Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
100a meter replacement at existing location for existing sfd. Date: December 1, 2014 Permit type: Electrical : 80 - ac | Permit status: Permit finaled | Completion date: December 12, 2014 | Permit id: Pds2014-Resalt- | |||||
Misc electrical to upgrade from 1 amps to 2 amps for existing sfd Date: October 28, 2011 Permit type: Electrical : 80 - ac | Permit status: Permit finaled | Completion date: November 3, 2011 | Permit id: Pds2011-1007-20 | |||||
SCORE 89 Roof mount residential solar pv for existing sfd per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: August 3, 2015 Contractor: Smart Energy Solar Inc Permit type: Residential alteration-addn | Permit status: Completed | Completion date: September 28, 2015 | Permit id: Pds2015-Resalt- | |||||
SCORE 94 100a meter replacement at existing location for existing sfd. Date: December 1, 2014 Contractor: Carter Electric Inc Permit type: Residential alteration-addn | Permit status: Completed | Completion date: December 12, 2014 | Permit id: Pds2014-Resalt- | |||||
SCORE 91 Misc electrical to upgrade from 1 amps to 2 amps for existing sfd Date: October 28, 2011 Contractor: Tre Co Permit type: Residential alteration-addn | Permit status: Completed | Completion date: November 3, 2011 | Permit id: Pds2011-1007-20 | |||||
Final Date: September 25, 2015 Permit status: Pass | Permit id: Pds2015-Resalt- | |||||
Final Date: December 12, 2014 Permit status: Pass | Permit id: Pds2014-Resalt- | |||||
Final Date: November 1, 2011 Permit status: Pass | Permit id: Pds2011-1007-20 | |||||
Final Date: December 5, 2007 Permit status: Pass | Permit id: Pds2006-1006-20 | |||||
Foundation/steel/holdowns/abs/2nd Date: December 21, 2006 Permit status: Pass | Permit id: Pds2006-1006-20 |