Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 86 The scope of work is limited to upgrade of the existing main service panel. No new sub-panels or relocation permitted. Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: July 30, 2014 Contractor: Cody Oram Permit type: Electrical : 8002 - | Permit status: Permit finaled | Completion date: October 28, 2014 | Permit id: Pds2014-Resalt- | |||||
SCORE 100 Replace approx sewer line under home Date: January 8, 2016 Permit type: Residential alteration-addn | Permit status: Completed | Completion date: January 14, 2016 | Permit id: Pds2016-Resalt- | |||||
SCORE 95 Roof mount residential solar pv for existing sfd with existing residential main electrical service upgrade - 225a - the scope of work is limited to upgrade of the existing main service panel. No new sub-panels or relocation permitted. Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: June 19, 2014 Contractor: Vivint Solar Developer Llc Permit type: Residential alteration-addn | Permit status: Completed | Completion date: September 11, 2014 | Permit id: Pds2014-Resalt- | |||||
SCORE 87 25 sf re-roof for (e) sfd if a re-roof project is proposed, the following specifications apply. Existing roofing material shingles proposed roofing material shingles manufacturer gaf brand and model tmiberline hd reflector series color (if cool roof required) birchwood built-up roofing assembly system number per attached listing report (if applicable) n a specific exemption from cool roof requirements (if applicable) n a required building inspector field verification (if applicable) note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Permit type: Addn | Permit status: Completed | Completion date: March 23, 2017 | Permit id: Pds2017-Resalt- | |||||
Underground plumbing Date: January 12, 2016 Permit status: Pass | Permit id: Pds2016-Resalt- | |||||
Foundation/steel/holdowns/abs/2nd Date: September 6, 2005 Permit status: Pass | Permit id: Pds2005-1004-20 | |||||
Final Date: March 21, 2017 Permit status: Pass | Permit id: Pds2017-Resalt- | |||||
Final Date: October 27, 2014 Permit status: Pass | Permit id: Pds2014-Resalt- | |||||
Final Date: December 5, 2007 Permit status: Pass | Permit id: Pds2005-1004-20 | |||||
Lath/drywall - interior Date: September 21, 2006 Permit status: Pass | Permit id: Pds2005-1004-20 |