Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Remove an existing pole and install a new pole west wo#06528951 Date: October 16, 2008 Contractor: Commonwealth Edison Permit id: Row20081010 | |||||
SCORE 100 Remove an existing pole and install a new pole west wo#06528951 Date: October 16, 2008 Contractor: Commonwealth Edison Permit id: Row20081010 | |||||
SCORE 100 Installing a new pole on the south side of sandy hollow rd in row Date: October 22, 2008 Contractor: Commonwealth Edison Permit id: Row20081017 | |||||
SCORE 100 Installing a new pole on the south side of sandy hollow rd in row Date: October 22, 2008 Contractor: Commonwealth Edison Permit id: Row20081017 | |||||
SCORE 99 Bore across kishwaukee just south of beltline rd Date: January 6, 2009 Contractor: At And T Permit id: Row20091008 | |||||
SCORE 99 Bore across kishwaukee just south of beltline rd Date: January 6, 2009 Contractor: At And T Permit id: Row20091008 | |||||
SCORE 60 Lowering watermain that is laying on sewer line working with rrwrd hope to start 1/12/09 Date: January 8, 2009 Contractor: Go Excavating Permit id: Row20091019 | |||||
SCORE 96 Install 2" pe Date: February 17, 2009 Contractor: Nicor Gas Permit id: Row20091125 | |||||
Complete tear off and re-roof Date: April 13, 2009 Value: $3,500 Client: Parks, Glen | Permit id: Sfd20091261 | |||||
SCORE 82 Complete tear off and re-roof Client: Parks, Glen | Permit id: Sfd20091261 | |||||
SCORE 82 Complete tear off and re-roof Client: Parks, Glen | Permit id: Sfd20091261 | |||||
SCORE 96 Sewer repair Date: April 27, 2009 Contractor: Rock River Water Reclamation District Permit id: Row20091423 | |||||
SCORE 96 Point repairs to sewer line - pavement cut necessary Date: September 20, 2010 Contractor: Rock River Water Reclamation District Permit id: Row20102406 | |||||
SCORE 89 Replacing hydrant Date: April 3, 2012 Contractor: Rockford Water Department Permit id: Row20121261 | |||||
Complete tear off and re-roof Date: May 11, 2009 Value: $5,800 Client: Larson, Thad | Permit id: Sfd20091491 | |||||
SCORE 82 Complete tear off and re-roof Client: Larson, Thad | Permit id: Sfd20091491 | |||||
SCORE 82 Complete tear off and re-roof Client: Larson, Thad | Permit id: Sfd20091491 | |||||
Complete tear off and re-roof Date: May 18, 2009 Value: $6,135 Client: Ryan, Walter | Permit id: Sfd20091543 | |||||
Siding house only. Date: May 21, 2009 Value: $4,600 Client: Ryan, Walter | Permit id: Misc20091110 | |||||
SCORE 65 Siding house only. Client: Ryan, Walter | Permit id: Misc20091110 | |||||
SCORE 82 Complete tear off and re-roof Client: Ryan, Walter | Permit id: Sfd20091543 | |||||
SCORE 65 Siding house only. Client: Ryan, Walter | Permit id: Misc20091110 | |||||
SCORE 82 Complete tear off and re-roof Client: Ryan, Walter | Permit id: Sfd20091543 | |||||
SCORE 62 12 x 14 attached deck on rear of home Client: Three Hammer Construction, Glenn Hammack | Permit id: Sfd20091763 | |||||
12 x 14 attached deck on rear of home Date: June 25, 2009 Value: $1,000 Client: Three Hammer Construction, Glenn Hammack | Permit id: Sfd20091763 | |||||
SCORE 62 12 x 14 attached deck on rear of home Client: Three Hammer Construction, Glenn Hammack | Permit id: Sfd20091763 | |||||
12 x 12 attached deck on rear of home Date: June 25, 2009 Value: $860 Client: Three Hammer Construction, Glenn Hammack | Permit id: Sfd20091768 | |||||
SCORE 62 12 x 12 attached deck on rear of home Client: Three Hammer Construction, Glenn Hammack | Permit id: Sfd20091768 | |||||
SCORE 62 12 x 12 attached deck on rear of home Client: Three Hammer Construction, Glenn Hammack | Permit id: Sfd20091768 | |||||
SCORE 100 Moving pole for road improvements Date: June 29, 2009 Contractor: Commonwealth Edison Permit id: Row20091729 | |||||
SCORE 100 Moving pole for road improvements Date: June 29, 2009 Contractor: Commonwealth Edison Permit id: Row20091729 | |||||
Tree trimming along row Date: July 16, 2009 Permit id: Row20091789 | |||||
SCORE 86 Tree trimming along row Date: July 16, 2009 Contractor: Street Division Mark Stockman Permit id: Row20091789 | |||||
SCORE 86 Tree trimming along row Date: July 16, 2009 Contractor: Street Division, Mark Stockman Permit id: Row20091789 | |||||
SCORE 96 Install 20 of 2" pe 6 of 4" pe Date: August 3, 2009 Contractor: Nicor Gas Permit id: Row20091884 | |||||
SCORE 87 Storm sewer installation Date: August 19, 2009 Contractor: Colin Simpson Permit id: Row20091992 | |||||
