Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 93 New kitchen, new doors and windows on first floor rear, rework laundry, remodel third floor, new hvac equipment ,rework ducts, paint, refinish wood floors Permit type: Addition/alteration | Completion date: July 10, 2013 | Current use: One-family | Parcel: 23610 | |||||
SCORE 93 Re roofing house, installing new copper gutters. Replace appx. 1/3 of the siding on house. Replace rotten trim as needed. Replace front door with cutom made door to match existing exactly. Install new decking, trim and handrails on existing porch frames. Replace some exterior lighting in same locations. Permit type: Addition/alteration | Completion date: April 25, 2014 | Current use: One-family | Parcel: 23610 | |||||
SCORE 100 Crane, boom, pump truck Date: April 30, 2014 Contractor: Maltby And Company Permit id: Cbp13863 | |||||
SCORE 93 Re roofing house, installing new copper gutters. Replace appx. 1 3 of the siding on house. Replace rotten trim as needed. Replace front door with cutom made door to match existing exactly. Install new decking, trim and handrails on existing porch frames. Replace some exterior lighting in same locations. Permit type: Addition/alteration | Completion date: April 25, 2014 | Current use: One-family | Permit id: 0 | Parcel: 23610 |