Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 Electrical permit only to switch panel, replace outlets, add gfi outlets in kitchen and replace light fixture in basement unit. Date: July 20, 2009 Contractor: Betterway Electric Inc Client: Family Pine | Applicant: Better-Way Electric Inc | Permit type: Electrical | Permit status: Cmp | Completion date: November 24, 2009 | Current use: Multifamily dwe | |||||
SCORE 100 Plumbing work related to swo issued -- cpl2009-01247 & cpl2009-01264. Repair of kitchen plumbing and drain piping in downstairs utility room. Mechanical, electrical & framing working to done under separate permit(s). Date: July 30, 2009 Contractor: Barday Plumbing And Heating Client: Family Pine | Applicant: Barday Plumbing & Heating | Permit type: Plumbing | Permit status: Cmp | Completion date: August 3, 2009 | Current use: Multifamily dwe | |||||
SCORE 95 Electrical permit only to switch panel, replace outlets, add gfi outlets in kitchen and replace light fixture in basement unit. Client: Family Pine | Permit type: Electrical | Permit status: Cmp | Completion date: November 24, 2009 | Current use: Multifamily dwellings, existing | Permit id: Pmt2009-02773 | |||||
SCORE 100 Plumbing work related to swo issued -- cpl2009-01247 & cpl2009-01264. Repair of kitchen plumbing and drain piping in downstairs utility room. Mechanical, electrical & framing working to done under separate permit(s). Client: Family Pine | Permit type: Plumbing | Permit status: Cmp | Completion date: August 3, 2009 | Current use: Multifamily dwellings, existing | Permit id: Pmt2009-02966 | |||||
SCORE 100 Total tear-off & reroof of attached multi-family dwellings, 24 squares of asphalt shingles on a pitch represented as 3 12. All roof materials shall be installed per manufacturerfoots specs. Mid-roof inspection required if pitch is less than 4 12. Permit type: Roofing | Permit status: Iss | Current use: Multifamily dwellings, existing | Permit id: Pmt2017-01497 |