Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Fire sprinkler ![]() Permit status: Permit finaled | Current use: Commercial | Permit id: 14043-10000-021 | |||||
SCORE 96 Hvac ![]() ![]() Permit status: Permit finaled | Current use: Commercial | Permit id: 15044-90000-070 | |||||
SCORE 100 Deferred submittal- curtainwall for new office building. Ref. 13010-1 ![]() ![]() Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 13010-10005-013 | |||||
SCORE 77 Electrical ![]() ![]() Permit status: Permit finaled | Current use: Commercial | Permit id: 15041-10000-323 | |||||
SCORE 100 Plumbing ![]() ![]() Permit status: Permit finaled | Current use: Commercial | Permit id: 15042-90000-179 | |||||
SCORE 100 Electrical ![]() ![]() Permit status: Permit finaled | Current use: Commercial | Permit id: 15041-10000-293 | |||||
SCORE 88 Deferred submittal of light gage metal stud framing for building permi ![]() ![]() Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 13010-10007-013 | |||||
SCORE 100 Installation of standpipe and sprinkler system within a 4 story office ![]() ![]() Permit type: Fire sprinkler | Permit status: Permit finaled | Current use: Commercial | Permit id: 14043-10000-016 | |||||
SCORE 59 Install emergency door release at 2nd floor elevator lobby door; per 2 Permit type: Bldg-alter/repair | Permit status: Issued | Current use: Commercial | Permit id: 15016-10000-225 | |||||
SCORE 96 Plumbing ![]() ![]() Permit status: Permit closed | Current use: Commercial | Permit id: 14042-10000-017 | |||||
SCORE 100 Electrical ![]() ![]() Permit status: Permit closed | Current use: Special equipment | Permit id: 14041-90000-101 | |||||
SCORE 96 New building, core & shell office ,4 stories building, 9055 sf, pc is ![]() ![]() Permit type: Electrical | Permit status: Permit finaled | Current use: Commercial | Permit id: 13041-10000-213 | |||||
SCORE 81 Plancheck for temporary power only for 3 buildings. East building: 95 ![]() ![]() Permit type: Electrical | Permit status: Permit closed | Current use: Commercial | Permit id: 14041-10000-052 | |||||
Plumbing ![]() Permit status: Permit finaled | Current use: Commercial | Permit id: 15042-10000-182 | |||||
SCORE 74 Complete plumbing for new (east) building shell and core- office. 4 st ![]() ![]() Permit type: Plumbing | Permit status: Permit finaled | Current use: Commercial | Permit id: 13042-10000-154 | |||||
SCORE 74 Shell and core for a 4 story office building. Building bldg 1 of 2. ![]() ![]() Permit type: Hvac | Permit status: Issued | Current use: Commercial | Permit id: 13044-10000-082 | |||||
SCORE 64 Site preparation & excavation & removal & recompaction & site drainag Permit type: Grading | Permit status: Permit finaled | Current use: Commercial | Permit id: 13030-10000-015 | |||||
SCORE 65 Installation of (7) simplex sump pump systems for bioswale overflow an ![]() ![]() Permit type: Plumbing | Permit status: Permit finaled | Current use: Commercial | Permit id: 15042-10000-152 | |||||
SCORE 100 Pressure vessel ![]() ![]() Permit status: Permit finaled | Current use: Commercial | Permit id: 15045-10000-001 | |||||
SCORE 59 Installing (2) type-i hoods and make-up air fan. ![]() ![]() Permit type: Hvac | Permit status: Permit finaled | Current use: Commercial | Permit id: 15044-10000-054 | |||||
SCORE 89 Fire sprinkler ![]() ![]() Permit status: Permit finaled | Current use: Commercial | Permit id: 15043-10000-013 | |||||
SCORE 91 Supplemental permit to revise methane plans and change of methane miti ![]() ![]() Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 13010-10006-013 | |||||
SCORE 98 Supplemental to 13010-10000-01379 to review destination oriented eleva ![]() ![]() Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 13010-10009-013 | |||||
Supplemental permit for the deffered submittal of 3-sets of metal stai ![]() Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 13010-10008-013 | |||||