SCORE 100 Remove and replace poles in the area of sewell and wills Date: September 16, 2009 Contractor: Commonwealth Edison Permit id: Row20092134 | |||||
SCORE 100 Remove and replace poles in the area of sewell and wills Date: September 16, 2009 Contractor: Commonwealth Edison Permit id: Row20092134 | |||||
Placing 24 fiber cable with some boring under driveways and street : see drawings Date: August 12, 2009 Permit id: Row20091955 | |||||
SCORE 56 Placing 24 fiber cable with some boring under driveways and street : see drawings Date: August 12, 2009 Contractor: Verizon Communications Garrett Burt Permit id: Row20091955 | |||||
SCORE 56 Placing 24 fiber cable with some boring under driveways and street : see drawings Date: August 12, 2009 Contractor: Verizon Communications, Garrett Burt Permit id: Row20091955 | |||||
SCORE 86 Express review # 09-0508. New factory building with office and storage uses. Client: Wanxiang America Corporation | Permit id: Mulcom20091299 | |||||
"foundation" only! Wanxiang foundation permit. - express review # 09-0508. New factory building with office and storage uses. Date: August 14, 2009 Client: Wanxiang America Corporation | Permit id: Mulcom20091567 | |||||
(electrical) "wanxiang america" - (1) 20 amp service 3phase - a. S. C. C. Form required to be sumbitted prior to inspection. Back-up generator. (3) 1 amp feeders, (4) 225 amp feeders, (1) 6 amp feeder. New 40,5 sq ft factory & warehouse. Express review # 09-0508. New factory building with office and storage uses. Date: August 20, 2009 Client: Wanxiang America Corporation | Permit id: Elect20091335 | |||||
Express review # 09-0508. New factory building with office and storage uses. Date: September 18, 2009 Value: $2,100,000 Client: Wanxiang America Corporation | Permit id: Mulcom20091299 | |||||
Express review # 09-0508. New factory building with office and storage uses. Plumbing permit. Plan review fee paid on 5/12/09 inv 82704, chk 2995. 405. 20. 25 tech. 4 lavs, 2 urinals, 8 wc, 5 fd, 1 ks, mop basin, trench drain Date: September 18, 2009 Client: Wanxiang America Corporation | Permit id: Plum20091335 | |||||
Express review # 09-0508. New factory building with office and storage uses. Sewer and water only Date: October 13, 2009 Client: Wanxiang America Corporation | Permit id: Plum20091336 | |||||
SCORE 95 Express review # 09-0508. New factory building with office and storage uses. Fire suppression 40,0 sf, 243 heads, 38,6 value Date: November 16, 2009 Contractor: Absolute Fire Protection Client: Wanxiang America Corporation | Permit id: Plum20091836 | |||||
SCORE 96 New service Date: November 17, 2009 Contractor: Nicor Gas Company Permit id: Row20092541 | |||||
Rtus - (2) 9 ton, 1 btu; (1) 3 ton, 72 btu; (1) 2 ton, btu; (2) ton, 525 btu; (2) ton(1) heated mu - 22 cfm, 5 btu(1) liebert, 1. 5 ton, 18 btu(1) 2 ton split acexhaust fans - (1) 47 cfm, (1) 4 cfm, (1) 8 cfm, (4) 2 cfm(3) unit heaters, 1 btu each1 kw electric heater Date: December 22, 2009 Client: Wanxiang America Corporation | Permit id: Mech20091545 | |||||
SCORE 93 Install new water service Date: January 6, 2010 Contractor: Rockford Water Division Permit id: Row20101013 | |||||
6 rtu gas piping only 3 unit heaters 2,119,0 total btugas piping only for 9 units totalling 2,119,000btunf - welded gas pipe 2lb pressure Date: January 19, 2010 Client: Wanxiang America Corporation | Permit id: Mech20091546 | |||||
Install (1) set of channel backlit letters, led lighting, business identification sign. Electrical cost is 400. (see log notes) Date: February 12, 2010 Value: $5,000 Permit id: Mulcom20101041 | |||||
Install (1) set of channel backlit letters, led lighting, business identification sign. Electrical cost is 400. (see log notes), metallic conduit, low voltage wiring, power source, box 1 volt amp circuit inside wall Date: February 12, 2010 Value: $400 Permit id: Elect20101069 | |||||
Fabricate & install one 3"by4"non illuminateddouble faced directional "shipping & "receiving"sign Date: September 29, 2010 Value: $997 Client: Wanxiang New Energy | Permit id: Mulcom20101655 | |||||
SCORE 96 2012-2013 point repairs contract 2. Repair 16 of sewer pipeitem 23restoration includes mill and resurface apron Date: April 17, 2012 Contractor: Rock River Water Reclamation District Permit id: Row20121339 | |||||
