Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Redmond senior housing bldg: mixed use 75 unit affordable senior housing structure using ibc 5 special provisions. Structure includes a 1-story 31/2 sq ft type i-a construction podium building with a 3-hour lid creating a separate building/ and a 4-story 55/592 sq ft type v-a construction structure on top for a total of 5-stories and 86/792 sq ft. Type i-a building : 1-level underground 15/492 sq ft s-2 parking garage/ plus 1-story above grade non-separated uses of: 574 sq ft s-2 (carport); 11/355 b-occupancy and 2/0 sq ft a-3 occupancy/ plus separated use of: 1/739 sq ft r-2 occupancy. Type v-a building: 4-stories 54/776 sq ft separated use: r-2 occupancy and 816 sq ft uncovered decks. Construct a 1 sq ft trash enclosure. Total project construction: 86/982 sq ft. Date: November 3, 2015 Value: $10,186,720 Applicant: Valerie Thiel | Permit type: Mixed use | Permit id: Bldg-2015-04346 | Parcel: 225059243 | |||||
General purpose Date: December 14, 2015 Applicant: Tim Shea | Permit type: Hydrant use | Permit id: Hyd-2015-09335 | Parcel: 225059243 | |||||
Multi family - development of 75 units of affordable senior independent living housing in a 5-story building with 8/0 sq. Ft. Of commercial space on the ground floor. Date: August 30, 2016 Applicant: Timothy Zaricznyj | Permit type: Side sewer | Permit id: Swr-2016-05534 | Parcel: 225059243 | |||||
Multi family - development of 75 units of affordable senior independent living housing in a 5-story building with 8/0 sq. Ft. Of commercial space on the ground floor. Date: August 30, 2016 Applicant: Timothy Zaricznyj | Permit type: Water meter | Permit id: Wtr-2016-05533 | Parcel: 225059243 | |||||
Commercial meter - development of 75 units of affordable senior independent living housing in a 5-story building with 8/0 sq. Ft. Of commercial space on the ground floor. Date: August 30, 2016 Applicant: Timothy Zaricznyj | Permit type: Side sewer | Permit id: Swr-2016-05530 | Parcel: 225059243 | |||||
Commercial meter - development of 75 units of affordable senior independent living housing in a 5-story building with 8/0 sq. Ft. Of commercial space on the ground floor. Date: August 30, 2016 Applicant: Timothy Zaricznyj | Permit type: Water meter | Permit id: Wtr-2016-05529 | Parcel: 225059243 | |||||
Sopa - redmond senior housing bldg - 206-619-4144 - wire new 75 unit mixed use building customer paid for:(82) feeder/ (2) temporary service/ (1) service - new/ (1) ground ufer - per inspector visit Date: January 28, 2016 Value: $1,667,105 Applicant: Tim Thompson | Permit type: Electrical - otc | Permit id: Elec-2016-00655 | Parcel: 225059243 | |||||
Sopa - redmond senior housing bldg: 253-872-5665 - installation of (3) low voltage thermostats and associated wiring. Customer paid for:(3) low voltage Date: August 18, 2016 Value: $400 Applicant: Jennifer Sparrs | Permit type: Electrical - otc | Permit id: Elec-2016-07015 | Parcel: 225059243 | |||||
Ti redmond pace- scope of work includes the interior build-out of an existing unoccupied ground floor commercial space. Work includes construction of office/ exam rooms/ treatment rooms/ toilet rooms and dining room with warming kitchen. Area of work 7752 sq ft. Date: June 20, 2016 Value: $785,731 Applicant: Shirley Bekins | Permit type: Mixed use | Permit id: Bldg-2015-09177 | Parcel: 225059243 | |||||
Redmond senior housing bldg: installation of 1 dry system for the parking garage level and 1 combination standpipe with floor controls for the heated floors above. Total 852 sprinkler heads. 2 risers (1 dry 1 standpipe). Date: June 2, 2016 Applicant: Nicholas Scott | Permit type: Fire sprinkler - commercial | Permit id: Fire-2016-03514 | Parcel: 225059243 | |||||