SCORE 64 Proposed 853-0" long with max. 20-0" height temporary shoring with Permit type: Nonbldg-new | Permit status: Permit finaled | Current use: Commercial | Permit id: 13020-10000-006 | |||||
SCORE 96 Supplemental to 13010-10000-01379 to check the drawing for p. T. Slab f ![]() ![]() Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 13010-10004-013 | |||||
SCORE 97 Installation of 3 gen2 elevators within a 4 story office building. Tw ![]() ![]() Permit type: Elevator | Permit status: Permit finaled | Current use: Commercial | Permit id: 14046-10000-017 | |||||
New 4-story office building with commissary space located on the first ![]() ![]() Permit type: Bldg-new | Permit status: Cofo issued | Current use: Commercial | Permit id: 13010-10000-013 | |||||
SCORE 100 New fire alarm system for commercial building. 201 devices and 1 panel ![]() ![]() Permit type: Electrical | Permit status: Permit finaled | Current use: Commercial | Permit id: 14041-10000-126 | |||||
SCORE 86 Electrical ![]() ![]() Permit status: Permit finaled | Current use: Commercial | Permit id: 15041-90000-130 | |||||
SCORE 88 Plumbing ![]() ![]() Permit status: Permit finaled | Current use: Commercial | Permit id: 15042-10000-176 | |||||
SCORE 96 Methane level 2. De-watering is not required. ![]() ![]() Permit type: Plumbing | Permit status: Permit finaled | Current use: Commercial | Permit id: 14042-10000-095 | |||||
SCORE 87 Hvac ![]() ![]() Permit status: Issued | Current use: Commercial | Permit id: 16044-90000-062 | |||||
SCORE 100 Adding pendent heads off of existing fire sprinkler system in 5th floo ![]() ![]() Permit type: Fire sprinkler | Permit status: Permit finaled | Current use: Apartment | Permit id: 16043-10000-026 | |||||
SCORE 91 Electrical ![]() ![]() Permit status: Issued | Current use: Commercial | Permit id: 16041-90000-270 | |||||
SCORE 59 Supplemental permit for the deffered submittal of 3-sets of metal stai ![]() ![]() Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 13010-10008-013 | |||||
SCORE 59 New 4-story office building with commissary space located on the first Permit type: Bldg-new | Permit status: Cofo issued | Current use: Commercial | Permit id: 13010-10000-013 | |||||
SCORE 93 Plumbing ![]() ![]() Permit status: Permit finaled | Current use: Commercial | Permit id: 15042-10000-182 | |||||
SCORE 95 Fire sprinkler ![]() ![]() Permit status: Permit finaled | Current use: Commercial | Permit id: 14043-10000-021 | |||||
SCORE 96 Cut existing slab on grade to provide a 21" maximum depression to incr Permit type: Bldg-alter/repair | Permit status: Issued | Current use: Commercial | Permit id: 16016-10000-180 | |||||
SCORE 81 Electrical ![]() ![]() Permit status: Issued | Current use: Commercial | Permit id: 16041-10000-362 | |||||
SCORE 96 Plumbing ![]() ![]() Permit status: Issued | Current use: Commercial | Permit id: 16042-90000-236 | |||||
SCORE 100 Plan check for change of use from office to recording studio. Total ar ![]() ![]() Permit type: Electrical | Permit status: Issued | Current use: Commercial | Permit id: 16041-30000-337 | |||||
SCORE 82 Ti to the first floor of a commercial building. Includes addition and ![]() ![]() Permit type: Fire sprinkler | Permit status: Issued | Current use: Commercial | Permit id: 16043-10000-052 | |||||
SCORE 100 Full plan check for a 1st time tenant t. I; scope include new lighting ![]() ![]() Permit type: Electrical | Permit status: Issued | Current use: Commercial | Permit id: 16041-10000-341 | |||||
SCORE 82 Ti on the 4th floor with flex heads, adding 165 sprinkler heads. ![]() ![]() Permit type: Fire sprinkler | Permit status: Issued | Current use: Commercial | Permit id: 16043-10000-055 | |||||
SCORE 86 Electrical ![]() ![]() Permit status: Issued | Current use: Commercial | Permit id: 16041-10000-422 | |||||