SCORE 81 (electrical) "wanxiang america" - (1) 20 amp service 3phase - a. S. C. C. Form required to be sumbitted prior to inspection. Back-up generator. (3) 1 amp feeders, (4) 225 amp feeders, (1) 6 amp feeder. New 40,5 sq ft factory & warehouse. Express review # 09-0508. New factory building with office and storage uses. Date: August 20, 2009 Contractor: Green Jon Client: Wanxiang America Corporation | Permit id: Elect20091335 | |||||
SCORE 56 Install (1) set of channel backlit letters, led lighting, business identification sign. Electrical cost is 400. (see log notes), metallic conduit, low voltage wiring, power source, box 1 volt amp circuit inside wall Permit id: Elect20101069 | |||||
SCORE 56 Install (1) set of channel backlit letters, led lighting, business identification sign. Electrical cost is 400. (see log notes) Permit id: Mulcom20101041 | |||||
SCORE 96 Express review # 09-0508. New factory building with office and storage uses. Sewer and water only Date: October 13, 2009 Contractor: Corn Robert Client: Wanxiang America Corporation | Permit id: Plum20091336 | |||||
SCORE 62 Express review # 09-0508. New factory building with office and storage uses. Plumbing permit. Plan review fee paid on 5/12/09 inv 82704, chk 2995. 405. + 20. 25 tech. 4 lavs, 2 urinals, 8 wc, 5 fd, 1 ks, mop basin, trench drain Date: September 18, 2009 Contractor: Pellegrini Dan Client: Wanxiang America Corporation | Permit id: Plum20091335 | |||||
SCORE 79 Fabricate & install one 3"by4"non illuminateddouble faced directional "shipping & "receiving"sign Client: Wanxiang New Energy | Permit id: Mulcom20101655 | |||||
SCORE 93 6 rtu gas piping only 3 unit heaters 2,119,0 total btugas piping only for 9 units totalling 2,119,000btunf - welded gas pipe 2lb pressure Date: January 19, 2010 Contractor: Rieff Dick Client: Wanxiang America Corporation | Permit id: Mech20091546 | |||||
SCORE 86 Express review # 09-0508. New factory building with office and storage uses. Client: Wanxiang America Corporation | Permit id: Mulcom20091299 | |||||
SCORE 93 Rtus - (2) 9 ton, 1 btu; (1) 3 ton, 72 btu; (1) 2 ton, btu; (2) ton, 525 btu; (2) ton(1) heated mu - 22 cfm, 5 btu(1) liebert, 1. 5 ton, 18 btu(1) 2 ton split acexhaust fans - (1) 47 cfm, (1) 4 cfm, (1) 8 cfm, (4) 2 cfm(3) unit heaters, 1 btu each1 kw electric heater Date: December 22, 2009 Contractor: Kisting David Client: Wanxiang America Corporation | Permit id: Mech20091545 | |||||
SCORE 56 Install (1) set of channel backlit letters, led lighting, business identification sign. Electrical cost is 400. (see log notes) Permit id: Mulcom20101041 | |||||
SCORE 93 Rtus - (2) 9 ton, 1 btu; (1) 3 ton, 72 btu; (1) 2 ton, btu; (2) ton, 525 btu; (2) ton(1) heated mu - 22 cfm, 5 btu(1) liebert, 1. 5 ton, 18 btu(1) 2 ton split acexhaust fans - (1) 47 cfm, (1) 4 cfm, (1) 8 cfm, (4) 2 cfm(3) unit heaters, 1 btu each1 kw electric heater Date: December 22, 2009 Contractor: Kisting, David Client: Wanxiang America Corporation | Permit id: Mech20091545 | |||||
SCORE 79 Fabricate & install one 3"by4"non illuminateddouble faced directional "shipping & "receiving"sign Client: Wanxiang New Energy | Permit id: Mulcom20101655 | |||||
SCORE 56 Install (1) set of channel backlit letters, led lighting, business identification sign. Electrical cost is 400. (see log notes), metallic conduit, low voltage wiring, power source, box 1 volt amp circuit inside wall Permit id: Elect20101069 | |||||
SCORE 81 (electrical) "wanxiang america" - (1) 20 amp service 3phase - a. S. C. C. Form required to be sumbitted prior to inspection. Back-up generator. (3) 1 amp feeders, (4) 225 amp feeders, (1) 6 amp feeder. New 40,5 sq ft factory & warehouse. Express review # 09-0508. New factory building with office and storage uses. Date: August 20, 2009 Contractor: Green, Jon Client: Wanxiang America Corporation | Permit id: Elect20091335 | |||||
SCORE 62 Express review # 09-0508. New factory building with office and storage uses. Plumbing permit. Plan review fee paid on 5 12 09 inv 82704, chk 2995. 405. + 20. 25 tech. 4 lavs, 2 urinals, 8 wc, 5 fd, 1 ks, mop basin, trench drain Date: September 18, 2009 Contractor: Pellegrini, Dan Client: Wanxiang America Corporation | Permit id: Plum20091335 | |||||
SCORE 96 Express review # 09-0508. New factory building with office and storage uses. Sewer and water only Date: October 13, 2009 Contractor: Corn, Robert Client: Wanxiang America Corporation | Permit id: Plum20091336 | |||||
SCORE 93 6 rtu gas piping only 3 unit heaters 2,119,0 total btugas piping only for 9 units totalling 2,119,000btunf - welded gas pipe 2lb pressure Date: January 19, 2010 Contractor: Rieff, Dick Client: Wanxiang America Corporation | Permit id: Mech20091546 | |||||
