Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Oti-1 ,3rd fl-el, m,sp, ls ![]() ![]() Current use: Office | Permit id: 200406116231 | |||||
SCORE 100 Oti-2 2nd and 3rd floor el, me, sp Current use: Office | Permit id: 200407290104 | |||||
SCORE 100 6th floor-interior tenant improvement including but not limit to: remodel on non bearing partitions and construction of new non bearing partition. Work on 6th floor only. Current use: Office | Permit id: #200704269740 | |||||
SCORE 99 Oti-1 5th floor el me l s sp Current use: Office | Permit id: #200705010094 | |||||
SCORE 99 Interior non structural demolition. Disability accessibility compliance is exempt per sfbc ab-017 Current use: Office | Permit id: #200705080666 | |||||
SCORE 100 Install of 2 fire smoke dampers and 2 smoke detectors Current use: Office | Permit id: #200705221904 | |||||
SCORE 99 Oti-1 revision 5th fl Current use: Office | Permit id: #200705221947 | |||||
SCORE 99 Add 2 fir smoke dampers in new corridor walls. Current use: Office | Permit id: #200705232020 | |||||
SCORE 100 6th floor-addition of 26 speakers strobes and a strobe power supply for the 6th floor conference room remodel. The (e) speaker strobe units on the floor outside of the 2 new conference rooms are being replace with new synchronized units. Current use: Office | Permit id: #200705292373 | |||||
SCORE 98 Relocate f. S. Heads per t. I. 3 heads relocates. Current use: Office | Permit id: #200705312644 | |||||
SCORE 100 Rev. To matrix chart listed on sheet fa. 02 to previous application #2007 05 22 1904. Work has been paid for under previous applic. Number. Current use: Office | Permit id: #200706113490 | |||||
SCORE 99 Oti-1 5th floor el me ls sp. Current use: Office | Permit id: #200706123650 | |||||
SCORE 99 Oti-1 2nd floor el me ls sp. Current use: Office | Permit id: #200706123653 | |||||
SCORE 99 Oti-1 1st floor tenant improvement. Demo millwork. New walls. Electrical on separate permit. Current use: Office | Permit id: #200706265110 | |||||
SCORE 86 Relocate sprinklers into new t-bae. 5 total relocates Current use: Office | Permit id: #200707035798 | |||||
SCORE 86 Relocate fire sprinkler heads on 2nd floor. 2 relocates total Current use: Office | Permit id: #200707035800 | |||||
SCORE 98 Demo preaction system valve and reconnect to wet system 6th floor Current use: Office | Permit id: #200708018370 | |||||
SCORE 100 5 f- mechanical improvement to office space. Install new return air grille Current use: Office | Permit id: #200708170119 | |||||
SCORE 100 2 f- mechanical improvement to office space install 2 new return air grills install 2 new csd with flex duct. Current use: Office | Permit id: #200708170121 | |||||
SCORE 93 1st floor: minor demolition floor patching paint carpet Current use: Office | Permit id: #200801152547 | |||||
Interior tenant improvement of an existing office space including addition of non-load bearing partitions. Electrical mechanical plumbing. Life safety to be completed under separate permit. ![]() ![]() Current use: Office | Permit id: #200810154268 | |||||
SCORE 100 To complete work and obtain find inspection for work approved under pa 200703297607. Current use: Office | Permit id: #200812178697 | |||||
SCORE 99 7th floor: demolition of non-load bearing interior partitions.(per ab-017) Current use: Office | Permit id: #200807217187 | |||||
To complete work and obtain final inspection for work approved under pa 200810154268 ![]() ![]() Current use: Office | Permit id: #201002237031 | |||||
SCORE 93 Tenant improvement - 2nd 3rd and 4th floor. Non-structural. Electrical mechannical and life safety under separate permit. Current use: Office | Permit id: #201110146798 | |||||
SCORE 100 Fire sprinkler only. 2nd fl: relocate 8 pendents 2 uprights add 1 remove 1. Relocate 6 pendents Current use: Office | Permit id: #201110267644 | |||||
SCORE 100 Fire sprinkler permit. Add 2 pendent sprinkler heads on 3rd fl Current use: Office | Permit id: #201105256767 | |||||
SCORE 100 3rd floor tenant improvement of existing office - converting workstations to 2 private offices. Mep & lfs under separate permit;includes lighting Current use: Office | Permit id: #201105276948 | |||||
SCORE 93 Tenant improvement approx 2 sq ft on 2nd floor. Convert 2 workstations to private offices & add 2 workstations at extg storage file area. Current use: Office | Permit id: #201107079694 | |||||
SCORE 100 Fire sprinkler permit add 2 pendent sprinklers Current use: Office | Permit id: #201109134470 | |||||
T. I. On a multi-tenant ground floor new partitions demo millwork and interior partitions. Minor relocation of lighting new doors and glazing. Mep under seperate permit. ![]() ![]() Current use: Office | Permit id: #201207306057 | |||||
SCORE 100 Ground floor - mechanical & electrical work for tenant improvement. Ref arch #201207306057 Current use: Office | Permit id: #201208288422 | |||||
SCORE 100 Addition of speakers 4 speaker strobes strobe synchronization module for constant contact remodel of floor 1. All devices connect onto the life safety system Current use: Office | Permit id: #201209079132 | |||||
Ground & basement levels-revision to pa# 2012-0730-6057-add valet parking ![]() Current use: Office | Permit id: #201209180020 | |||||
SCORE 100 1st floor:fire sprinkler system upgrade; relocate 3 pendent sprinkler heads on the 1st floor. Delete 6 heads. T. I pa# 201207306057 Current use: Office | Permit id: #201209250581 | |||||
SCORE 95 Suite 700: new t. I. To include doors partitions ceiling and millwork. M. E. P. Is included in this permit. Current use: Office | Permit id: #201303061586 | |||||
SCORE 100 Demo of limited non structural partitions. Modify cabinetry in existing kitchenette. Mep and life safety under separate permit Current use: Office | Permit id: #201303081819 | |||||
SCORE 100 8th floor-relocate 4 pendent sprinklers & relocate 3 pendents in a conference room Current use: Office | Permit id: #201304043784 | |||||
SCORE 100 3 relocated uprights sprinklers. 9 new upright sprinklers 8 new pendent sprinklers. T. I ref pa# 201303061586 Current use: Office | Permit id: #201304083972 | |||||
SCORE 100 Addition of duct detectors 3 speakers 9 strobes and a strobe power supply for the thoughtbot tenant remodel on floor 7. All new devices connect onto the fire alarm system; ref. 2013-0306-1586 Current use: Office | Permit id: #201305096474 | |||||
Cti-2 5 f el me ![]() ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Expiration date: September 4, 1996 | Current use: Office | Permit id: 9616508 | |||||
SCORE 95 Install (132) data cables. ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20120830341 | |||||
Add and relocate fire sprinklers (1st fl only) ![]() Permit type: Otc alterations permit | Permit status: Expired | Completion date: October 31, 2000 | Expiration date: February 28, 2001 | Current use: Office | Permit id: 200010314543 | |||||
SCORE 92 Demolition related to bpa#201501307066 ![]() ![]() Permit type: Electrical permit | Permit status: Complete | Permit id: E201502236534 | |||||
SCORE 95 85 2nd street - 6th floor - attik - sf - up to 5 outlets - wbe job #01-135594 - contact tony raccanello 415-720-2612 ![]() ![]() Permit type: Electrical permit | Permit status: Complete | Permit id: Ew20141212422 | |||||
SCORE 95 Install (12) data cables ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20130806621 | |||||
SCORE 100 A new build out of an existing space as a new office for thoughtbot. New lights and outlets. ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20130416441 | |||||
SCORE 96 Provide permit for furniture installation. ![]() ![]() Permit type: Electrical permit | Permit status: Complete | Permit id: Ew20140425161 | |||||