Occupying northbound sidewalk of 160th avenue ne to install new 1 1/4-inch pe gas service to 8632 160th avenue ne. Date: March 15, 2016 Applicant: Aurelie Johannson | Permit type: Right of way | Permit id: Row-2016-00856 | Parcel: 225059243 | |||||
Sopa - redmond senior housing bldg: providence john gabriel house - 509-468-3204 - install of cctv/ cameras and access control customer paid for:(423) low voltage Date: August 29, 2016 Value: $100,000 Applicant: Jason Streeter | Permit type: Electrical - otc | Permit id: Elec-2016-07288 | Parcel: 225059243 | |||||
Redmond senior housing bldg: installation of additional street lighting and (1) pedestrian crosswalk in conjuncity with the providence john gabriel house. Customer paid for (1) feeder/ (1) new service. 253-722-2842 Date: July 15, 2016 Value: $118,066 Applicant: Todd Prentiss | Permit type: Electrical - otc | Permit id: Elec-2016-06128 | Parcel: 225059243 | |||||
Sopa - redmond senior housing bldg: entire bldg - 425-321-5343 - installation of emergency responder radio system. Customer paid for:(25) low voltage Date: September 9, 2016 Value: $74,200 Applicant: Dustin Duke | Permit type: Electrical - otc | Permit id: Elec-2016-07574 | Parcel: 225059243 | |||||
SCORE 61 Site construction water/ garden hose Date: February 17, 2016 Contractor: Tim Shea Applicant: Tim Shea | Permit type: Hydrant use | Permit id: Hyd-2016-01072 | Parcel: 225059243 | |||||
Sopa - redmond pace - 1st floor north - 509-220-8202 - 9/1 sqf ti customer paid for:(2) feeder. New complete wiring for shell space. Date: November 16, 2016 Value: $228,101 Applicant: Tim Thompson | Permit type: Electrical - otc | Permit id: Elec-2016-08153 | Parcel: 225059243 | |||||
Redmond senior housing bldg: install voice and fire alarm system per nfpa 72 requirements. Total 185 devices. Transmitter and control panel. Date: May 17, 2016 Applicant: Jason Streeter | Permit type: Fire alarm | Permit id: Fire-2016-03329 | Parcel: 225059243 | |||||
Ti redmond pace- modification of existing system to accomodate new walls and ceilings. 88 heads. Date: July 1, 2016 Value: $785,731 Applicant: Nicholas Scott | Permit type: Fire sprinkler - commercial | Permit id: Fire-2016-04955 | Parcel: 225059243 | |||||
Redmond pace - install voice and fire alarm system for ti in ground floor commercial space. Total 53 devices. Date: August 19, 2016 Applicant: Mike Patterson | Permit type: Fire alarm | Permit id: Fire-2016-06756 | Parcel: 225059243 | |||||
Redmond senior housing bldg: emergency responder radio system Date: October 13, 2016 Value: $10,186,720 Applicant: William Blais | Permit type: Fire installation | Permit id: Fire-2016-08003 | Parcel: 225059243 | |||||
Redmond senior housing bldg: installation of 6 backflow preventer & vacuum breakers/ 24 clothes washers/ 74 dishwashers/ 1 drinking fountain/ 6 floor drains/ 5 hose bibs/ roof drains/ 2 sewage ejectors/ 74 shower/valve replacements/ 78 bathroom sinks/ 7 floor/mop sinks/ 75 kitchen sinks/ 1 utility & laundry tray/ 76 toilets/ 1 water service. Total of 4 fixtures Date: February 1, 2016 Value: $800,000 Applicant: Timothy Zaricznyj | Permit type: Plumbing plan review | Permit id: Plum-2016-00246 | Parcel: 225059243 | |||||
Vault- providence redmond senior housing- new construction of two bottomless infiltration vaults to provide infiltration of approximate 13/718 sq ft of roof drainage from a new 75 unit affordable senior housing project. North vault 214in by 114in. South vault 174in by 810in. Date: April 5, 2016 Value: $45,000 Permit type: Stormwater vault | Permit id: Bldg-2016-01863 | Parcel: 225059243 | |||||
Redmond senior housing bldg: scope of work entails the installation of two gas-fired/ condensing water heaters to support a new mixed use 5-story building with 4 levels of residential units and a main level with retail/office and additional residential units. Date: February 1, 2016 Value: $65,000 Applicant: Jeff Drudge | Permit type: Mechanical plan review | Permit id: Mech-2016-00254 | Parcel: 225059243 | |||||