SCORE 95 Express review # 09-0508. New factory building with office and storage uses. Fire suppression 40,0 sf, 243 heads, 38,6 value Date: November 16, 2009 Contractor: Absolute Fire Protection Client: Wanxiang America Corporation | Permit id: Plum20091836 | |||||
SCORE 56 (electrical) wanxiang-america - wiring for solar panels and trackers. Pricing revised per fax of 8/4/10. Client: Wanxiang America Corporation | Permit id: Elect20101474 | |||||
SCORE 95 Express review # 09-0508. New factory building with office and storage uses. Fire suppression 40,0 sf, 243 heads, 38,6 value Date: November 16, 2009 Contractor: Absolute Fire Protection Client: Wanxiang America Corporation | Permit id: Plum20091836 | |||||
SCORE 100 Replace arms, replace poles, replace more arms Date: August 20, 2009 Contractor: Commonwealth Edison Permit id: Row20091993 | |||||
SCORE 100 Replace arms, replace poles, replace more arms Date: August 20, 2009 Contractor: Commonwealth Edison Permit id: Row20091993 | |||||
SCORE 87 Cip reconstruction - colin simpson Date: August 25, 2009 Contractor: Colin Simpson Permit id: Row20092012 | |||||
SCORE 89 Emergency main break Date: December 3, 2012 Contractor: Rockford Water Department Permit id: Row20122427 | |||||
SCORE 96 Install 33 of 2" stl Date: August 2, 2010 Contractor: Nicor Gas Company Permit id: Row20102119 | |||||
City wide repair - pm, s. Sumner Date: September 6, 2012 Permit id: Row20122049 | |||||
SCORE 86 City wide repair - pm, s. Sumner Date: September 6, 2012 Contractor: City Of Rockford Public Works Permit id: Row20122049 | |||||
SCORE 86 City wide repair - pm, s. Sumner Date: September 6, 2012 Contractor: City Of Rockford, Public Works Permit id: Row20122049 | |||||
SCORE 96 Repair / replace sanitary sewerwork to be done jan 25-26 2010 Date: October 21, 2009 Contractor: Rock River Water Reclamation District Permit id: Row20092391 | |||||
SCORE 96 Installation of 16" flanged spool per drawing - all work to be on east side of kishwaukee. Steve rivard - 815 509 0644 Date: September 28, 2011 Contractor: Nicor Gas Permit id: Row20112196 | |||||
SCORE 96 Repair / replace sanitary sewerwork to be done jan 18 & 19th 2010 Date: October 21, 2009 Contractor: Rock River Water Reclamation District Permit id: Row20092389 | |||||
SCORE 96 Sanitary sewer mainline repair Date: November 6, 2009 Contractor: Rock River Water Reclamation District Permit id: Row20092480 | |||||
SCORE 96 Drill 1. 5" diameter holes every on road to assess natural gas transmission pipelines - 1 and holes Date: November 17, 2009 Contractor: Nicor Gas Client: Nicor Gas | Permit id: Row20092520 | |||||
SCORE 100 Remove 1 switch, install 1 switch Date: March 26, 2010 Contractor: Commonwealth Edison Permit id: Row20101367 | |||||
Regional tree trimming near powerlines. Alpine to s mulford eb, linden to charles to the n, linden to the south at harrison and alpine Date: January 30, 2012 Permit id: Row20121076 | |||||
SCORE 79 Horizontal directional drill for installation of fiber optic innerduct Date: May 16, 2012 Contractor: Baxter And Woodman Permit id: Row20121516 | |||||
SCORE 80 Regional tree trimming near powerlines. Alpine to s mulford eb, linden to charles to the n, linden to the south at harrison and alpine Date: January 30, 2012 Contractor: Comed Katie Runyan Permit id: Row20121076 | |||||
SCORE 80 Regional tree trimming near powerlines. Alpine to s mulford eb, linden to charles to the n, linden to the south at harrison and alpine Date: January 30, 2012 Contractor: Comed, Katie Runyan Permit id: Row20121076 | |||||
SCORE 100 Remove 1 switch, install 1 switch Date: March 26, 2010 Contractor: Commonwealth Edison Permit id: Row20101367 | |||||
SCORE 82 Directional bore 2 ducts for fiber for school district - approx 350 Date: December 28, 2009 Contractor: Kentucky Data Link Permit id: Row20092626 | |||||
Replacing a fuse with a tripsaver on existing pole Date: February 2, 2012 Permit id: Row20121088 | |||||
SCORE 59 Replacing a fuse with a tripsaver on existing pole Date: February 2, 2012 Contractor: Comed Nora Permit id: Row20121088 | |||||
SCORE 59 Replacing a fuse with a tripsaver on existing pole Date: February 2, 2012 Contractor: Comed, Nora Permit id: Row20121088 | |||||
SCORE 82 Replace 23,1 feet of cable, dir bore method Date: January 22, 2010 Contractor: Intren Inc Permit id: Row20101068 | |||||