SCORE 95 Supply and install cat 6 cables as per plans. 8th floor ![]() ![]() Permit type: Electrical permit | Permit status: Complete | Permit id: Ew20130415001 | |||||
SCORE 82 Elec & life safety - job 33112 ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20120827381 | |||||
Permit to operate boiler ![]() Permit status: Issued | Expiration date: July 6, 2012 | Permit id: 62820 | |||||
SCORE 84 Demo (e) fire sprinkler heads due to the removal of ceiling. (e) sprinklers head removed & plugged and four relocate maher - not reqd Permit type: Building permit | Current use: Office | Permit id: #201503029690 | |||||
Repalce (e) 175kw em generator with new 2 kw em generator ![]() Permit type: Additions alterations or repairs | Permit status: Cancelled | Completion date: September 4, 1996 | Current use: Office | Permit id: 9616504 | |||||
Cti i 3rd floor el-me-sp ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: February 27, 1996 | Expiration date: April 1, 1997 | Current use: Office | Permit id: 9603140 | |||||
SCORE 100 Ground floor suite #100: enlarging server room. Duct distribution being modified. 1 new 2 tons split ac system for telcom room 114. Maher na Permit type: Building permit | Current use: Office | Permit id: #201510068899 | |||||
Permit to operate boiler ![]() Permit status: Issued | Expiration date: March 9, 2007 | Permit id: 35715 | |||||
Cti-2 5/f el me ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: September 4, 1996 | Expiration date: September 26, 1997 | Current use: Office | Permit id: 9616508 | |||||
SCORE 95 Sierra club (2)fixtures (3)plugs ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20110602641 | |||||
SCORE 95 Cooper design - t. I ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20130327801 | |||||
SCORE 96 Add new receptacles in open office space. Replace existing light fixtures with new fixtures. ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20140328863 | |||||
SCORE 95 Install track ligths (11) install 12 switches install amp outlets (7) dishwasher ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: E201503167040 | |||||
8th floor-relocate 4 pendent sprinklers & relocate 3 pendents in a conference room ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: April 4, 2013 | Expiration date: March 30, 2014 | Current use: Office | Permit id: 201304043784 | |||||
SCORE 95 16 stations for modular partitions only ![]() ![]() Permit type: Electrical permit | Permit status: Complete | Permit id: Ew20130502501 | |||||
Relocate 17 sprinkler heads for new suspended ceiling ![]() Permit type: Otc alterations permit | Permit status: Expired | Completion date: December 4, 1996 | Expiration date: April 4, 1997 | Current use: Office | Permit id: 9623374 | |||||
SCORE 82 Fixtures & switches - job #32873 ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20111109283 | |||||
Permit to operate boiler ![]() Permit status: Issued | Expiration date: August 7, 2015 | Permit id: 82048 | |||||
SCORE 82 Remodel - fixtures switches receptacles - job #32873 ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20111020161 | |||||
Life safety work addition of smoke detector and horn strobe gr floor ![]() Permit type: Otc alterations permit | Permit status: Expired | Completion date: December 15, 2000 | Expiration date: April 15, 2001 | Current use: Office | Permit id: 200012157995 | |||||
SCORE 95 Stations for modular partitions only ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20121029621 | |||||
SCORE 93 Installation of 24 modular workstations ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20120928781 | |||||
1-3 flr: fire alarm for "chartboost". Add 15 smoke detectors 31 duct detectors 2 strobe power supplies speakers/strobes 11 strobes. Ref. 2016072634 201607263412 201607263413. Maher na ![]() Permit type: Otc alterations permit | Permit status: Issued | Completion date: August 30, 2016 | Expiration date: August 30, 2017 | Current use: Office | Permit id: 201608306308 | |||||
Permit to operate boiler ![]() Permit status: Issued | Expiration date: June 2, 2014 | Permit id: 74243 | |||||
Horizontal addition ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: November 18, 1996 | Expiration date: August 21, 1997 | Current use: Office | Permit id: 9622333 | |||||
SCORE 95 Project scope consists of selective demolition and safe-off in vacant 3/f no new construction is considered in this scope of work. T. I. Under seperate permit. N/a ordinance #155-13 ab-017 applies. Permit type: Building permit | Current use: Office | Permit id: #201605167549 | |||||
SCORE 99 7th floor: replace like for like 3 water source heat pumps. Maher na Permit type: Building permit | Current use: Office | Permit id: #201605187760 | |||||
Fire sprinkler permit. Add 2 pendent sprinkler heads on 3rd fl ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: May 25, 2011 | Expiration date: May 19, 2012 | Current use: Office | Permit id: 201105256767 | |||||
Renew expired appn. 9603149 ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: June 11, 1997 | Expiration date: October 11, 1997 | Current use: Office | Permit id: 9710645 | |||||
SCORE 100 Work category: 5p; install one kitchen pantry. All work is on the 8th floor. ![]() ![]() Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20130404760 | |||||
T. I. On a multi-tenant ground floor new partitions demo millwork and interior partitions. Minor relocation of lighting new doors and glazing. Mep under seperate permit. ![]() ![]() Permit type: Building permit | Expiration date: August 8, 2014 | Current use: Office | Permit id: #201207306057 | |||||
SCORE 100 Work category: 5p; install one new kitchen pantry. All work is on the 7th floor ![]() ![]() Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20130416994 | |||||
SCORE 100 Work category: 5p; ground floor - furnish and install (1) kitchen sink (1) lavatory and (1) fiberglass shower. ![]() ![]() Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20120817976 | |||||
SCORE 100 8th floor-relocate 4 pendent sprinklers & relocate 3 pendents in a conference room Permit type: Building permit | Expiration date: August 4, 2013 | Current use: Office | Permit id: #201304043784 | |||||
SCORE 100 Work category: 4pb; relocate 5 heads on the 8th floor ggfp# 13-151 ![]() ![]() Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20130408815 | |||||
Permit to operate boiler ![]() Permit status: Issued | Expiration date: March 31, 2011 | Permit id: 55825 | |||||
Fire sprinkler only. 2nd fl: relocate 8 pendents 2 uprights add 1 remove 1. Relocate 6 pendents ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: October 26, 2011 | Expiration date: October 20, 2012 | Current use: Office | Permit id: 201110267644 | |||||
SCORE 100 Ground floor - mechanical & electrical work for tenant improvement. Ref arch #201207306057 Permit type: Building permit | Expiration date: August 30, 2013 | Current use: Office | Permit id: #201208288422 | |||||
Oti 2 el me ls sp 7th floor ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: December 28, 1998 | Expiration date: January 21, 2000 | Current use: Office | Permit id: 9826301 | |||||
SCORE 100 3 relocated uprights sprinklers. 9 new upright sprinklers 8 new pendent sprinklers. T. I ref pa# 201303061586 Permit type: Building permit | Expiration date: August 8, 2013 | Current use: Office | Permit id: #201304083972 | |||||
SCORE 100 Work category: 2pa; hook up kitchen sink ![]() ![]() Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20150410483 | |||||
SCORE 100 Sprinkler t. I. ![]() ![]() Permit type: Plumbing permit | Permit status: Complete | Permit id: Pp20130408729 | |||||
SCORE 95 New lighting power. Fire alarm ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew201608240148 | |||||
SCORE 95 New lighting power and fire alarm ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew201608240151 | |||||