SCORE 93 Hvac ![]() ![]() Permit status: Issued | Current use: Commercial | Permit id: 16044-10000-139 | |||||
SCORE 95 Electrical ![]() ![]() Permit status: Permit closed | Current use: Commercial | Permit id: 14041-10000-108 | |||||
SCORE 94 Plumbing ![]() ![]() Permit status: Permit finaled | Current use: Commercial | Permit id: 14042-10001-097 | |||||
SCORE 64 New 4-story office building with commissary space located on the first Permit type: Bldg-new | Permit status: Cofo issued | Current use: Commercial | Permit id: 13010-10000-013 | |||||
SCORE 98 Office ti for new new partition wall for corridor and lobby on the 4th Permit type: Bldg-alter/repair | Permit status: Issued | Current use: Commercial | Permit id: 17016-10000-000 | |||||
SCORE 100 Hvac ![]() ![]() Permit status: Issued | Current use: Commercial | Permit id: 17044-10000-001 | |||||
SCORE 96 Installation of mechanical equipment support and anchorage on rooftop. Permit type: Bldg-alter/repair | Permit status: Issued | Current use: Commercial | Permit id: 16016-10000-311 | |||||
SCORE 64 Supplemental permit for the deffered submittal of 3-sets of metal stai ![]() ![]() Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 13010-10008-013 | |||||
SCORE 70 Single floor t. I. New partitions, carpet, paint, ceiling, and hvac req Permit type: Bldg-alter/repair | Permit status: Issued | Current use: Commercial | Permit id: 16016-10000-207 | |||||
SCORE 96 ![]() ![]() Permit status: Permit finaled | Current use: Commercial | Permit id: 17044-90000-113 | |||||
SCORE 96 Alterations on 1st floor. Add partition wall and new exterior wall op Permit status: Permit finaled | Current use: Commercial | Permit id: 17016-10000-248 | |||||
SCORE 59 Install emergency door release at 2nd floor elevator lobby door; per 2 Permit status: Permit expired | Current use: Commercial | Permit id: 15016-10000-225 | |||||
SCORE 86 ![]() ![]() Permit status: Issued | Current use: Commercial | Permit id: 17041-10000-367 | |||||
SCORE 91 ![]() ![]() Permit status: Permit finaled | Current use: Commercial | Permit id: 17041-10000-367 | |||||
SCORE 100 ![]() ![]() Permit status: Permit finaled | Current use: Commercial | Permit id: 17043-90000-050 | |||||
SCORE 99 ![]() ![]() Permit status: Permit finaled | Current use: Commercial | Permit id: 17041-10000-344 | |||||
SCORE 64 Installation of two (2) type i hoods, one (1) type ii hood, and gener ![]() ![]() Permit status: Issued | Current use: Commercial | Permit id: 17044-10000-061 | |||||
SCORE 98 Office ti for new new partition wall for corridor and lobby on the 4th Permit status: Permit finaled | Current use: Commercial | Permit id: 17016-10000-000 | |||||
SCORE 95 ![]() ![]() Permit status: Permit finaled | Current use: Commercial | Permit id: 14043-10000-021 | |||||
SCORE 100 Adding pendent heads off of existing fire sprinkler system in 5th floo ![]() ![]() Permit status: Permit finaled | Current use: Apartment | Permit id: 16043-10000-026 | |||||
SCORE 100 ![]() ![]() Permit status: Permit finaled | Current use: Commercial | Permit id: 15045-10000-001 | |||||
SCORE 93 ![]() ![]() Permit status: Permit finaled | Current use: Commercial | Permit id: 16044-10000-139 | |||||
SCORE 82 Ti to the first floor of a commercial building. Includes addition and ![]() ![]() Permit status: Permit finaled | Current use: Commercial | Permit id: 16043-10000-052 | |||||
SCORE 59 Installing (2) type-i hoods and make-up air fan. ![]() ![]() Permit status: Permit finaled | Current use: Commercial | Permit id: 15044-10000-054 | |||||
SCORE 89 ![]() ![]() Permit status: Permit finaled | Current use: Commercial | Permit id: 15043-10000-013 | |||||
SCORE 81 ![]() ![]() Permit status: Permit closed | Current use: Commercial | Permit id: 16041-10000-362 | |||||
SCORE 91 Supplemental permit to revise methane plans and change of methane miti ![]() ![]() Permit status: Permit finaled | Current use: Commercial | Permit id: 13010-10006-013 | |||||