SCORE 82 Intren to replace buried cable Date: August 30, 2012 Contractor: Intren Inc Permit id: Row20122014 | |||||
SCORE 93 Main break Date: February 16, 2010 Contractor: Rockford Water Division Permit id: Row20101172 | |||||
SCORE 96 Expose main to examine condition of pipe Date: February 25, 2010 Contractor: Nicor Gas Client: Nicor Gas | Permit id: Row20101222 | |||||
SCORE 93 Dig up hydrant Date: March 15, 2010 Contractor: Rockford Water Division Permit id: Row20101283 | |||||
Lot: #295. Subd: linden pte. 1-family: 4 bdrms, 2 full baths, 1 partial, 3-car attached garage (610), attached deck (120), finished basement (580), unfinished basement (451). Zoning clearance: #10-0686. Setbacks: n 31, e 46, s 9, w 30. Per b. A. 6/2/10. Date: June 11, 2010 Value: $105,705 Permit id: Sfd20101760 | |||||
SCORE 65 New 1-family residence: lot 295 linden pointe. 4 bedrooms, 2 full baths, 484 sf attached garage, unfinished basement, 12 x 12 deck. 1st floor 506 sf, 2nd floor 952 sf. Setbacks: n 30, s 117" w e 56 Client: Three Hammer Const Inc. | Permit id: Sfd20103387 | |||||
(2) t/sh, (2) wc, (2) lav, (1) ks, (1) dw, (1) wb, (1) gal wtrhtr, (1) fd, basement rough, swrwtr Date: January 27, 2011 Value: $6,500 Client: Three Hammer Const Inc. | Permit id: Plum20102209 | |||||
New 1-family residence: lot 295 linden pointe. 4 bedrooms, 2 full baths, 484 sf attached garage, unfinished basement, 12 x 12 deck. 1st floor 506 sf, 2nd floor 952 sf. Setbacks: n 30, s 194", w 374", e 30. Date: January 28, 2011 Client: Three Hammer Const Inc. | Permit id: Elect20101914 | |||||
Btu, 80%2 ton, seerductwork Date: February 25, 2011 Value: $4,500 Client: Three Hammer Const Inc. | Permit id: Mech20102708 | |||||
New 1-family residence: gas piping Date: July 20, 2011 Client: Three Hammer Const Inc. | Permit id: Mech20102709 | |||||
SCORE 93 (2) t/sh, (2) wc, (2) lav, (1) ks, (1) dw, (1) wb, (1) gal wtrhtr, (1) fd, basement rough, swrwtr Client: Three Hammer Const Inc. | Permit id: Plum20102209 | |||||
SCORE 93 New 1-family residence: gas piping Date: July 20, 2011 Contractor: Martinovich Shaun Client: Three Hammer Const Inc. | Permit id: Mech20102709 | |||||
SCORE 89 New 1-family residence: lot 295 linden pointe. 4 bedrooms, 2 full baths, 484 sf attached garage, unfinished basement, 12 x 12 deck. 1st floor 506 sf, 2nd floor 952 sf. Setbacks: n 30, s 194", w 374", e 30. Date: January 28, 2011 Contractor: Finn Jeff Client: Three Hammer Const Inc. | Permit id: Elect20101914 | |||||
SCORE 89 Btu, 80%2 ton, seerductwork Client: Three Hammer Const Inc. | Permit id: Mech20102708 | |||||
SCORE 93 (2) t sh, (2) wc, (2) lav, (1) ks, (1) dw, (1) wb, (1) gal wtrhtr, (1) fd, basement rough, swrwtr Client: Three Hammer Const Inc. | Permit id: Plum20102209 | |||||
Lot: #295. Subd: linden pte. 1-family: 4 bdrms, 2 full baths, 1 partial, 3-car attached garage (610), attached deck (120), finished basement (580), unfinished basement (451). Zoning clearance: #10-0686. Setbacks: n 31, e 46, s 9, w 30. Per b. A. 6 2 10. Date: June 11, 2010 Value: $105,705 Permit id: Sfd20101760 | |||||
SCORE 89 New 1-family residence: lot 295 linden pointe. 4 bedrooms, 2 full baths, 484 sf attached garage, unfinished basement, 12 x 12 deck. 1st floor 506 sf, 2nd floor 952 sf. Setbacks: n 30, s 194", w 374", e 30. Date: January 28, 2011 Contractor: Finn, Jeff Client: Three Hammer Const Inc. | Permit id: Elect20101914 | |||||
SCORE 89 Btu, 80%2 ton, seerductwork Client: Three Hammer Const Inc. | Permit id: Mech20102708 | |||||
SCORE 93 New 1-family residence: gas piping Date: July 20, 2011 Contractor: Martinovich, Shaun Client: Three Hammer Const Inc. | Permit id: Mech20102709 | |||||
Btu, 80%2 ton, 15 seer due to insufficient notice, it is contractors responsibility to notify homeowner city inspection may not occur on install date Date: June 11, 2010 Value: $7,610 Client: Lapp, Richard | Permit id: Mech20101768 | |||||
SCORE 96 Btu, 80%2 ton, 15 seer due to insufficient notice, it is contractors responsibility to notify homeowner city inspection may not occur on install date Client: Lapp, Richard | Permit id: Mech20101768 | |||||
SCORE 96 Btu, 80%2 ton, 15 seer due to insufficient notice, it is contractors responsibility to notify homeowner city inspection may not occur on install date Client: Lapp, Richard | Permit id: Mech20101768 | |||||
SCORE 89 Btu, 80%2 ton, seerductwork Client: Three Hammer Const Inc. | Permit id: Mech20102705 | |||||
