Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 59 Renovation of a 7 unit apartment (2 bldgs) into a 4 unit apartment as per plan. Each building will contain 2 units. See vcc sub-permit 15-15645 Permit type: Renovation (structural) | Permit status: Permit issued | Expiration date: March 23, 2016 | Current use: Multi-family | Permit id: 15-25212-Rnvs | |||||
SCORE 89 Remove existing, expanded metal mesh gate on dauphine side of property install new 1"x6" beaded pine gate per vcc detail, sheet #17, gate no. 1 Permit type: Renovation (non-structural) | Permit status: Plan review | Current use: Half of a party wall double | Permit id: 15-04960-Rnvn | |||||
Temporary power Date: July 23, 2015 Permit type: Construction loop | Permit status: Certificate of completion | Completion date: August 3, 2015 | Expiration date: January 30, 2016 | Current use: Half of a party wall double | Permit id: 15-22178-Loop | |||||
Install (2) 4" pvc conduits for emergency per sketch. Date: January 4, 2016 Permit type: Street cut | Permit status: Inspections finaled | Completion date: March 3, 2016 | Expiration date: August 22, 2016 | Current use: Multi-family | Permit id: 16-00126-Rstc | |||||
To renovate building as per plans submitted 07/24/15, approved be the architectural committee 08/11/15, and stamped vcc approved 08/26/15. Work includes but is not limited to:main building removal of the existing synthetic slate roofing from the main building installation of new slate select roofing on main building. Color to be grey. Installation of two (2) new 6 over 6 single hung true divided light wood windows on the st. Ann elevation installation of two (2) new sets of 3 light over single panel french doors on the st. Ann elevationservice building construction of two (2) new dormers on the orleans roof slope of the service building installation of prefinished metal coping on parapets removal of existing and construction of new exterior stairsnote: all painting to be permitted separatelytrash chutes are required for removal of debris from all roofs all work must conform to standard vcc policies & guidelinestorch-applied roofing is not permitted in the vieux carr. Date: May 28, 2015 Permit type: Vcc general work | Permit status: Permit issued | Expiration date: February 27, 2016 | Current use: Multi-family | Permit id: 15-15645-Vcgen | |||||
SCORE 65 Interior demolition to a vacant building, no use or occupancy. Renovation plans to follow. Permit type: Interior demolition | Permit status: Permit issued | Expiration date: November 21, 2015 | Current use: Half of a party wall double | Permit id: 15-15452-Demi | |||||
Complete rewire Date: November 23, 2015 Permit type: Electrical repair / replacement / addition | Permit status: Permit issued | Expiration date: May 24, 2016 | Current use: Half of a party wall double | Permit id: 15-35395-Erpr | |||||
To remove existing gate and gate surround and install new gate and gate surround, in conjunction with a similar proposal at 923-25 orleans, per drawings submitted 08/05/14. Date: August 5, 2014 Permit type: Vcc general work | Permit status: Permit expired due to ina | Completion date: February 20, 2015 | Current use: Half of a party wall double | Permit id: 14-25427-Vcgen | |||||
SCORE 93 Renovation of a 7 unit apartment (2 bldgs) into a 4 unit apartment as per plans Permit type: Renovation (structural) | Permit status: Voided - duplicate permit | Completion date: September 15, 2015 | Current use: Multi-family | Permit id: 15-15645-Rnvs | |||||
Remove existing, expanded metal mesh gate on dauphine side of propertyinstall new 1"x6" beaded pine gate per vcc detail, sheet #17, gate no. 1 Date: February 19, 2015 Permit type: Vcc general work | Permit status: Permit issued | Expiration date: August 25, 2015 | Current use: Half of a party wall double | Permit id: 15-04960-Vcgen | |||||
Complete rewire Date: November 23, 2015 Permit type: Electrical repair / replacement / addition | Permit status: Application submitted | Current use: Half of a party wall double | Permit id: 15-35349-Erpr | |||||
SCORE 96 Gas line tankless wh clem738-3587 ck3965released Date: April 28, 2016 Contractor: Clem Heustis Iii Permit type: Mechanical fuel gas | Permit status: Certificate of completion | Completion date: January 6, 2017 | Expiration date: October 28, 2016 | Current use: Half of a party wall double | Permit id: 16-14078-Fgas | |||||
SCORE 59 Renovation of a 7 unit apartment (2 bldgs) into a 4 unit apartment as per plan. Each building will contain 2 units. See vcc sub-permit 15-15645. Front bldg ----- 927 orleans ave, 929 orleans averear bldg ----- 931 a orleans ave, 931 b orleans avehouse meter --- 927 orleans ave Permit type: Renovation (structural) | Permit status: Inspections finaled | Completion date: January 12, 2017 | Expiration date: March 23, 2016 | Current use: Multi-family | Permit id: 15-25212-Rnvs | |||||
927 orleans house- add929 orleans apt 1- change to 929 orleans929 orleans apt 2- change to 931 orleans a929 orleans apt3- change to 931 orleans b929 orleans apt 4- remove929 orleans apt 5- remove929 orleans apt 6- remove929 orleans apt 7- remove927 orleans- keep Date: December 29, 2016 Permit type: Change of address | Permit status: Permit issued | Expiration date: June 29, 2017 | Current use: Half of a party wall double | Permit id: 16-42047-Ecoa | |||||
To renovate building as per plans submitted 07 24 15, approved be the architectural committee 08 11 15, and stamped vcc approved 08 26 15. Work includes but is not limited to:main building removal of the existing synthetic slate roofing from the main building installation of new slate select roofing on main building. Color to be grey. Installation of two (2) new 6 over 6 single hung true divided light wood windows on the st. Ann elevation installation of two (2) new sets of 3 light over single panel french doors on the st. Ann elevationservice building construction of two (2) new dormers on the orleans roof slope of the service building installation of prefinished metal coping on parapets removal of existing and construction of new exterior stairsnote: all painting to be permitted separatelytrash chutes are required for removal of debris from all roofs all work must conform to standard vcc policies & guidelinestorch-applied roofing is not permitted in the vieux carr. Date: May 28, 2015 Permit type: Vcc general work | Permit status: Permit issued | Expiration date: February 27, 2016 | Current use: Multi-family | Permit id: 15-15645-Vcgen | |||||
To remove existing gate and gate surround and install new gate and gate surround, in conjunction with a similar proposal at 923-25 orleans, per drawings submitted 08 05 14. Date: August 5, 2014 Permit type: Vcc general work | Permit status: Permit expired due to ina | Completion date: February 20, 2015 | Current use: Half of a party wall double | Permit id: 14-25427-Vcgen | |||||
SCORE 82 Install 2 elect air handler and 2 a/cpaul deveer (#5153) 504-931-985115-25212-rnvs Date: February 19, 2016 Contractor: Paul Deveer Permit type: Mechanical hvac | Permit status: Certificate of completion | Completion date: December 27, 2016 | Expiration date: August 19, 2016 | Current use: Multi-family | Permit id: 16-05464-Hvac |