SCORE 98 Supplemental to 13010-10000-01379 to review destination oriented eleva ![]() ![]() Permit status: Permit finaled | Current use: Commercial | Permit id: 13010-10009-013 | |||||
SCORE 96 ![]() ![]() Permit status: Issued | Current use: Commercial | Permit id: 17042-90000-167 | |||||
SCORE 64 Supplemental permit for the deffered submittal of 3-sets of metal stai ![]() ![]() Permit status: Permit finaled | Current use: Commercial | Permit id: 13010-10008-013 | |||||
SCORE 96 Supplemental-16016-10000-31161 to revise structural detail and remove ![]() ![]() Permit status: Permit finaled | Current use: Commercial | Permit id: 16016-10001-311 | |||||
SCORE 93 Ti for 4th floor of office building. Addition of fan coil units, outsi ![]() ![]() Permit status: Permit finaled | Current use: Commercial | Permit id: 16044-30000-140 | |||||
SCORE 96 Installation of mechanical equipment support and anchorage on rooftop. Permit status: Permit finaled | Current use: Commercial | Permit id: 16016-10000-311 | |||||
SCORE 100 Ti on the 4th floor with flex heads in corridor and elevator lobby. ![]() ![]() Permit status: Permit finaled | Current use: Commercial | Permit id: 17043-10000-008 | |||||
SCORE 96 ![]() ![]() Permit status: Permit closed | Current use: Commercial | Permit id: 14042-10000-017 | |||||
SCORE 64 Proposed 853-0" long with max. 20-0" height temporary shoring with Permit status: Permit finaled | Current use: Commercial | Permit id: 13020-10000-006 | |||||
SCORE 56 ![]() ![]() Permit status: Permit finaled | Current use: Commercial | Permit id: 16041-20000-377 | |||||
SCORE 96 Supplemental to 13010-10000-01379 to check the drawing for p. T. Slab f ![]() ![]() Permit status: Permit finaled | Current use: Commercial | Permit id: 13010-10004-013 | |||||
SCORE 94 ![]() ![]() Permit status: Permit finaled | Current use: Commercial | Permit id: 14042-10001-097 | |||||
SCORE 95 ![]() ![]() Permit status: Permit closed | Current use: Commercial | Permit id: 14041-10000-108 | |||||
SCORE 97 Installation of 3 gen2 elevators within a 4 story office building. Tw ![]() ![]() Permit status: Permit finaled | Current use: Commercial | Permit id: 14046-10000-017 | |||||
SCORE 64 New 4-story office building with commissary space located on the first Permit status: Cofo issued | Current use: Commercial | Permit id: 13010-10000-013 | |||||
SCORE 93 ![]() ![]() Permit status: Permit finaled | Current use: Commercial | Permit id: 17041-10000-034 | |||||
SCORE 56 ![]() ![]() Permit status: Issued | Current use: Commercial | Permit id: 17041-10000-355 | |||||
SCORE 100 New fire alarm system for commercial building. 201 devices and 1 panel ![]() ![]() Permit status: Permit finaled | Current use: Commercial | Permit id: 14041-10000-126 | |||||
SCORE 88 ![]() ![]() Permit status: Permit finaled | Current use: Commercial | Permit id: 15042-10000-176 | |||||
SCORE 86 ![]() ![]() Permit status: Permit finaled | Current use: Commercial | Permit id: 15041-90000-130 | |||||
SCORE 96 Methane level 2. De-watering is not required. ![]() ![]() Permit status: Permit finaled | Current use: Commercial | Permit id: 14042-10000-095 | |||||
SCORE 70 Supplemental permit to 16016-10000-20753 to install new raised platfor Permit status: Permit finaled | Current use: Commercial | Permit id: 16016-10001-207 | |||||
SCORE 88 Deferred submittal of light gage metal stud framing for building permi ![]() ![]() Permit status: Permit finaled | Current use: Commercial | Permit id: 13010-10007-013 | |||||
SCORE 96 ![]() ![]() Permit status: Permit finaled | Current use: Commercial | Permit id: 15044-90000-070 | |||||
SCORE 100 Deferred submittal- curtainwall for new office building. Ref. 13010-1 ![]() ![]() Permit status: Permit finaled | Current use: Commercial | Permit id: 13010-10005-013 | |||||
