Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 89 2683 Joseph Ln Rockford, Il 61103 Lot: 27. Subd: stevens ridge. 1-family: new 750 btu furnace, new 2. 5 ton air Date: March 11, 2009 Contractor: Geiken Joseph Client: Three Hammer Construction, Glenn Hammack | Permit id: Mech20081186 | |||||
SCORE 89 2721 Joseph Ln Rockford, Il 61103 Finish lower level: bdrm, rec rom and bath. Part of the lower level will not be finished. 2 heat runs, 2 cool air runs, 1 bath fan Date: September 17, 2009 Contractor: Geiken Joseph Client: Three Hammer Construction, Glenn Hammack | Permit id: Mech20092010 | |||||
SCORE 89 Client: Three Hammer Construction, Glenn Hammack | Permit id: Mech20092607 | |||||
SCORE 89 Date: February 8, 2010 Contractor: Geiken Joseph Permit id: Mech20092563 | |||||
SCORE 89 2619 Joseph Ln Rockford, Il 61103 Construct a new single family residence120,0 btu 80% furnace 3. 5 ton a/c, ductwork Date: October 5, 2009 Contractor: Geiken Joseph Permit id: Mech20092062 | |||||
SCORE 89 Date: May 21, 2009 Contractor: Geiken Joseph Permit id: Mech20091574 | |||||
SCORE 89 Date: April 8, 2009 Contractor: Geiken Joseph Permit id: Mech20091413 | |||||
SCORE 89 Client: Burkhamer, Daniel | Permit id: Mech20111675 | |||||
SCORE 89 Client: R S G | Permit id: Mech20111328 | |||||
SCORE 89 1667 Divine Dr Rockford, Il 61107 New 1-family - lot 175, red oak estates- 4 bedrooms, 3 full baths, 1 partial bath, 809 sf attached garage, unfinished basement, 288 sf deck. Setbacks: n 96, e 502, s 96, w 30. Date: April 11, 2011 Contractor: Geiken Joseph Client: Three Hammer Const Inc. | Permit id: Mech20102855 | |||||
SCORE 89 Date: October 18, 2010 Contractor: Geiken Joseph Permit id: Mech20102368 | |||||
SCORE 89 4405 St Annes Way Rockford, Il 61114 Child permit - misc ductwork, exhaust cfm add 12 x bathroom on back of house with shower, (2) lavs, toilet and laundry. Remove existing master bath and turn it into walk-in closetelectrical, mechanical and plumbing child permits. No electrical, mechanical and plumbing permits are issued with this permit. No electrical, mechanical or plumbing work may be started until a licensed contractor applies for and receives their individual permits. Permit id: Mech20122143 | |||||
SCORE 89 Date: February 8, 2010 Contractor: Geiken Joseph Client: Three Hammer Construction, Glenn Hammack | Permit id: Mech20092577 | |||||
SCORE 89 5002 Spring Brook Rd Rockford, Il 61114 10-24-12 repl. Furnace - 95% eff - btu 120k & repl. Ac - 5 ton - ductwork (jcalcs incld) -fireplace -solid fuel - gas & exhaust - 1 (total) cfm - 2 fans - notes: fireplace: 1) 36" gas - 1) 42 - solid fuel (wood) child permit second story 7 square foot addition with deck. Addition to be great room, bedroom, office and full bath. Mechanical, plumbing, and electrical child permits are not issued with this building permit. Each child permit must be applied for and issued to a licensed sub-contractor before any mechanical, plumbing or electrical work is started. Client: Rizvi, Kim | Permit id: Mech20122002 | |||||
SCORE 89 Date: February 8, 2010 Contractor: Geiken Joseph Client: Three Hammer Construction, Glenn Hammack | Permit id: Mech20092571 | |||||
SCORE 89 Client: Burkhamer, Patti | Permit id: Mech20111676 | |||||
SCORE 89 Client: Hopkins Group | Permit id: Mech20111367 | |||||
SCORE 89 Client: Three Hammer Const Inc. | Permit id: Mech20102705 | |||||
SCORE 89 Client: Three Hammer Const Inc. | Permit id: Mech20102708 |