Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Roof mount residential solar pv for existing sfd with existing residential main electrical service upgrade - 225a - 10/13/2015 plan change see cofa.. T. T. The scope of work is limited to upgrade of the existing main service panel. No new sub-panels or relocation permitted. Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: September 28, 2015 Permit type: Residential alteration-addn | Permit status: Completed | Completion date: October 28, 2015 | Permit id: Pds2015-Resalt- | |||||
SCORE 86 Roof mount residential solar pv for existing sfd with existing residential main electrical service upgrade - 225a - 10 13 2015 plan change see cofa.. T. T. The scope of work is limited to upgrade of the existing main service panel. No new sub-panels or relocation permitted. Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: September 28, 2015 Contractor: Suncrest Solar Inc Permit type: Residential alteration-addn | Permit status: Completed | Completion date: October 28, 2015 | Permit id: Pds2015-Resalt- | |||||
Final Date: October 27, 2015 Permit status: Pass | Permit id: Pds2015-Resalt- |