Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 86 Removing a portion of the existing fire sprinkler system. Installing a new double interlock pre-action system throughout the area and re-connecting the existing. Date: July 13, 2015 Contractor: State Fire Dc Specialties Permit type: Fire | Permit status: Completed | Completion date: July 21, 2015 | Current use: Commercial | Permit id: Bld2015-05228 | |||||
SCORE 86 Temp power to north adjacent vacant lot. Date: May 11, 2015 Contractor: High West Contractors Llc Permit type: Electrical | Permit status: In progress | Completion date: May 11, 2015 | Current use: Commercial | Permit id: Bld2015-03295 | |||||
SCORE 61 Wall repair: to remove and save the coping cap metal. To remove and dispose of the loose or damaged wall flashing. To install new asphalt wall flashings where the damaged wall flashings were removed. To install new asphalt wall flashings up and over the parapet walls. To re-install the coping cap metal. To touch-up and repair any defects on the roof top curbs. Northeast and northwest corners: 6,856. Entire perimeter: 13,560. To remove and dispose of the loose pea gravel. To remove and save the existing coping cap metal. To install a 1 2" dens deck cover board. To install a mil xt kee fibertite membrane. To mechanically attach to the structural deck. To re-install the existing coping cap metal. A 15 year manufacturers warranty on labor and materials. A 15 year manufacturers warranty on labor and materials. Date: May 10, 2013 Contractor: Calrk Roofing Permit type: Roofing | Permit status: Pass | Completion date: May 13, 2013 | Current use: Commercial | Permit id: Bld2013-03017 | |||||
SCORE 61 Equipment modernization Date: September 17, 2015 Contractor: Tom Stevens Construction Incu.S. Welding Permit type: Permit | Permit status: Inspections | Completion date: October 20, 2015 | Current use: Commercial | Permit id: Bld2015-07555 | |||||
SCORE 64 Removing a portion of the existing fire sprinkler system. Installing a new double interlock pre-action system throughout the area and re-connecting the existing. Date: July 13, 2015 Contractor: State Fire Dc Specialtiesus Welding Permit type: Fire | Permit status: Inspections | Completion date: July 21, 2015 | Current use: Commercial | Permit id: Bld2015-05228 | |||||
SCORE 64 Wall repair: to remove and save the coping cap metal. To remove and dispose of the loose or damaged wall flashing. To install new asphalt wall flashings where the damaged wall flashings were removed. To install new asphalt wall flashings up and over the parapet walls. To re-install the coping cap metal. To touch-up and repair any defects on the roof top curbs. Northeast and northwest corners: 6,856. Entire perimeter: 13,560. To remove and dispose of the loose pea gravel. To remove and save the existing coping cap metal. To install a 1/2" dens deck cover board. To install a mil xt kee fibertite membrane. To mechanically attach to the structural deck. To re-install the existing coping cap metal. A 15 year manufacturers warranty on labor and materials. A 15 year manufacturers warranty on labor and materials. Date: May 10, 2013 Contractor: Calrk Roofingus Welding Office Salt Lake City Permit type: Roofing | Permit status: Inspections | Completion date: May 13, 2013 | Current use: Commercial | Permit id: Bld2013-03017 | |||||
SCORE 61 Interior remodel Date: March 18, 2016 Contractor: Us Weldingtom Stevens Permit status: Inspections | Current use: Commercial | Permit id: Bld2015-11042 | |||||
SCORE 61 Equipment modernization Date: October 20, 2015 Contractor: U.S. Weldingtom Stevens Permit status: Inspections | Current use: Commercial | Permit id: Bld2015-07555 | |||||
SCORE 64 Wall repair: to remove and save the coping cap metal. To remove and dispose of the loose or damaged wall flashing. To install new asphalt wall flashings where the damaged wall flashings were removed. To install new asphalt wall flashings up and over the parapet walls. To re-install the coping cap metal. To touch-up and repair any defects on the roof top curbs. Northeast and northwest corners: 6,856. Entire perimeter: 13,560. To remove and dispose of the loose pea gravel. To remove and save the existing coping cap metal. To install a 1 2" dens deck cover board. To install a mil xt kee fibertite membrane. To mechanically attach to the structural deck. To re-install the existing coping cap metal. A 15 year manufacturers warranty on labor and materials. A 15 year manufacturers warranty on labor and materials. Date: May 10, 2013 Contractor: Calrk Roofingus Welding Office Salt Lake City Permit type: Roofing | Permit status: Inspections | Completion date: May 13, 2013 | Current use: Commercial | Permit id: Bld2013-03017 | |||||
SCORE 86 Temp power to north adjacent vacant lot. Date: May 11, 2015 Contractor: High West Contractors Llc Permit type: Electrical | Permit status: Inspections | Completion date: May 11, 2015 | Current use: Commercial | Permit id: Bld2015-03295 | |||||
SCORE 64 Removing a portion of the existing fire sprinkler system. Installing a new double interlock pre-action system throughout the area and re-connecting the existing. Date: July 13, 2015 Contractor: State Fire Dc Specialtiesus Welding Permit type: Fire | Permit status: Inspections | Completion date: July 21, 2015 | Current use: Commercial | Permit id: Bld2015-05228 | |||||
SCORE 61 Equipment modernization Date: September 17, 2015 Contractor: Tom Stevens Construction Incu.S. Welding Permit status: Inspections | Completion date: October 20, 2015 | Current use: Commercial | Permit id: Bld2015-07555 |