SCORE 95 New lighting power and fire alarn ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew201608240150 | |||||
3rd floor ti - some demo new non-load bearing interior partitions glazing ceiling & power/datra work and new finishes; mep life safety & sprinkler under separate permit. Constr cost shown excludes mep. N/a ordinance #155-13 ![]() ![]() Permit type: Building permit | Expiration date: August 3, 2018 | Current use: Office | Permit id: #201607263410 | |||||
2nd floor ti - some demo new non-load bearing interior partitions glazing ceiling & power/datra work and new finishes; mep life safety & sprinkler under separate permit. N/a ordinance #155-13 ![]() ![]() Permit type: Building permit | Expiration date: August 3, 2018 | Current use: Office | Permit id: #201607263412 | |||||
1st floor ti - include new non-load bearing interior partitions (some demo) glazing ceiling & power/datra work and new finishes; mep life safety & sprinkler under separate permit. N/a ordinance #155-13 ![]() ![]() Permit type: Building permit | Expiration date: August 3, 2018 | Current use: Office | Permit id: #201607263413 | |||||
SCORE 99 Remove existing hot water fan coils & assoc. Duct. Install new water source heat pumps & assoc. Duct new condenser water piping. Floor 1-3. Permit type: Building permit | Expiration date: August 18, 2018 | Current use: Office | Permit id: #201608023985 | |||||
Revision to app#2016-0726-3413. 1st floor t. I. Non-infringment statement corrected. N/a for maher ![]() ![]() Permit type: Building permit | Current use: Office | Permit id: #201608165114 | |||||
2/f- revision to cover sheet for arch. T. I. Pa#201607263412 non infringement statement corrected. N/a ordinance #155-13 ![]() ![]() Permit type: Building permit | Current use: Office | Permit id: #201608165116 | |||||
Revision to app#2016-0726-3410. 3rd floor t. I. Non-infringment statement corrected. N/a for maher ![]() ![]() Permit type: Building permit | Current use: Office | Permit id: #201608165126 | |||||
SCORE 100 Work category: 5p; install 1 kitchen pantry on 1st 2nd and 3rd floors. Install new restroom fixtures in core restrooms on 2nd and 3rd floors. Install 1 toilet and 1 basin on the 1st floor ![]() ![]() Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20160826058 | |||||
1st flr: soft (non structural) demolition including partitions doors millwork sink light fixtures floor finishes in preparation for tenant improvements under separate permit. Note all life safety devices to remain. Maher n/a ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: January 30, 2015 | Expiration date: January 25, 2016 | Current use: Office | Permit id: 201501307066 | |||||
Reroofing ![]() Permit type: Otc alterations permit | Permit status: Expired | Completion date: May 8, 1996 | Expiration date: May 8, 1997 | Current use: Office | Permit id: 9607971 | |||||
Hvac - add (1) water source heat pump to (e)space ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: July 10, 2002 | Expiration date: November 10, 2002 | Current use: Office | Permit id: 200207101033 | |||||
Fire sprinkler system ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: October 11, 1995 | Expiration date: December 11, 1996 | Current use: Office | Permit id: 9516949 | |||||
To complete work and obtain final inspection for work approved under pa 200810154268 ![]() ![]() Permit type: Building permit | Expiration date: June 23, 2010 | Current use: Office | Permit id: #201002237031 | |||||
Permit to operate boiler ![]() Permit status: Issued | Expiration date: June 10, 2013 | Permit id: 68525 | |||||
Oti-3 1st floor sp ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: November 22, 2000 | Expiration date: April 7, 2001 | Current use: Office | Permit id: 200011226417 | |||||
2nd floor - scope consists of selective demolition & safe-off in vacant space. No new construction is considered in this scope of work. Tenant improvement under separate permit. (ab-017) n/a maher ordinance all life safety systems to be maintained ![]() ![]() Permit type: Building permit | Expiration date: March 4, 2017 | Current use: Office | Permit id: #201602230323 | |||||
Cti-2 1/f el me sp ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: October 1, 1996 | Expiration date: May 8, 1997 | Current use: Office | Permit id: 9618640 | |||||
Cti-2 7thfl el me ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: September 30, 1996 | Expiration date: November 8, 1997 | Current use: Office | Permit id: 9618639 | |||||
Permit to operate boiler ![]() Permit status: Issued | Expiration date: June 29, 2004 | Permit id: 25277 | |||||
Addition of duct detectors 3 speakers 9 strobes and a strobe power supply for the "thoughtbot" tenant remodel on floor 7. All new devices connect onto the fire alarm system; ref. 2013-0306-1586 ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: May 9, 2013 | Expiration date: May 4, 2014 | Current use: Office | Permit id: 201305096474 | |||||
Install of 2 fire smoke dampers and 2 smoke detectors ![]() Permit type: Otc alterations permit | Permit status: Issued | Completion date: May 22, 2007 | Expiration date: September 22, 2007 | Current use: Office | Permit id: 200705221904 | |||||
Suite 700: new t. I. To include doors partitions ceiling and millwork. M. E. P. Is included in this permit. ![]() ![]() Permit type: Building permit | Expiration date: March 18, 2015 | Current use: Office | Permit id: #201303061586 | |||||
SCORE 100 Demo of limited non structural partitions. Modify cabinetry in existing kitchenette. Mep and life safety under separate permit Permit type: Building permit | Expiration date: March 11, 2014 | Current use: Office | Permit id: #201303081819 | |||||
Cti i 4th floor el-me-sp ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: February 27, 1996 | Expiration date: April 1, 1997 | Current use: Office | Permit id: 9603149 | |||||
Removal of (e) non structural partition to open up space provide (n) non structural low ht walls ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: July 27, 2000 | Expiration date: July 29, 2001 | Current use: Office | Permit id: 200007276240 | |||||
SCORE 85 Relocate (4) sprinkler heads to adjust for new ceilings. ![]() ![]() Permit type: Plumbing permit | Permit status: Complete | Permit id: Pp20150302454 | |||||
Ground & basement levels-revision to pa# 2012-0730-6057-add valet parking ![]() Permit type: Otc alterations permit | Permit status: Filed | Completion date: September 18, 2012 | Current use: Office | Permit id: 201209180020 | |||||
2nd floor ti - some demo new non-load bearing interior partitions glazing ceiling & power/datra work and new finishes; mep life safety & sprinkler under separate permit. N/a ordinance #155-13 ![]() Permit type: Otc alterations permit | Permit status: Issued | Completion date: July 26, 2016 | Expiration date: August 3, 2018 | Current use: Office | Permit id: 201607263412 | |||||
SCORE 100 Fire sprinkler permit. Add 2 pendent sprinkler heads on 3rd fl Permit type: Building permit | Expiration date: September 25, 2011 | Current use: Office | Permit id: #201105256767 | |||||
SCORE 100 3rd floor tenant improvement of existing office - converting workstations to 2 private offices. Mep & lfs under separate permit;includes lighting Permit type: Building permit | Expiration date: May 27, 2012 | Current use: Office | Permit id: #201105276948 | |||||
SCORE 100 Work category: 4pb; add 2 pendents sprinklers heads on the 3rd fl #1133490 ![]() ![]() Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20110525687 | |||||
SCORE 100 Addition of duct detectors 3 speakers 9 strobes and a strobe power supply for the "thoughtbot" tenant remodel on floor 7. All new devices connect onto the fire alarm system; ref. 2013-0306-1586 Permit type: Building permit | Expiration date: November 9, 2013 | Current use: Office | Permit id: #201305096474 | |||||
