Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 71 Update (2) bathrooms and kitchen on first floor. No structural work. Parcel: 82004 0079bh | |||||
SCORE 69 Remodel kitchen, 2 bathrooms, and reaplce 2 hvac units Parcel: 82004 0079cu | |||||
SCORE 95 Renovate kitchen, bathroom, floors. No structural. Parcel: 82004 0079cq | |||||
SCORE 67 Bldg 40: new rubber roof. No structural work. Parcel: 82004 0079zz | |||||
SCORE 67 Building - strip and reroof. Parcel: 82004 0079zz | |||||
SCORE 67 Building only - remove & install tapered polyisocyanurate insualtion & carlisle. 0 " fully adhered epdm membrane Parcel: 82004 0079zz | |||||
SCORE 59 Renovate existing kitchen and master bathroom and change door locations. No structural work Parcel: 82004 0079ck | |||||
SCORE 95 Replace existing kit. Cabinets & move 1 wall in bathrm & renovate master bath Parcel: 82004 0079ay | |||||
SCORE 86 Renovate kitchen and master bathroom master closet. No structural work. Parcel: 82004 0079bp | |||||
SCORE 86 New kitchen install, new master bath renovation Parcel: 82004 0079bw | |||||
SCORE 67 Kitchen and master bath remodeling, minor interior non-structural reframing and other misc. Interior renovations per attached plan. No structural work. Parcel: 82004 0079ct | |||||
SCORE 60 Renovate exstg unit. Work include: new kitchen, new baths. Partition removal all (none structural work) all new electric & hvac Parcel: 82004 0079au | |||||
SCORE 65 Remodel kitchen, masterbath, powder room Parcel: 82004 0079aa | |||||
SCORE 100 Bldg remove existing rubber roof and install new fullyy adhered rubber roof over tapered insulation Parcel: 82004 0079aa | |||||
SCORE 86 Unit 1-a -remodel master bathroom- no structural Parcel: 82004 0079ch | |||||
SCORE 77 Demo 1 kitchen, 1 bath, remodel kitchen and bath, add 1 full bath, install hardwood flooring, heat pump ac, rebuild deck, paint Parcel: 82004 0079cy | |||||
SCORE 100 Renovate master bath, install new floor, paint, and cabinets Parcel: 82004 0079as | |||||
SCORE 86 Bldg un 3b- remodel 3 bathrooms. 1 master bath 2. Guest bathroom 3. Powder room Parcel: 82004 0079bl | |||||
SCORE 56 Install new partition wall and paint office Parcel: 82004 0079cz | |||||
SCORE 56 Complete remodel of existing unit Parcel: 82004 0079cz | |||||
SCORE 86 Remodel existing bathroom Parcel: 82004 0079bz | |||||
SCORE 86 Renovate master bath and closet; open non bearing wall from dining room to kitchen into 1 2 wall; replace countertop; lighting and hvac replacement Parcel: 82004 0079aq | |||||
SCORE 67 Modify (2) non-structural interior doorways; remodel kitchen and (2) baths; interior renovations. Parcel: 82004 0079cr |