Park in right-of-way to avoid blocking neighboring driveway to install 3-phase multi-family underground line extension. All trenching is on private property. Date: February 12, 2016 Permit type: Right of way | Permit id: Row-2016-00646 | Parcel: 225059243 | |||||
Redmond senior housing bldg: garage/ trash rooms/ housekeeping rooms/ corridor ventilation/ common area ventilation and hvac. Elevator relief/ elevator control hvac. Residential venting design (installation & coordination by others) one air handler/ six fan coil units/ three heat pumps/ two package hvac units/ six vent fans. Total of 18 fixtures. Date: March 11, 2016 Value: $200,000 Applicant: Amanda Moore | Permit type: Mechanical plan review | Permit id: Mech-2016-00493 | Parcel: 225059243 | |||||
Redmond senior housing - pace ti - 1st floor - heating/cooling and ventilation for new ti. Includes toilet room exhaust and it closet cooling. Existing louvers to be utilized for osa and exhaust. Installation includes (2) air handlers/ (2) heat pumps and (7) fan coil units. Date: March 28, 2016 Value: $120,000 Applicant: Amanda Moore | Permit type: Mechanical plan review | Permit id: Mech-2016-01819 | Parcel: 225059243 | |||||
Otc redmond senior housing bldg- install of duct work only for bath fans/ laundry fans/ dryer vents/ range hood vents/ and a/c port. Date: October 10, 2016 Value: $52,560 Applicant: Bj Graham | Permit type: Mechanical - otc | Permit id: Mech-2016-08460 | Parcel: 225059243 | |||||
SCORE 72 Redmond senior housing bldg: mixed use 75 unit affordable senior housing structure using ibc 5 special provisions. Structure includes a 1-story 31 2 sq ft type i-a construction podium building with a 3-hour lid creating a separate building and a 4-story 55 592 sq ft type v-a construction structure on top for a total of 5-stories and 86 792 sq ft. Type i-a building : 1-level underground 15 492 sq ft s-2 parking garage plus 1-story above grade non-separated uses of: 574 sq ft s-2 (carport); 11 355 b-occupancy and 2 0 sq ft a-3 occupancy plus separated use of: 1 739 sq ft r-2 occupancy. Type v-a building: 4-stories 54 776 sq ft separated use: r-2 occupancy and 816 sq ft uncovered decks. Construct a 1 sq ft trash enclosure. Total project construction: 86 982 sq ft. Applicant: Valerie Thiel | Permit type: Mixed use | Permit id: Bldg-2015-04346 | Parcel: 225059243 | |||||
SCORE 98 Sopa - redmond senior housing bldg - 206-619-4144 - wire new 75 unit mixed use building customer paid for:(82) feeder (2) temporary service (1) service - new (1) ground ufer - per inspector visit Applicant: Tim Thompson | Permit type: Electrical - otc | Permit id: Elec-2016-00655 | Parcel: 225059243 | |||||
SCORE 72 Vault- providence redmond senior housing- new construction of two bottomless infiltration vaults to provide infiltration of approximate 13 718 sq ft of roof drainage from a new 75 unit affordable senior housing project. North vault 214in by 114in. South vault 174in by 810in. Permit type: Stormwater vault | Permit id: Bldg-2016-01863 | Parcel: 225059243 | |||||
SCORE 72 Ti redmond pace- scope of work includes the interior build-out of an existing unoccupied ground floor commercial space. Work includes construction of office exam rooms treatment rooms toilet rooms and dining room with warming kitchen. Area of work 7752 sq ft. Applicant: Shirley Bekins | Permit type: Mixed use | Permit id: Bldg-2015-09177 | Parcel: 225059243 | |||||
SCORE 99 Redmond senior housing bldg: installation of additional street lighting and (1) pedestrian crosswalk in conjuncity with the providence john gabriel house. Customer paid for (1) feeder (1) new service. 253-722-2842 Applicant: Todd Prentiss | Permit type: Electrical - otc | Permit id: Elec-2016-06128 | Parcel: 225059243 | |||||