Minor revision to 96031 addtn of closet for housing valve ![]() Permit type: Otc alterations permit | Permit status: Expired | Completion date: May 29, 1996 | Expiration date: September 29, 1996 | Current use: Office | Permit id: 9609355 | |||||
Project scope consists of selective demolition and safe-off in vacant 3/f no new construction is considered in this scope of work. T. I. Under seperate permit. N/a ordinance #155-13 ab-017 applies. ![]() ![]() Permit type: Building permit | Expiration date: May 19, 2017 | Current use: Office | Permit id: #201605167549 | |||||
Permit to operate boiler ![]() Permit status: Issued | Expiration date: August 11, 2016 | Permit id: 89455 | |||||
Renewal of permit inspection pa 9622114 ![]() Permit type: Otc alterations permit | Permit status: Expired | Completion date: October 2, 1997 | Expiration date: February 2, 1998 | Current use: Office | Permit id: 9719588 | |||||
Suite 700: new t. I. To include doors partitions ceiling and millwork. M. E. P. Is included in this permit. ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: March 6, 2013 | Expiration date: March 2, 2016 | Current use: Office | Permit id: 201303061586 | |||||
SCORE 93 Tenant improvement - 2nd 3rd and 4th floor. Non-structural. Electrical mechannical and life safety under separate permit. Permit type: Building permit | Expiration date: October 18, 2013 | Current use: Office | Permit id: #201110146798 | |||||
SCORE 100 Fire sprinkler only. 2nd fl: relocate 8 pendents 2 uprights add 1 remove 1. Relocate 6 pendents Permit type: Building permit | Expiration date: April 26, 2012 | Current use: Office | Permit id: #201110267644 | |||||
Additions alterations or repairs ![]() Permit status: Complete | Completion date: March 7, 1984 | Expiration date: October 23, 1984 | Current use: Office | Permit id: 8402410 | |||||
SCORE 100 Fire sprinkler permit add 2 pendent sprinklers Permit type: Building permit | Expiration date: January 14, 2012 | Current use: Office | Permit id: #201109134470 | |||||
SCORE 100 Work category: 4pb; fire sprinkler permit 2 pendent sprinklers ![]() ![]() Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20110914603 | |||||
Ground & basement levels-revision to pa# 2012-0730-6057-add valet parking ![]() Permit type: Building permit | Current use: Office | Permit id: #201209180020 | |||||
SCORE 100 1st floor:fire sprinkler system upgrade; relocate 3 pendent sprinkler heads on the 1st floor. Delete 6 heads. T. I pa# 201207306057 Permit type: Building permit | Expiration date: January 26, 2013 | Current use: Office | Permit id: #201209250581 | |||||
SCORE 100 Work category: 4pb; relocate 3 heads on the 1st floor ggfp # 12-228 ![]() ![]() Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20120927897 | |||||
Cti-1 7thfl el me sp ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: March 19, 1997 | Expiration date: May 15, 1998 | Current use: Office | Permit id: 9705031 | |||||
6th floor-addition of 26 speakers/strobes and a strobe power supply for the 6th floor conference room remodel. The (e) speaker/strobe units on the floor outside of the 2 new conference rooms are being replace with new synchronized units. ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: May 29, 2007 | Expiration date: November 29, 2007 | Current use: Office | Permit id: 200705292373 | |||||
SCORE 95 Install (131) data cables. ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew201609140540 | |||||
SCORE 95 Install (49) data cables. ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew201609140538 | |||||
SCORE 95 Install (139) data cables ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew201609140539 | |||||
SCORE 99 2nd flr: install new ac unit to (e) server room exhaust fans 1st & 3rd flr maher na Permit type: Building permit | Expiration date: September 2, 2017 | Current use: Office | Permit id: #201609026665 | |||||
SCORE 100 1st 2nd 3rd floor: fire sprinklers - relocate 2 upright sprinklers on 1st. Relocate 3 pendent sprinklers. Relocate upright sprinklers on 2nd. Relocates 11 uprights on the 3 floors and 17 pendents. Ref ti 1st- 201607263413 2nd - 201607263412 3rd - 2016072634 maher na Permit type: Building permit | Expiration date: September 6, 2017 | Current use: Office | Permit id: #201609066834 | |||||
SCORE 100 Electrical work for tenant improvement reference ti 2016. 0816. 5116 maher not req Permit type: Building permit | Expiration date: September 19, 2017 | Current use: Office | Permit id: #201609157765 | |||||
SCORE 100 Work category: 4pb; 16-275 relocate 5 heads on 1st floor and 21 heads on the 2nd floor and 17 heads on the 3rd floor ![]() ![]() Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20160907313 | |||||
Cti i 2nd floor el-me-sp ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: February 27, 1996 | Expiration date: April 1, 1997 | Current use: Office | Permit id: 9603150 | |||||
Builing fire alarm plans only. ![]() Permit type: Otc alterations permit | Permit status: Expired | Completion date: July 11, 1997 | Expiration date: November 11, 1997 | Current use: Office | Permit id: 9712857 | |||||
Demolition of partition wall. New partition wall. New suspended ceiling. ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: September 21, 2000 | Expiration date: October 24, 2001 | Current use: Office | Permit id: 200009211188 | |||||
Seismic upgrade entire bldg. Foundation & superstructure ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: March 26, 1993 | Expiration date: August 19, 1995 | Current use: Office | Permit id: 9304866 | |||||
Complete tenant office finish build-out. ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: August 9, 1996 | Expiration date: September 18, 1997 | Current use: Office | Permit id: 9614690 | |||||
New base bldg life safety system revision to 9507893 ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: November 14, 1996 | Expiration date: July 31, 1997 | Current use: Office | Permit id: 9622114 | |||||
Oti-1 1st floor tenant improvement. Demo millwork. New walls. Electrical on separate permit. ![]() Permit type: Otc alterations permit | Permit status: Issued | Completion date: June 26, 2007 | Expiration date: June 26, 2008 | Current use: Office | Permit id: 200706265110 | |||||
Cti-2 8thfl el me ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: September 30, 1996 | Expiration date: November 8, 1997 | Current use: Office | Permit id: 9618641 | |||||
Remove (e) metal awnings enclose (e) covered portico w/new storefront windows to match (e) windows ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: August 8, 2000 | Expiration date: August 30, 2001 | Current use: Office | Permit id: 200008087233 | |||||
3 relocated uprights sprinklers. 9 new upright sprinklers 8 new pendent sprinklers. T. I ref pa# 201303061586 ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: April 8, 2013 | Expiration date: April 3, 2014 | Current use: Office | Permit id: 201304083972 | |||||
Fire sprinkler permit add 2 pendent sprinklers ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: September 13, 2011 | Expiration date: September 8, 2012 | Current use: Office | Permit id: 201109134470 | |||||
Rev. To matrix chart listed on sheet fa. 02 to previous application #2007/05/22/1904. Work has been paid for under previous applic. Number. ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: June 11, 2007 | Expiration date: October 11, 2007 | Current use: Office | Permit id: 200706113490 | |||||
Relocate fire sprinkler heads on 2nd floor. 2 relocates total ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: July 3, 2007 | Expiration date: November 3, 2007 | Current use: Office | Permit id: 200707035800 | |||||