Lot: #296. Subd: linden pte. 1-family: 3 bdrms, 3 full baths, 3-car attached garage (640), finished basement (723), unfinished basement (614) and 1 attached deck. Zoning clearance: #10-0688. Setbacks: n 30, e 30, s 10, w 46. Per b. A. 6/2/10. Date: June 11, 2010 Value: $92,700 Permit id: Sfd20101759 | |||||
SCORE 65 New 1-family residence: lot 296 linden pointe. 3 bedrooms, 2 full baths, 6 sf attached garage, unfinished basement, 12 x 12 deck. Setbacks: n 30, s 194", w 374", e 30. Client: Three Hammer Const Inc. | Permit id: Sfd20103386 | |||||
(1) t/sh, (1) sh, (2) wc, (2) lav, (1) ks, (1) dw, (1) wb, (1) gal wtrhtr, (1) fd, basement rough, swrwtr 24 hour notice not provided by contractor Date: January 31, 2011 Value: $6,500 Client: Three Hammer Const Inc. | Permit id: Plum20102208 | |||||
New 1-family residence: lot 296 linden pointe. 3 bedrooms, 2 full baths, 6 sf attached garage, unfinished basement, 12 x 12 deck. Setbacks: n 30, s 194", w 374", e 30. Date: February 1, 2011 Client: Three Hammer Const Inc. | Permit id: Elect20101913 | |||||
Btu, 80%2 ton, seerductwork Date: March 9, 2011 Value: $4,500 Client: Three Hammer Const Inc. | Permit id: Mech20102705 | |||||
New 1-family residence: gas piping Date: July 20, 2011 Client: Three Hammer Const Inc. | Permit id: Mech20102706 | |||||
SCORE 89 New 1-family residence: lot 296 linden pointe. 3 bedrooms, 2 full baths, 6 sf attached garage, unfinished basement, 12 x 12 deck. Setbacks: n 30, s 194", w 374", e 30. Date: February 1, 2011 Contractor: Finn Jeff Client: Three Hammer Const Inc. | Permit id: Elect20101913 | |||||
SCORE 93 (1) t/sh, (1) sh, (2) wc, (2) lav, (1) ks, (1) dw, (1) wb, (1) gal wtrhtr, (1) fd, basement rough, swrwtr 24 hour notice not provided by contractor Client: Three Hammer Const Inc. | Permit id: Plum20102208 | |||||
SCORE 89 Btu, 80%2 ton, seerductwork Client: Three Hammer Const Inc. | Permit id: Mech20102705 | |||||
SCORE 93 New 1-family residence: gas piping Date: July 20, 2011 Contractor: Martinovich Shaun Client: Three Hammer Const Inc. | Permit id: Mech20102706 | |||||
SCORE 93 (1) t sh, (1) sh, (2) wc, (2) lav, (1) ks, (1) dw, (1) wb, (1) gal wtrhtr, (1) fd, basement rough, swrwtr 24 hour notice not provided by contractor Client: Three Hammer Const Inc. | Permit id: Plum20102208 | |||||
SCORE 89 New 1-family residence: lot 296 linden pointe. 3 bedrooms, 2 full baths, 6 sf attached garage, unfinished basement, 12 x 12 deck. Setbacks: n 30, s 194", w 374", e 30. Date: February 1, 2011 Contractor: Finn, Jeff Client: Three Hammer Const Inc. | Permit id: Elect20101913 | |||||
Lot: #296. Subd: linden pte. 1-family: 3 bdrms, 3 full baths, 3-car attached garage (640), finished basement (723), unfinished basement (614) and 1 attached deck. Zoning clearance: #10-0688. Setbacks: n 30, e 30, s 10, w 46. Per b. A. 6 2 10. Date: June 11, 2010 Value: $92,700 Permit id: Sfd20101759 | |||||
SCORE 93 New 1-family residence: gas piping Date: July 20, 2011 Contractor: Martinovich, Shaun Client: Three Hammer Const Inc. | Permit id: Mech20102706 | |||||
SCORE 99 Install sidewalk Date: July 6, 2010 Contractor: Aa Construction Permit id: Row20101466 | |||||
SCORE 82 Directional bore under sandy hollow rd at publishers dr and head north on e side. 432 Date: October 5, 2010 Contractor: Kentucky Data Link Permit id: Row20102498 | |||||
Line 1 locations of sewer pipe for rrwrd Date: October 20, 2010 Permit id: Row20102546 | |||||
SCORE 56 Line 1 locations of sewer pipe for rrwrd Date: October 20, 2010 Contractor: Michels Corporation Brady Sonnenberg Permit id: Row20102546 | |||||
SCORE 56 Line 1 locations of sewer pipe for rrwrd Date: October 20, 2010 Contractor: Michels Corporation, Brady Sonnenberg Permit id: Row20102546 | |||||
SCORE 96 Sanitary mainline repair Date: January 4, 2011 Contractor: Rock River Water Reclamation District Permit id: Row20111012 | |||||
SCORE 89 San sewer mainline repair Date: March 3, 2011 Contractor: Rock River Reclamation Permit id: Row20111183 | |||||
SCORE 96 Electrical: equipment wiringfull submittal for a new two story precast concrete and metal panel office and manufacturing facility. Building plan review #11-1112. Permit id: Elect20111797 | |||||
Foundation submittal for a new two story precast concrete and metal panel office and manufacturing facility. Building plan review #11-1010. Date: November 1, 2011 Value: $500,000 Permit id: Mulcom20112015 | |||||
Water service & underground before full building permit is issued. Date: December 6, 2011 Value: $20,000 Permit id: Plum20112230 | |||||