SCORE 80 Sopa - redmond senior housing bldg: providence john gabriel house - 509-468-3204 - install of cctv cameras and access control customer paid for:(423) low voltage Applicant: Jason Streeter | Permit type: Electrical - otc | Permit id: Elec-2016-07288 | Parcel: 225059243 | |||||
SCORE 100 Sopa - redmond senior housing bldg: 253-872-5665 - installation of (3) low voltage thermostats and associated wiring. Customer paid for:(3) low voltage Applicant: Jennifer Sparrs | Permit type: Electrical - otc | Permit id: Elec-2016-07015 | Parcel: 225059243 | |||||
SCORE 91 Sopa - redmond senior housing bldg: entire bldg - 425-321-5343 - installation of emergency responder radio system. Customer paid for:(25) low voltage Applicant: Dustin Duke | Permit type: Electrical - otc | Permit id: Elec-2016-07574 | Parcel: 225059243 | |||||
SCORE 98 Sopa - redmond pace - 1st floor north - 509-220-8202 - 9 1 sqf ti customer paid for:(2) feeder. New complete wiring for shell space. Applicant: Tim Thompson | Permit type: Electrical - otc | Permit id: Elec-2016-08153 | Parcel: 225059243 | |||||
SCORE 80 Redmond senior housing bldg: install voice and fire alarm system per nfpa 72 requirements. Total 185 devices. Transmitter and control panel. Date: May 17, 2016 Contractor: Fire Power Inc Applicant: Jason Streeter | Permit type: Fire alarm | Permit id: Fire-2016-03329 | Parcel: 225059243 | |||||
SCORE 100 Redmond senior housing bldg: installation of 1 dry system for the parking garage level and 1 combination standpipe with floor controls for the heated floors above. Total 852 sprinkler heads. 2 risers (1 dry 1 standpipe). Date: June 2, 2016 Contractor: Smith Fire Systems Inc Applicant: Nicholas Scott | Permit type: Fire sprinkler - commercial | Permit id: Fire-2016-03514 | Parcel: 225059243 | |||||
SCORE 100 Ti redmond pace- modification of existing system to accomodate new walls and ceilings. 88 heads. Applicant: Nicholas Scott | Permit type: Fire sprinkler - commercial | Permit id: Fire-2016-04955 | Parcel: 225059243 | |||||
SCORE 80 Redmond pace - install voice and fire alarm system for ti in ground floor commercial space. Total 53 devices. Date: August 19, 2016 Contractor: Fire Power Inc Applicant: Mike Patterson | Permit type: Fire alarm | Permit id: Fire-2016-06756 | Parcel: 225059243 | |||||
SCORE 98 Redmond senior housing bldg: emergency responder radio system Applicant: William Blais | Permit type: Fire installation | Permit id: Fire-2016-08003 | Parcel: 225059243 | |||||
SCORE 72 Redmond senior housing bldg: scope of work entails the installation of two gas-fired condensing water heaters to support a new mixed use 5-story building with 4 levels of residential units and a main level with retail office and additional residential units. Applicant: Jeff Drudge | Permit type: Mechanical plan review | Permit id: Mech-2016-00254 | Parcel: 225059243 | |||||
SCORE 72 Redmond senior housing bldg: installation of 6 backflow preventer & vacuum breakers 24 clothes washers 74 dishwashers 1 drinking fountain 6 floor drains 5 hose bibs roof drains 2 sewage ejectors 74 shower valve replacements 78 bathroom sinks 7 floor mop sinks 75 kitchen sinks 1 utility & laundry tray 76 toilets 1 water service. Total of 4 fixtures Applicant: Timothy Zaricznyj | Permit type: Plumbing plan review | Permit id: Plum-2016-00246 | Parcel: 225059243 | |||||
SCORE 97 Site construction water garden hose Date: February 17, 2016 Contractor: Walsh Construction Co Applicant: Tim Shea | Permit type: Hydrant use | Permit id: Hyd-2016-01072 | Parcel: 225059243 | |||||
Occupying northbound sidewalk of 160th avenue ne to install new 1 1 4-inch pe gas service to 8632 160th avenue ne. Date: March 15, 2016 Applicant: Aurelie Johannson | Permit type: Right of way | Permit id: Row-2016-00856 | Parcel: 225059243 | |||||