Cti-3 ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: April 2, 1996 | Expiration date: October 11, 1996 | Current use: Office | Permit id: 9605512 | |||||
Interior non structural demolition. Disability accessibility compliance is exempt per sfbc ab-017 ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: May 8, 2007 | Expiration date: September 8, 2007 | Current use: Office | Permit id: 200705080666 | |||||
1st floor:fire sprinkler system upgrade; relocate 3 pendent sprinkler heads on the 1st floor. Delete 6 heads. T. I pa# 201207306057 ![]() Permit type: Otc alterations permit | Permit status: Issued | Completion date: September 25, 2012 | Expiration date: September 21, 2013 | Current use: Office | Permit id: 201209250581 | |||||
Cti-1 8/f el me sp ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: August 9, 1996 | Expiration date: September 18, 1997 | Current use: Office | Permit id: 9614692 | |||||
Cti-3 1st floor sp ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: June 20, 1997 | Expiration date: November 1, 1997 | Current use: Office | Permit id: 9711301 | |||||
Oti-1 revision 5th fl ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: May 22, 2007 | Expiration date: September 22, 2007 | Current use: Office | Permit id: 200705221947 | |||||
2nd floor - scope consists of selective demolition & safe-off in vacant space. No new construction is considered in this scope of work. Tenant improvement under separate permit. (ab-017) n/a maher ordinance all life safety systems to be maintained ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: February 23, 2016 | Expiration date: March 4, 2017 | Current use: Office | Permit id: 201602230323 | |||||
Tenant improvement approx 2 sq ft on 2nd floor. Convert 2 workstations to private offices & add 2 workstations at extg storage/file area. ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: July 7, 2011 | Expiration date: July 20, 2012 | Current use: Office | Permit id: 201107079694 | |||||
Interior tenant improvement of an existing office space including addition of non-load bearing partitions. Electrical mechanical plumbing. Life safety to be completed under separate permit. ![]() Permit type: Otc alterations permit | Permit status: Issued | Completion date: October 15, 2008 | Expiration date: October 10, 2009 | Current use: Office | Permit id: 200810154268 | |||||
Ct1-4 life safety (ist floor) ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: June 25, 1997 | Expiration date: November 29, 1997 | Current use: Office | Permit id: 9711659 | |||||
Oti-1 5/f l/f ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: June 24, 1999 | Expiration date: January 9, 2000 | Current use: Office | Permit id: 9912614 | |||||
Ground floor - mechanical & electrical work for tenant improvement. Ref arch #201207306057 ![]() Permit type: Otc alterations permit | Permit status: Issued | Completion date: August 28, 2012 | Expiration date: August 15, 2015 | Current use: Office | Permit id: 201208288422 | |||||
5/f- mechanical improvement to office space. Install new return air grille ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: August 17, 2007 | Expiration date: February 23, 2008 | Current use: Office | Permit id: 200708170119 | |||||
Strentghen existing parapet per citys requirements ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: January 13, 1986 | Expiration date: January 31, 1987 | Current use: Office | Permit id: 8600453 | |||||
Oti-2 grnd floor el and me ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: October 27, 2000 | Expiration date: November 13, 2001 | Current use: Office | Permit id: 200010274228 | |||||
7th floor: replace like for like 3 water source heat pumps. Maher na ![]() Permit type: Otc alterations permit | Permit status: Issued | Completion date: May 18, 2016 | Expiration date: May 26, 2017 | Current use: Office | Permit id: 201605187760 | |||||
Cti-1 floor 5th el me sp ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: August 26, 1996 | Expiration date: September 20, 1997 | Current use: Office | Permit id: 9615904 | |||||
6th floor-interior tenant improvement including but not limit to: remodel on non bearing partitions and construction of new non bearing partition. Work on 6th floor only. ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: April 26, 2007 | Expiration date: April 26, 2008 | Current use: Office | Permit id: 200704269740 | |||||
New partitions new mechanical & electrical distribution ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: December 21, 1999 | Expiration date: March 14, 2001 | Current use: Office | Permit id: 9926784 | |||||
3rd floor tenant improvement of existing office - converting workstations to 2 private offices. Mep & lfs under separate permit;includes lighting ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: May 27, 2011 | Expiration date: May 21, 2012 | Current use: Office | Permit id: 201105276948 | |||||
Relocate f. S. Heads per t. I. 3 heads relocates. ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: May 31, 2007 | Expiration date: September 30, 2007 | Current use: Office | Permit id: 200705312644 | |||||
Renewal per app#9713167 ![]() Permit type: Otc alterations permit | Permit status: Expired | Completion date: July 16, 1997 | Expiration date: November 16, 1997 | Current use: Office | Permit id: 9713167 | |||||
Provide tie back no increase in office space ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: June 8, 2000 | Expiration date: June 20, 2001 | Current use: Office | Permit id: 200006082067 | |||||
F/s only ti under 9926784 ![]() Permit type: Otc alterations permit | Permit status: Expired | Completion date: February 9, 2000 | Expiration date: June 9, 2000 | Current use: Office | Permit id: 200002091393 | |||||
Add 2 fir smoke dampers in new corridor walls. ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: May 23, 2007 | Expiration date: November 23, 2007 | Current use: Office | Permit id: 200705232020 | |||||
Electrical work for ti 201608165126 ![]() Permit type: Otc alterations permit | Permit status: Filed | Completion date: September 15, 2016 | Current use: Office | Permit id: 201609157769 | |||||
Electrical work for ti ![]() Permit type: Otc alterations permit | Permit status: Filed | Completion date: September 15, 2016 | Current use: Office | Permit id: 201609157763 | |||||
Electrical work for tenant improvement reference ti 2016. 0816. 5116 maher not req ![]() Permit type: Otc alterations permit | Permit status: Issued | Completion date: September 15, 2016 | Expiration date: September 19, 2017 | Current use: Office | Permit id: 201609157765 | |||||
1st 2nd 3rd floor: fire sprinklers - relocate 2 upright sprinklers on 1st. Relocate 3 pendent sprinklers. Relocate upright sprinklers on 2nd. Relocates 11 uprights on the 3 floors and 17 pendents. Ref ti 1st- 201607263413 2nd - 201607263412 3rd - 2016072634 maher na ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: September 6, 2016 | Expiration date: September 6, 2017 | Current use: Office | Permit id: 201609066834 | |||||
To complete work and obtain find inspection for work approved under pa 200703297607. ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: December 17, 2008 | Expiration date: December 12, 2009 | Current use: Office | Permit id: 200812178697 | |||||
Oti-1 1st floor el me ls sp. ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: October 1, 2002 | Expiration date: October 30, 2003 | Current use: Office | Permit id: 200210017887 | |||||
Ground floor suite #100: enlarging server room. Duct distribution being modified. 1 new 2 tons split ac system for telcom room 114. Maher na ![]() Permit type: Otc alterations permit | Permit status: Issued | Completion date: October 6, 2015 | Expiration date: October 27, 2016 | Current use: Office | Permit id: 201510068899 | |||||