SCORE 89 Install 8" water service Date: December 6, 2011 Contractor: Rockford Water Department Permit id: Row20112442 | |||||
Be aerospace precast and steel. Prior to full permit for precast concrete and steel erection. Building plan review #11-1112. Date: December 12, 2011 Value: $500,000 Permit id: Mulcom20112170 | |||||
Install underground & overhead primary facilities in row off logistics pkwy to serve new aerospace bldg located at 5795 logistics pkwy off blackhawk rd. Date: December 28, 2011 Permit id: Row20112500 | |||||
SCORE 96 Temporary service Client: Be Aero Space | Permit id: Elect20121083 | |||||
SCORE 96 Install 6 of pe gas main Date: February 6, 2012 Contractor: Nicor Gas Permit id: Row20121097 | |||||
Full submittal for a new two story precast concrete and metal panel office and manufacturing facility. Building plan review #11-1112. Date: February 14, 2012 Permit id: Mulcom20112126 | |||||
New rtu 85% 2,490,0 btu, 97. 5 ton, ductwork, exhaust, 1 - 3ton ductless split system. Full submittal for a new two story precast concrete and metal panel office and manufacturing facility. Building plan review #11-1112. Date: February 17, 2012 Value: $240,000 Client: Be Aero Space | Permit id: Mech20112696 | |||||
Gas piping 2. 14 mil for new bldgfull submittal for a new two story precast concrete and metal panel office and manufacturing facility. Building plan review #11-1112. Date: February 17, 2012 Value: $12,000 Client: Be Aero Space | Permit id: Mech20112697 | |||||
2 shw, 13 wc, 6 urinal, 9 lav, 2 hose bibb, 3 ks, 1 rpz 2", 2 drk ftn, 2 mop sinks, 12 fd, sewer, water, gal gas wh, 1 instantaneous wh, 1/2 bradley wash fountain= 3, lawn rpz 1 1/2"full submittal for a new two story precast concrete and metal panel office and manufacturing facility. Building plan review #11-1112. Date: February 17, 2012 Value: $190,000 Client: Be Aero Space | Permit id: Plum20112188 | |||||
SCORE 96 Electrical: equipment wiringfull submittal for a new two story precast concrete and metal panel office and manufacturing facility. Building plan review #11-1112. Permit id: Elect20111797 | |||||
SCORE 95 2-22-12 sprinkler heads 2 child permit full submittal for a new two story precast concrete and metal panel office and manufacturing facility. Building plan review #11-1112. Date: February 22, 2012 Contractor: Absolute Fire Protection Permit id: Plum20112189 | |||||
SCORE 99 Directional bore 227 of copper cable and 1 1. 25" ipp Date: May 4, 2012 Contractor: At And T Permit id: Row20121431 | |||||
Add two illuminated channel letters to new construction building. Date: May 9, 2012 Value: $4,626 Permit id: Mulcom20121262 | |||||
Add two illuminated channel letters to new construction building. Date: May 9, 2012 Value: $4,821 Permit id: Mulcom20121261 | |||||
SCORE 89 Gas piping 2. 14 mil for new bldgfull submittal for a new two story precast concrete and metal panel office and manufacturing facility. Building plan review #11-1112. Client: Be Aero Space | Permit id: Mech20112697 | |||||
SCORE 86 Add two illuminated channel letters to new construction building. Permit id: Mulcom20121262 | |||||
SCORE 93 Full submittal for a new two story precast concrete and metal panel office and manufacturing facility. Building plan review #11-1112. Date: February 14, 2012 Contractor: Cord Construction Cord Construction Permit id: Mulcom20112126 | |||||
SCORE 86 Add two illuminated channel letters to new construction building. Permit id: Mulcom20121261 | |||||
SCORE 93 Be aerospace precast and steel. Prior to full permit for precast concrete and steel erection. Building plan review #11-1112. Permit id: Mulcom20112170 | |||||
SCORE 89 Water service & underground before full building permit is issued. Permit id: Plum20112230 | |||||
SCORE 89 2 shw, 13 wc, 6 urinal, 9 lav, 2 hose bibb, 3 ks, 1 rpz 2", 2 drk ftn, 2 mop sinks, 12 fd, sewer, water, gal gas wh, 1 instantaneous wh, 1/2 bradley wash fountain= 3, lawn rpz 1 1/2"full submittal for a new two story precast concrete and metal panel office and manufacturing facility. Building plan review #11-1112. Client: Be Aero Space | Permit id: Plum20112188 | |||||
SCORE 56 Install underground & overhead primary facilities in row off logistics pkwy to serve new aerospace bldg located at 5795 logistics pkwy off blackhawk rd. Date: December 28, 2011 Contractor: Com Ed Louis Sola Permit id: Row20112500 | |||||