SCORE 100 Redmond senior housing bldg: garage trash rooms housekeeping rooms corridor ventilation common area ventilation and hvac. Elevator relief elevator control hvac. Residential venting design (installation & coordination by others) one air handler six fan coil units three heat pumps two package hvac units six vent fans. Total of 18 fixtures. Applicant: Amanda Moore | Permit type: Mechanical plan review | Permit id: Mech-2016-00493 | Parcel: 225059243 | |||||
SCORE 100 Redmond senior housing - pace ti - 1st floor - heating cooling and ventilation for new ti. Includes toilet room exhaust and it closet cooling. Existing louvers to be utilized for osa and exhaust. Installation includes (2) air handlers (2) heat pumps and (7) fan coil units. Applicant: Amanda Moore | Permit type: Mechanical plan review | Permit id: Mech-2016-01819 | Parcel: 225059243 | |||||
Commercial meter - development of 75 units of affordable senior independent living housing in a 5-story building with 8 0 sq. Ft. Of commercial space on the ground floor. Date: August 30, 2016 Applicant: Timothy Zaricznyj | Permit type: Water meter | Permit id: Wtr-2016-05529 | Parcel: 225059243 | |||||
Multi family - development of 75 units of affordable senior independent living housing in a 5-story building with 8 0 sq. Ft. Of commercial space on the ground floor. Date: August 30, 2016 Applicant: Timothy Zaricznyj | Permit type: Water meter | Permit id: Wtr-2016-05533 | Parcel: 225059243 | |||||
SCORE 82 Multi family - development of 75 units of affordable senior independent living housing in a 5-story building with 8 0 sq. Ft. Of commercial space on the ground floor. Date: August 30, 2016 Contractor: Santana Trucking Applicant: Timothy Zaricznyj | Permit type: Side sewer | Permit id: Swr-2016-05534 | Parcel: 225059243 | |||||
SCORE 82 Commercial meter - development of 75 units of affordable senior independent living housing in a 5-story building with 8 0 sq. Ft. Of commercial space on the ground floor. Date: August 30, 2016 Contractor: Santana Trucking Applicant: Timothy Zaricznyj | Permit type: Side sewer | Permit id: Swr-2016-05530 | Parcel: 225059243 | |||||
SCORE 98 Otc redmond senior housing bldg- install of duct work only for bath fans laundry fans dryer vents range hood vents and a c port. Applicant: Bj Graham | Permit type: Mechanical - otc | Permit id: Mech-2016-08460 | Parcel: 225059243 | |||||
Pull one 36-count fiber 463 feet through existing comcast conduit replace pedestal with node pedestal pull fiber through. Date: December 12, 2016 Applicant: Owen Shackett | Permit type: Right of way | Permit id: Row-2016-09553 | Parcel: 225059243 | |||||
SCORE 72 Redmond senior housing bldg: mixed use 75 unit affordable senior housing structure using ibc 5 special provisions. Structure includes a 1-story 31 2 sq ft type i-a construction podium building with a 3-hour lid creating a separate building and a 4-story 55 592 sq ft type v-a construction structure on top for a total of 5-stories and 86 792 sq ft. Type i-a building : 1-level underground 15 492 sq ft s-2 parking garage plus 1-story above grade non-separated uses of: 574 sq ft s-2 (carport); 11 355 b-occupancy and 2 0 sq ft a-3 occupancy plus separated use of: 1 739 sq ft r-2 occupancy. Type v-a building: 4-stories 54 776 sq ft separated use: r-2 occupancy and 816 sq ft uncovered decks. Construct a 1 sq ft trash enclosure. Total project construction: 86 982 sq ft. Applicant: Valerie Thiel | Permit type: Mixed use | Permit id: Bldg-2015-04346 | |||||
SCORE 98 Sopa - redmond senior housing bldg - 206-619-4144 - wire new 75 unit mixed use building customer paid for:(82) feeder (2) temporary service (1) service - new (1) ground ufer - per inspector visit Applicant: Tim Thompson | Permit type: Electrical - otc | Permit id: Elec-2016-00655 | |||||