Cti 2 4th fl el me ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: March 1, 1996 | Expiration date: April 1, 1997 | Current use: Office | Permit id: 9603392 | |||||
2/f- mechanical improvement to office space install 2 new return air grills install 2 new csd with flex duct. ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: August 17, 2007 | Expiration date: February 23, 2008 | Current use: Office | Permit id: 200708170121 | |||||
Tenant improvements in first floor space for furniture showroom work includes new partitions door millwork lighting electrical & finishes mep life safety & fire sprinklers under separate permit; maher n/a. Comply with nov # 201521931 ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: February 19, 2015 | Expiration date: February 21, 2016 | Current use: Retail sales | Permit id: 201502198727 | |||||
3 unreasonable hardship request/freight elevator/hp ramp/ ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: October 10, 1996 | Expiration date: March 6, 1997 | Current use: Office | Permit id: 9619470 | |||||
Demo preaction system valve and reconnect to wet system 6th floor ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: August 1, 2007 | Expiration date: December 1, 2007 | Current use: Office | Permit id: 200708018370 | |||||
Installation of (1) duct detector to existing fire alarm mech separate permit ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: August 23, 2002 | Expiration date: February 23, 2003 | Current use: Office | Permit id: 200208234761 | |||||
Oti-1 el me sp 7th flr ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: October 26, 1998 | Expiration date: November 5, 1999 | Current use: Office | Permit id: 9821856 | |||||
Cti-2 (el me) 6th fl ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: August 23, 1996 | Expiration date: September 26, 1997 | Current use: Office | Permit id: 9615780 | |||||
Add and relocate sprinkler head per approved plan on 2nd and 3rd fl only ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: March 27, 2001 | Expiration date: July 27, 2001 | Current use: Office | Permit id: 200103275292 | |||||
Cti-iii sprinklers ![]() Permit type: Otc alterations permit | Permit status: Expired | Completion date: July 30, 1997 | Expiration date: November 30, 1997 | Current use: Office | Permit id: 9714230 | |||||
Remove existing hot water fan coils & assoc. Duct. Install new water source heat pumps & assoc. Duct new condenser water piping. Floor 1-3. ![]() Permit type: Otc alterations permit | Permit status: Issued | Completion date: August 2, 2016 | Expiration date: August 18, 2018 | Current use: Office | Permit id: 201608023985 | |||||
Oti-1 grd flr ls spr ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: May 31, 2002 | Expiration date: January 1, 2003 | Current use: Office | Permit id: 200205317909 | |||||
Oti-1 6/f l/s ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: June 24, 1999 | Expiration date: January 9, 2000 | Current use: Office | Permit id: 9912616 | |||||
Addition of speakers 4 speaker/strobes strobe synchronization module for constant contact remodel of floor 1. All devices connect onto the life safety system ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: September 7, 2012 | Expiration date: September 5, 2013 | Current use: Office | Permit id: 201209079132 | |||||
Cti-2 1/f el me ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: May 30, 1997 | Expiration date: June 20, 1998 | Current use: Office | Permit id: 9709821 | |||||
Cti-2 7thfl el me ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: March 19, 1997 | Expiration date: May 15, 1998 | Current use: Office | Permit id: 9705032 | |||||
Oti-1 3rd fl-el m sp ls ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: June 11, 2004 | Expiration date: January 7, 2005 | Current use: Office | Permit id: 200406116231 | |||||
Cti 2 2nd fl el me ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: March 1, 1996 | Expiration date: April 1, 1997 | Current use: Office | Permit id: 9603390 | |||||
Cti 3 4th fl sp ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: April 2, 1996 | Expiration date: October 11, 1996 | Current use: Office | Permit id: 9605513 | |||||
Oti-3 1st flr. Sp ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: November 22, 2002 | Expiration date: June 6, 2003 | Current use: Office | Permit id: 200211222130 | |||||
Relocate sprinklers into new t-bae. 5 total relocates ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: July 3, 2007 | Expiration date: November 3, 2007 | Current use: Office | Permit id: 200707035798 | |||||
Cti-1 (el me sp) 6th fl ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: August 23, 1996 | Expiration date: September 20, 1997 | Current use: Office | Permit id: 9615779 | |||||
Oti-2 2nd and 3rd floor el me sp ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: July 29, 2004 | Expiration date: January 29, 2005 | Current use: Office | Permit id: 200407290104 | |||||
Oti-4 1st l/s ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: January 17, 2003 | Expiration date: August 3, 2003 | Current use: Office | Permit id: 200301175419 | |||||
Cti-1 1/f el me sp ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: August 9, 1996 | Expiration date: September 18, 1997 | Current use: Office | Permit id: 9614691 | |||||
1st floor: minor demolition floor patching paint carpet ![]() Permit type: Otc alterations permit | Permit status: Issued | Completion date: January 15, 2008 | Expiration date: July 15, 2008 | Current use: Office | Permit id: 200801152547 | |||||
Oti-1 2nd floor el me ls sp. ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: June 12, 2007 | Expiration date: December 12, 2007 | Current use: Office | Permit id: 200706123653 | |||||
Relocate fire sprinkler heads & install preaction system ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: October 7, 1996 | Expiration date: April 7, 1997 | Current use: Office | Permit id: 9619182 | |||||
Cti-2 ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: November 5, 1996 | Expiration date: March 21, 1997 | Current use: Office | Permit id: 9621425 | |||||
7th floor: demolition of non-load bearing interior partitions.(per ab-017) ![]() Permit type: Otc alterations permit | Permit status: Issued | Completion date: July 21, 2008 | Expiration date: November 21, 2008 | Current use: Office | Permit id: 200807217187 | |||||
2nd flr add glass lite remve e low walls convert 2 0ffices 3rd fl alter prvt office add 2 off/carrel ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: January 8, 2001 | Expiration date: January 8, 2002 | Current use: Office | Permit id: 200101089371 | |||||
Tenant improvement - 2nd 3rd and 4th floor. Non-structural. Electrical mechannical and life safety under separate permit. ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: October 14, 2011 | Expiration date: October 2, 2014 | Current use: Office | Permit id: 201110146798 | |||||
Oti-1 5th floor el me ls sp. ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: June 12, 2007 | Expiration date: June 12, 2008 | Current use: Office | Permit id: 200706123650 | |||||
Structural repair of bsmnt walls/replacement of partial slab ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: September 12, 2001 | Expiration date: October 29, 2002 | Current use: Office | Permit id: 200109128113 | |||||
Demo of limited non structural partitions. Modify cabinetry in existing kitchenette. Mep and life safety under separate permit ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: March 8, 2013 | Expiration date: February 24, 2016 | Current use: Office | Permit id: 201303081819 | |||||
