Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 82 Hvac change out - split system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: May 9, 2017 Contractor: A Heating And Cooling Inc Permit type: Addn | Permit status: Issued | Permit id: Pds2017-Resalt- | |||||
SCORE 79 Roof mount residential solar pv for existing sfd (no meter upgrade). This permit does not exempt any existing structures from compliance with applicable building code and zoning ordinance requirements. Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: November 3, 2017 Contractor: Smart Solar Design Construction Llc Permit type: Addn | Permit status: Completed | Completion date: November 14, 2017 | Permit id: Pds2017-Resalt- | |||||
Final Date: November 3, 2017 Permit status: Fail | Permit id: Pds2017-Resalt- | |||||
SCORE 82 Hvac change out - split system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: May 9, 2017 Contractor: A Heating And Cooling Inc Permit type: Hvac change out | Permit status: Issued | Permit id: Pds2017-Resalt- |