SCORE 72 Redmond senior housing bldg: scope of work entails the installation of two gas-fired condensing water heaters to support a new mixed use 5-story building with 4 levels of residential units and a main level with retail office and additional residential units. Applicant: Jeff Drudge | Permit type: Mechanical plan review | Permit id: Mech-2016-00254 | |||||
SCORE 72 Redmond senior housing bldg: installation of 6 backflow preventer & vacuum breakers 24 clothes washers 74 dishwashers 1 drinking fountain 6 floor drains 5 hose bibs roof drains 2 sewage ejectors 74 shower valve replacements 78 bathroom sinks 7 floor mop sinks 75 kitchen sinks 1 utility & laundry tray 76 toilets 1 water service. Total of 4 fixtures Applicant: Timothy Zaricznyj | Permit type: Plumbing plan review | Permit id: Plum-2016-00246 | |||||
SCORE 97 Site construction water garden hose Date: February 17, 2016 Contractor: Walsh Construction Co Applicant: Tim Shea | Permit type: Hydrant use | Permit id: Hyd-2016-01072 | |||||
SCORE 100 Redmond senior housing bldg: garage trash rooms housekeeping rooms corridor ventilation common area ventilation and hvac. Elevator relief elevator control hvac. Residential venting design (installation & coordination by others) one air handler six fan coil units three heat pumps two package hvac units six vent fans. Total of 18 fixtures. Applicant: Amanda Moore | Permit type: Mechanical plan review | Permit id: Mech-2016-00493 | |||||
SCORE 100 Redmond senior housing - pace ti - 1st floor - heating cooling and ventilation for new ti. Includes toilet room exhaust and it closet cooling. Existing louvers to be utilized for osa and exhaust. Installation includes (2) air handlers (2) heat pumps and (7) fan coil units. Applicant: Amanda Moore | Permit type: Mechanical plan review | Permit id: Mech-2016-01819 | |||||
SCORE 72 Vault- providence redmond senior housing- new construction of two bottomless infiltration vaults to provide infiltration of approximate 13 718 sq ft of roof drainage from a new 75 unit affordable senior housing project. North vault 214in by 114in. South vault 174in by 810in. Permit type: Stormwater vault | Permit id: Bldg-2016-01863 | |||||
SCORE 80 Redmond senior housing bldg: install voice and fire alarm system per nfpa 72 requirements. Total 185 devices. Transmitter and control panel. Date: May 17, 2016 Contractor: Fire Power Inc Applicant: Jason Streeter | Permit type: Fire alarm | Permit id: Fire-2016-03329 | |||||
SCORE 72 Ti redmond pace- scope of work includes the interior build-out of an existing unoccupied ground floor commercial space. Work includes construction of office exam rooms treatment rooms toilet rooms and dining room with warming kitchen. Area of work 7752 sq ft. Applicant: Shirley Bekins | Permit type: Mixed use | Permit id: Bldg-2015-09177 | |||||
SCORE 100 Redmond senior housing bldg: installation of 1 dry system for the parking garage level and 1 combination standpipe with floor controls for the heated floors above. Total 852 sprinkler heads. 2 risers (1 dry 1 standpipe). Date: June 2, 2016 Contractor: Smith Fire Systems Inc Applicant: Nicholas Scott | Permit type: Fire sprinkler - commercial | Permit id: Fire-2016-03514 | |||||
SCORE 100 Ti redmond pace- modification of existing system to accomodate new walls and ceilings. 88 heads. Applicant: Nicholas Scott | Permit type: Fire sprinkler - commercial | Permit id: Fire-2016-04955 | |||||
SCORE 99 Redmond senior housing bldg: installation of additional street lighting and (1) pedestrian crosswalk in conjuncity with the providence john gabriel house. Customer paid for (1) feeder (1) new service. 253-722-2842 Applicant: Todd Prentiss | Permit type: Electrical - otc | Permit id: Elec-2016-06128 | |||||
SCORE 80 Redmond pace - install voice and fire alarm system for ti in ground floor commercial space. Total 53 devices. Date: August 19, 2016 Contractor: Fire Power Inc Applicant: Mike Patterson | Permit type: Fire alarm | Permit id: Fire-2016-06756 | |||||