Demo (e) fire sprinkler heads due to the removal of ceiling. (e) sprinklers head removed & plugged and four relocate maher - not reqd ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: March 2, 2015 | Expiration date: February 25, 2016 | Current use: Office | Permit id: 201503029690 | |||||
Relocate & add fire sprk heads per tenant improvements ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: July 9, 2002 | Expiration date: November 9, 2002 | Current use: Office | Permit id: 200207090913 | |||||
2nd flr: install new ac unit to (e) server room exhaust fans 1st & 3rd flr maher na ![]() Permit type: Otc alterations permit | Permit status: Issued | Completion date: September 2, 2016 | Expiration date: September 2, 2017 | Current use: Office | Permit id: 201609026665 | |||||
Bldg upgrade sprinkle new toilet rm hp ramp access mech sys ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: May 26, 1995 | Expiration date: March 8, 1998 | Current use: Office | Permit id: 9507893 | |||||
Cti 3 2nd fl sp ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: April 2, 1996 | Expiration date: October 11, 1996 | Current use: Office | Permit id: 9605514 | |||||
Oti-1 5th floor el me l/s sp ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: May 1, 2007 | Expiration date: May 1, 2008 | Current use: Office | Permit id: 200705010094 | |||||
Cti-1 1/f el me sp ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: May 22, 1997 | Expiration date: June 6, 1998 | Current use: Office | Permit id: 9709324 | |||||
Oti-2 1st floor el. ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: October 1, 2002 | Expiration date: April 30, 2003 | Current use: Office | Permit id: 200210017890 | |||||
Permit to operate boiler ![]() Permit status: Issued | Expiration date: May 17, 2010 | Permit id: 50100 | |||||
SCORE 95 2nd floor ti - some demo new non-load bearing interior partitions glazing ceiling & power datra work and new finishes; mep life safety & sprinkler under separate permit. N a ordinance #155-13 Permit type: Building permit | Expiration date: August 3, 2018 | Current use: Office | Permit id: #201607263412 | |||||
SCORE 95 3rd floor ti - some demo new non-load bearing interior partitions glazing ceiling & power datra work and new finishes; mep life safety & sprinkler under separate permit. Constr cost shown excludes mep. N a ordinance #155-13 Permit type: Building permit | Expiration date: August 3, 2018 | Current use: Office | Permit id: #201607263410 | |||||
SCORE 95 1st floor ti - include new non-load bearing interior partitions (some demo) glazing ceiling & power datra work and new finishes; mep life safety & sprinkler under separate permit. N a ordinance #155-13 Permit type: Building permit | Expiration date: August 3, 2018 | Current use: Office | Permit id: #201607263413 | |||||
Revision to app#2016-0726-3410. 3rd floor t. I. Non-infringment statement corrected. N a for maher ![]() ![]() Permit type: Building permit | Current use: Office | Permit id: #201608165126 | |||||
Revision to app#2016-0726-3413. 1st floor t. I. Non-infringment statement corrected. N a for maher ![]() ![]() Permit type: Building permit | Current use: Office | Permit id: #201608165114 | |||||
2 f- revision to cover sheet for arch. T. I. Pa#201607263412 non infringement statement corrected. N a ordinance #155-13 ![]() ![]() Permit type: Building permit | Current use: Office | Permit id: #201608165116 | |||||
1st flr: soft (non structural) demolition including partitions doors millwork sink light fixtures floor finishes in preparation for tenant improvements under separate permit. Note all life safety devices to remain. Maher n a ![]() ![]() Permit type: Otc alterations permit | Permit status: Complete | Expiration date: January 30, 2015 | Current use: Office | Permit id: 201501307066 | |||||
Permit to operate boiler ![]() Permit status: Issued | Expiration date: June 12, 2008 | Permit id: 40952 | |||||
Permit to operate boiler ![]() Permit status: Issued | Expiration date: July 11, 2001 | Permit id: 15509 | |||||
Permit to operate boiler ![]() Permit status: Issued | Expiration date: June 1, 2009 | Permit id: 45903 | |||||
SCORE 95 2nd floor - scope consists of selective demolition & safe-off in vacant space. No new construction is considered in this scope of work. Tenant improvement under separate permit. (ab-017) n a maher ordinance all life safety systems to be maintained Permit type: Building permit | Expiration date: March 4, 2017 | Current use: Office | Permit id: #201602230323 | |||||
Cti-2 1 f el me sp ![]() ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Expiration date: October 1, 1996 | Current use: Office | Permit id: 9618640 | |||||
SCORE 95 Suite 700: new t. I. To include doors partitions ceiling and millwork. M. E. P. Is included in this permit. Permit type: Building permit | Expiration date: March 18, 2015 | Current use: Office | Permit id: #201303061586 | |||||
2nd floor ti - some demo new non-load bearing interior partitions glazing ceiling & power datra work and new finishes; mep life safety & sprinkler under separate permit. N a ordinance #155-13 ![]() ![]() Permit type: Otc alterations permit | Permit status: Issued | Expiration date: July 26, 2016 | Current use: Office | Permit id: 201607263412 | |||||
Project scope consists of selective demolition and safe-off in vacant 3 f no new construction is considered in this scope of work. T. I. Under seperate permit. N a ordinance #155-13 ab-017 applies. ![]() ![]() Permit type: Otc alterations permit | Permit status: Complete | Expiration date: May 16, 2016 | Current use: Office | Permit id: 201605167549 | |||||
SCORE 95 Project scope consists of selective demolition and safe-off in vacant 3 f no new construction is considered in this scope of work. T. I. Under seperate permit. N a ordinance #155-13 ab-017 applies. Permit type: Building permit | Expiration date: May 19, 2017 | Current use: Office | Permit id: #201605167549 | |||||
Remove (e) metal awnings enclose (e) covered portico w new storefront windows to match (e) windows ![]() ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Expiration date: August 8, 2000 | Current use: Office | Permit id: 200008087233 | |||||
1st flr: revision to 201607263413 scope includes structural drawings for freestanding conference on ground floor; maher n a ![]() Permit type: Building permit | Current use: Office | Permit id: #201611072157 | |||||
1st flr: revision to ref 201607263413 & 201608165114: changing millwork measurements and changing walls foe conference room. Structural included interior work only maher na ![]() ![]() Permit type: Building permit | Expiration date: March 28, 2017 | Current use: Office | Permit id: #201611162853 | |||||
SCORE 100 Revision to app#2016-0726-3413. 1st floor t. I. Non-infringment statement corrected. N a for maher Permit type: Building permit | Expiration date: February 20, 2017 | Current use: Office | Permit id: #201608165114 | |||||
SCORE 100 2 f- revision to cover sheet for arch. T. I. Pa#201607263412 non infringement statement corrected. N a ordinance #155-13 Permit type: Building permit | Expiration date: February 20, 2017 | Current use: Office | Permit id: #201608165116 | |||||
SCORE 100 Revision to app#2016-0726-3410. 3rd floor t. I. Non-infringment statement corrected. N a for maher Permit type: Building permit | Expiration date: February 20, 2017 | Current use: Office | Permit id: #201608165126 | |||||
SCORE 93 Fabricate and install 4 emergency evacuation maps at 85 2nd street. 2 on 2nd floor 2 on 3rd floor. Digital print. Sub surface mounted to 1 8" non glare acrylic mounted to wall with vhb tape and silicone. N a for maher. Permit type: Building permit | Expiration date: February 24, 2017 | Current use: Office | Permit id: #201610241032 | |||||