SCORE 96 New rtu 85% 2,490,0 btu, 97. 5 ton, ductwork, exhaust, 1 - 3ton ductless split system. Full submittal for a new two story precast concrete and metal panel office and manufacturing facility. Building plan review #11-1112. Client: Be Aero Space | Permit id: Mech20112696 | |||||
SCORE 93 Foundation submittal for a new two story precast concrete and metal panel office and manufacturing facility. Building plan review #11-1010. Permit id: Mulcom20112015 | |||||
SCORE 95 2-22-12 sprinkler heads 2 child permit full submittal for a new two story precast concrete and metal panel office and manufacturing facility. Building plan review #11-1112. Date: February 22, 2012 Contractor: Absolute Fire Protection Permit id: Plum20112189 | |||||
SCORE 86 Add two illuminated channel letters to new construction building. Permit id: Mulcom20121262 | |||||
SCORE 93 Foundation submittal for a new two story precast concrete and metal panel office and manufacturing facility. Building plan review #11-1010. Permit id: Mulcom20112015 | |||||
SCORE 89 2 shw, 13 wc, 6 urinal, 9 lav, 2 hose bibb, 3 ks, 1 rpz 2", 2 drk ftn, 2 mop sinks, 12 fd, sewer, water, gal gas wh, 1 instantaneous wh, 1 2 bradley wash fountain= 3, lawn rpz 1 1 2"full submittal for a new two story precast concrete and metal panel office and manufacturing facility. Building plan review #11-1112. Client: Be Aero Space | Permit id: Plum20112188 | |||||
SCORE 89 Gas piping 2. 14 mil for new bldgfull submittal for a new two story precast concrete and metal panel office and manufacturing facility. Building plan review #11-1112. Client: Be Aero Space | Permit id: Mech20112697 | |||||
SCORE 96 New rtu 85% 2,490,0 btu, 97. 5 ton, ductwork, exhaust, 1 - 3ton ductless split system. Full submittal for a new two story precast concrete and metal panel office and manufacturing facility. Building plan review #11-1112. Client: Be Aero Space | Permit id: Mech20112696 | |||||
SCORE 56 Install underground & overhead primary facilities in row off logistics pkwy to serve new aerospace bldg located at 5795 logistics pkwy off blackhawk rd. Date: December 28, 2011 Contractor: Com Ed, Louis Sola Permit id: Row20112500 | |||||
SCORE 89 Water service & underground before full building permit is issued. Permit id: Plum20112230 | |||||
SCORE 93 Full submittal for a new two story precast concrete and metal panel office and manufacturing facility. Building plan review #11-1112. Date: February 14, 2012 Contractor: Cord Construction, Cord Construction Permit id: Mulcom20112126 | |||||
SCORE 86 Add two illuminated channel letters to new construction building. Permit id: Mulcom20121261 | |||||
SCORE 93 Be aerospace precast and steel. Prior to full permit for precast concrete and steel erection. Building plan review #11-1112. Permit id: Mulcom20112170 | |||||
SCORE 96 Temporary service Client: Be Aero Space | Permit id: Elect20121083 | |||||
SCORE 99 Directional bore 227 of copper cable and 1 1. 25" ipp Date: May 4, 2012 Contractor: At And T Permit id: Row20121431 | |||||
SCORE 96 Electrical: equipment wiringfull submittal for a new two story precast concrete and metal panel office and manufacturing facility. Building plan review #11-1112. Permit id: Elect20111797 | |||||
SCORE 95 2-22-12 sprinkler heads 2 child permit full submittal for a new two story precast concrete and metal panel office and manufacturing facility. Building plan review #11-1112. Date: February 22, 2012 Contractor: Absolute Fire Protection Permit id: Plum20112189 | |||||
SCORE 96 Temporary service Client: Be Aero Space | Permit id: Elect20121083 | |||||
SCORE 89 Replace hydrant Date: April 2, 2012 Contractor: Rockford Water Department Permit id: Row20121255 | |||||
Place aerial fiber on ce poles Date: April 26, 2012 Permit id: Row20121375 | |||||
SCORE 65 Place aerial fiber on ce poles Date: April 26, 2012 Contractor: Peters Engineering Inc Permit id: Row20121375 | |||||
SCORE 65 Place aerial fiber on ce poles Date: April 26, 2012 Contractor: Peters Engineering, Inc Permit id: Row20121375 | |||||
SCORE 62 This work is done for at&t, aerial placement and directional boring. Date: August 16, 2012 Contractor: Frontier Communications Permit id: Row20121948 | |||||
SCORE 100 Primera / comed will be replacing cable, replacing 8 existing poles and installing 4 new poles. Date: November 28, 2012 Contractor: Commonwealth Edison Permit id: Row20121728 | |||||
SCORE 100 Primera comed will be replacing cable, replacing 8 existing poles and installing 4 new poles. Date: November 28, 2012 Contractor: Commonwealth Edison Permit id: Row20121728 |