SCORE 80 Sopa - redmond senior housing bldg: providence john gabriel house - 509-468-3204 - install of cctv cameras and access control customer paid for:(423) low voltage Applicant: Jason Streeter | Permit type: Electrical - otc | Permit id: Elec-2016-07288 | |||||
SCORE 100 Sopa - redmond senior housing bldg: 253-872-5665 - installation of (3) low voltage thermostats and associated wiring. Customer paid for:(3) low voltage Applicant: Jennifer Sparrs | Permit type: Electrical - otc | Permit id: Elec-2016-07015 | |||||
SCORE 82 Multi family - development of 75 units of affordable senior independent living housing in a 5-story building with 8 0 sq. Ft. Of commercial space on the ground floor. Date: August 30, 2016 Contractor: Santana Trucking Applicant: Timothy Zaricznyj | Permit type: Side sewer | Permit id: Swr-2016-05534 | |||||
SCORE 82 Commercial meter - development of 75 units of affordable senior independent living housing in a 5-story building with 8 0 sq. Ft. Of commercial space on the ground floor. Date: August 30, 2016 Contractor: Santana Trucking Applicant: Timothy Zaricznyj | Permit type: Side sewer | Permit id: Swr-2016-05530 | |||||
SCORE 91 Sopa - redmond senior housing bldg: entire bldg - 425-321-5343 - installation of emergency responder radio system. Customer paid for:(25) low voltage Applicant: Dustin Duke | Permit type: Electrical - otc | Permit id: Elec-2016-07574 | |||||
SCORE 98 Redmond senior housing bldg: emergency responder radio system Applicant: William Blais | Permit type: Fire installation | Permit id: Fire-2016-08003 | |||||
SCORE 98 Otc redmond senior housing bldg- install of duct work only for bath fans laundry fans dryer vents range hood vents and a c port. Applicant: Bj Graham | Permit type: Mechanical - otc | Permit id: Mech-2016-08460 | |||||
SCORE 98 Sopa - redmond pace - 1st floor north - 509-220-8202 - 9 1 sqf ti customer paid for:(2) feeder. New complete wiring for shell space. Applicant: Tim Thompson | Permit type: Electrical - otc | Permit id: Elec-2016-08153 | |||||
SCORE 100 Sopa #48412 - providence - 206-264-2954 - install (1) wall sign. Applicant: Shawn Bowen | Permit type: Sign | Permit id: Sign-2017-04443 | |||||
SCORE 72 Redmond pace - plumbing for first floor ti of a mixed use 5-story buiding including (2) backflow devices (1) drinking fountain (1) electric water heater (1) floor drain (1) grease interceptor (8) sinks(bar) (5) sinks(bathroom) (2) sinks(floor mop) (2) sinks(kitchen) including a 3-compartment sink and (5) toilets. Total of (28) fixtures. Applicant: Timothy Zaricznyj | Permit type: Plumbing plan review | Permit id: Plum-2017-00924 | |||||
SCORE 100 Sopa - redmond pace ti - 253-872-5665 - installation of (8) low voltage thermostats and associated wiring. Customer paid for:(8) low voltage Applicant: Miranda Mendez | Permit type: Electrical - otc | Permit id: Elec-2017-00440 | |||||
SCORE 100 Sopa - redmond pace ti - 253-872-5665 - installation of (8) low voltage thermostats and associated wiring. Customer paid for:(8) low voltage Applicant: Miranda Mendez | Permit type: Electrical - otc | Permit id: Elec-2017-00440 | Parcel: 225059243 | |||||
SCORE 100 Sopa #48412 - providence - 206-264-2954 - install (1) wall sign. Applicant: Shawn Bowen | Permit type: Sign | Permit id: Sign-2017-04443 | Parcel: 6917858888 | |||||
SCORE 72 Redmond pace - plumbing for first floor ti of a mixed use 5-story buiding including (2) backflow devices (1) drinking fountain (1) electric water heater (1) floor drain (1) grease interceptor (8) sinks(bar) (5) sinks(bathroom) (2) sinks(floor mop) (2) sinks(kitchen) including a 3-compartment sink and (5) toilets. Total of (28) fixtures. Applicant: Timothy Zaricznyj | Permit type: Plumbing plan review | Permit id: Plum-2017-00924 | Parcel: 225059243 |