Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 59 Provide demolition and remodel of the fill plant at the us welding facility to include installation of a boiler, unit heaters, heat pumps and mechanical room work. 1 furnace, 8 unit heaters, ductwork, 2 boilers, 3 evap coolers, gaslines, exhaust fan, and heat pump. Construction activities may not commence until bld2016-011 has been issued. Date: February 12, 2016 Contractor: Cci Mechanical Inc671113 Us Welding Fill Plant Permit type: Mechanical | Permit status: Inspections | Completion date: February 16, 2016 | Current use: Commercial | Permit id: Bld2016-01184 | |||||
SCORE 59 Install water heater, dist piping, and water lines. Construction activities may not commence until bld2016-011 has been issued. Date: February 12, 2016 Contractor: Cci Mechanical Inc671113 Us Welding Fill Plant Permit type: Plumbing | Permit status: Inspections | Completion date: February 16, 2016 | Current use: Commercial | Permit id: Bld2016-01180 | |||||
SCORE 56 Manual fire alarm system. Using a fike cheetah xi- panel to perform building fire alarm, preaction and fm-2 detection and control functions. Date: April 19, 2016 Contractor: State Fire Dc Specialtiesus Welding Fire Alarm Permit type: Low voltage | Permit status: Inspections | Completion date: May 20, 2016 | Current use: Commercial | Permit id: Bld2016-03676 | |||||
SCORE 61 Fm 2 system including pre-action detection and control Date: October 30, 2015 Contractor: State Fireus Welding Detection Control Permit type: Fire | Permit status: Inspections | Completion date: February 25, 2016 | Current use: Commercial | Permit id: Bld2015-09337 | |||||
SCORE 64 Removing a portion of the existing fire sprinkler system. Installing a new double interlock pre-action system throughout the area and re-connecting the existing. Date: July 13, 2015 Contractor: State Fire Dc Specialtiesus Welding Permit type: Fire | Permit status: Completed | Completion date: July 21, 2015 | Current use: Commercial | Permit id: Bld2015-05228 | |||||
SCORE 64 Wall repair: to remove and save the coping cap metal. To remove and dispose of the loose or damaged wall flashing. To install new asphalt wall flashings where the damaged wall flashings were removed. To install new asphalt wall flashings up and over the parapet walls. To re-install the coping cap metal. To touch-up and repair any defects on the roof top curbs. Northeast and northwest corners: 6,856. Entire perimeter: 13,560. To remove and dispose of the loose pea gravel. To remove and save the existing coping cap metal. To install a 1 2" dens deck cover board. To install a mil xt kee fibertite membrane. To mechanically attach to the structural deck. To re-install the existing coping cap metal. A 15 year manufacturers warranty on labor and materials. A 15 year manufacturers warranty on labor and materials. Date: May 10, 2013 Contractor: Calrk Roofingus Welding Office Salt Lake City Permit type: Roofing | Permit status: Completed | Completion date: May 13, 2013 | Current use: Commercial | Permit id: Bld2013-03017 | |||||
SCORE 86 Temp power to north adjacent vacant lot. Date: May 11, 2015 Contractor: High West Contractors Llc Permit type: Electrical | Permit status: Reviews not require | Completion date: May 11, 2015 | Current use: Commercial | Permit id: Bld2015-03295 | |||||
SCORE 59 Interior remodel Date: December 29, 2015 Contractor: Tom Stevens Construction Incus Welding Permit status: Inspections | Completion date: March 18, 2016 | Current use: Commercial | Permit id: Bld2015-11042 | |||||
SCORE 59 Elect for remodel Date: March 30, 2016 Contractor: U S Welding Permit type: Electrical | Permit status: Inspections | Completion date: March 30, 2016 | Current use: Commercial | Permit id: Bld2016-02929 | |||||
SCORE 59 Electrical work Date: May 13, 2016 Contractor: Skyline Electric Companyus Welding Permit type: Electrical | Permit status: Inspections | Completion date: May 13, 2016 | Current use: Commercial | Permit id: Bld2016-04609 |