SCORE 77 ![]() ![]() Permit status: Permit finaled | Current use: Commercial | Permit id: 15041-10000-323 | |||||
SCORE 96 Cut existing slab on grade to provide a 21" maximum depression to incr Permit status: Permit finaled | Current use: Commercial | Permit id: 16016-10000-180 | |||||
SCORE 100 ![]() ![]() Permit status: Permit finaled | Current use: Commercial | Permit id: 15042-90000-179 | |||||
SCORE 70 Single floor t. I. New partitions, carpet, paint, ceiling, and hvac req Permit status: Permit finaled | Current use: Commercial | Permit id: 16016-10000-207 | |||||
SCORE 100 ![]() ![]() Permit status: Permit finaled | Current use: Commercial | Permit id: 15041-10000-293 | |||||
SCORE 100 Plan check for change of use from office to recording studio. Total ar ![]() ![]() Permit status: Permit finaled | Current use: Commercial | Permit id: 16041-30000-337 | |||||
SCORE 87 ![]() ![]() Permit status: Permit finaled | Current use: Commercial | Permit id: 16044-90000-088 | |||||
SCORE 100 Installation of standpipe and sprinkler system within a 4 story office ![]() ![]() Permit status: Permit finaled | Current use: Commercial | Permit id: 14043-10000-016 | |||||
SCORE 82 Ti on the 4th floor with flex heads, adding 165 sprinkler heads. ![]() ![]() Permit status: Permit finaled | Current use: Commercial | Permit id: 16043-10000-055 | |||||
SCORE 100 ![]() ![]() Permit status: Permit closed | Current use: Special equipment | Permit id: 14041-90000-101 | |||||
SCORE 96 New building, core & shell office ,4 stories building, 9055 sf, pc is ![]() ![]() Permit status: Permit finaled | Current use: Commercial | Permit id: 13041-10000-213 | |||||
SCORE 100 ![]() ![]() Permit status: Permit finaled | Current use: Commercial | Permit id: 17044-10000-001 | |||||
SCORE 64 Plan check for power and title 24. Change of use from commisary space ![]() ![]() Permit status: Issued | Current use: Commercial | Permit id: 17041-10000-181 | |||||
SCORE 81 Plancheck for temporary power only for 3 buildings. East building: 95 ![]() ![]() Permit status: Permit closed | Current use: Commercial | Permit id: 14041-10000-052 | |||||
SCORE 93 ![]() ![]() Permit status: Permit finaled | Current use: Commercial | Permit id: 15042-10000-182 | |||||
SCORE 74 Complete plumbing for new (east) building shell and core- office. 4 st ![]() ![]() Permit status: Permit finaled | Current use: Commercial | Permit id: 13042-10000-154 | |||||
SCORE 96 ![]() ![]() Permit status: Permit finaled | Current use: Commercial | Permit id: 16042-90000-236 | |||||
SCORE 74 Shell and core for a 4 story office building. Building bldg 1 of 2. ![]() ![]() Permit status: Issued | Current use: Commercial | Permit id: 13044-10000-082 | |||||
SCORE 91 ![]() ![]() Permit status: Permit finaled | Current use: Commercial | Permit id: 16041-90000-270 | |||||
SCORE 100 Full plan check for a 1st time tenant t. I; scope include new lighting ![]() ![]() Permit status: Permit finaled | Current use: Commercial | Permit id: 16041-10000-341 | |||||
SCORE 64 Site preparation & excavation & removal & recompaction & site drainag Permit status: Permit finaled | Current use: Commercial | Permit id: 13030-10000-015 | |||||
SCORE 86 ![]() ![]() Permit status: Permit finaled | Current use: Commercial | Permit id: 16041-10000-422 | |||||
SCORE 64 Potable water, waste-vent, and gas systems for a restaurant. Connectio ![]() ![]() Permit status: Issued | Current use: Commercial | Permit id: 17042-10000-123 | |||||
SCORE 65 Installation of (7) simplex sump pump systems for bioswale overflow an ![]() ![]() Permit status: Permit finaled | Current use: Commercial | Permit id: 15042-10000-152 | |||||
SCORE 64 Change of use from food commisary space to restaurant on the first flo Permit status: Issued | Current use: Commercial | Permit id: 17016-10000-141 | |||||
SCORE 87 ![]() ![]() Permit status: Permit finaled | Current use: Commercial | Permit id: 17044-90000-009 |