained by dc water, approximately 4 ft below the surface. Probes will be placed on the water pipe for corrosivity testing. When the test is complete, the vacuum test pit will be backfilled with the excavated material and compacted in-place. An asphalt patch will be placed in the top foot of the backfilled area. We anticipate the vacuum excavated test pit will take approximately 4 hours. A vicinity map and temporary traffic control plan is attached for your reference. ![]() ![]() Permit type: Excavation; boring test pit (single) | Permit status: Revoked | Expiration date: October 9, 2014 |