6th floor-addition of 26 speakers strobes and a strobe power supply for the 6th floor conference room remodel. The (e) speaker strobe units on the floor outside of the 2 new conference rooms are being replace with new synchronized units. ![]() ![]() Permit type: Otc alterations permit | Permit status: Complete | Expiration date: May 29, 2007 | Current use: Office | Permit id: 200705292373 | |||||
Permit to operate boiler ![]() Permit status: Issued | Expiration date: January 29, 2003 | Permit id: 19891 | |||||
Rev. To matrix chart listed on sheet fa. 02 to previous application #2007 05 22 1904. Work has been paid for under previous applic. Number. ![]() ![]() Permit type: Otc alterations permit | Permit status: Complete | Expiration date: June 11, 2007 | Current use: Office | Permit id: 200706113490 | |||||
Cti-1 8 f el me sp ![]() ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Expiration date: August 9, 1996 | Current use: Office | Permit id: 9614692 | |||||
2nd floor - scope consists of selective demolition & safe-off in vacant space. No new construction is considered in this scope of work. Tenant improvement under separate permit. (ab-017) n a maher ordinance all life safety systems to be maintained ![]() ![]() Permit type: Otc alterations permit | Permit status: Complete | Expiration date: February 23, 2016 | Current use: Office | Permit id: 201602230323 | |||||
Tenant improvement approx 2 sq ft on 2nd floor. Convert 2 workstations to private offices & add 2 workstations at extg storage file area. ![]() ![]() Permit type: Otc alterations permit | Permit status: Complete | Expiration date: July 7, 2011 | Current use: Office | Permit id: 201107079694 | |||||
Oti-1 5 f l f ![]() ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Expiration date: June 24, 1999 | Current use: Office | Permit id: 9912614 | |||||
5 f- mechanical improvement to office space. Install new return air grille ![]() ![]() Permit type: Otc alterations permit | Permit status: Complete | Expiration date: August 17, 2007 | Current use: Office | Permit id: 200708170119 | |||||
F s only ti under 9926784 ![]() ![]() Permit type: Otc alterations permit | Permit status: Expired | Expiration date: February 9, 2000 | Current use: Office | Permit id: 200002091393 | |||||
Electrical work for ti 201607263410 ![]() ![]() Permit type: Otc alterations permit | Permit status: Issued | Expiration date: September 15, 2016 | Current use: Office | Permit id: 201609157769 | |||||
Electrical work for ti per pa 201607263413 ![]() ![]() Permit type: Otc alterations permit | Permit status: Issued | Expiration date: September 15, 2016 | Current use: Office | Permit id: 201609157763 | |||||
Fabricate and install 4 emergency evacuation maps at 85 2nd street. 2 on 2nd floor 2 on 3rd floor. Digital print. Sub surface mounted to 1 8" non glare acrylic mounted to wall with vhb tape and silicone. N a for maher. ![]() ![]() Permit type: Otc alterations permit | Permit status: Issued | Expiration date: October 24, 2016 | Current use: Office | Permit id: 201610241032 | |||||
1-3 flr: fire alarm for "chartboost". Add 15 smoke detectors 31 duct detectors 2 strobe power supplies speakers strobes 11 strobes. Ref. 2016072634 201607263412 201607263413. Maher na ![]() ![]() Permit type: Otc alterations permit | Permit status: Complete | Expiration date: August 30, 2016 | Current use: Office | Permit id: 201608306308 | |||||
1st flr: revision to 201607263413 scope includes structural drawings for freestanding conference on ground floor; maher n a ![]() ![]() Permit type: Otc alterations permit | Permit status: Withdrawn | Expiration date: November 7, 2016 | Current use: Office | Permit id: 201611072157 | |||||
1st flr: revision to ref 201607263413 & 201608165114: changing millwork measurements and changing walls foe conference room. Structural included interior work only maher na ![]() ![]() Permit type: Otc alterations permit | Permit status: Issued | Expiration date: November 16, 2016 | Current use: Office | Permit id: 201611162853 | |||||
2 f- mechanical improvement to office space install 2 new return air grills install 2 new csd with flex duct. ![]() ![]() Permit type: Otc alterations permit | Permit status: Complete | Expiration date: August 17, 2007 | Current use: Office | Permit id: 200708170121 | |||||
Tenant improvements in first floor space for furniture showroom work includes new partitions door millwork lighting electrical & finishes mep life safety & fire sprinklers under separate permit; maher n a. Comply with nov # 201521931 ![]() ![]() Permit type: Otc alterations permit | Permit status: Complete | Expiration date: February 19, 2015 | Current use: Retail sales | Permit id: 201502198727 | |||||
3 unreasonable hardship request freight elevator hp ramp ![]() ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Expiration date: October 10, 1996 | Current use: Office | Permit id: 9619470 | |||||
1st floor ti - include new non-load bearing interior partitions (some demo) glazing ceiling & power datra work and new finishes; mep life safety & sprinkler under separate permit. N a ordinance #155-13 ![]() ![]() Permit type: Otc alterations permit | Permit status: Issued | Expiration date: July 26, 2016 | Current use: Office | Permit id: 201607263413 | |||||
Oti-1 6 f l s ![]() ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Expiration date: June 24, 1999 | Current use: Office | Permit id: 9912616 | |||||
Addition of speakers 4 speaker strobes strobe synchronization module for constant contact remodel of floor 1. All devices connect onto the life safety system ![]() ![]() Permit type: Otc alterations permit | Permit status: Complete | Expiration date: September 7, 2012 | Current use: Office | Permit id: 201209079132 | |||||
Cti-2 1 f el me ![]() ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Expiration date: May 30, 1997 | Current use: Office | Permit id: 9709821 | |||||
Oti-4 1st l s ![]() ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Expiration date: January 17, 2003 | Current use: Office | Permit id: 200301175419 | |||||
Cti-1 1 f el me sp ![]() ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Expiration date: August 9, 1996 | Current use: Office | Permit id: 9614691 | |||||
2nd flr add glass lite remve e low walls convert 2 0ffices 3rd fl alter prvt office add 2 off carrel ![]() ![]() Permit type: Otc alterations permit | Permit status: Complete | Expiration date: January 8, 2001 | Current use: Office | Permit id: 200101089371 | |||||
Structural repair of bsmnt walls replacement of partial slab ![]() ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Expiration date: September 12, 2001 | Current use: Office | Permit id: 200109128113 | |||||
3rd floor ti - some demo new non-load bearing interior partitions glazing ceiling & power datra work and new finishes; mep life safety & sprinkler under separate permit. Constr cost shown excludes mep. N a ordinance #155-13 ![]() ![]() Permit type: Otc alterations permit | Permit status: Issued | Expiration date: July 26, 2016 | Current use: Office | Permit id: 201607263410 | |||||
Oti-1 5th floor el me l s sp ![]() ![]() Permit type: Otc alterations permit | Permit status: Complete | Expiration date: May 1, 2007 | Current use: Office | Permit id: 200705010094 | |||||
Cti-1 1 f el me sp ![]() ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Expiration date: May 22, 1997 | Current use: Office | Permit id: 9709324 | |||||
Relocate 4 existing light fixtures. [scope of work does not include residential electric space heater installation.] Permit status: Complete | Permit id: Ew20070608946 | |||||
Safe off remove and replace existing fixtures pendants.. Job #32831 Permit status: Complete | Permit id: Ew20110825925 | |||||
Installation of 24 modular workstations Permit status: Complete | Permit id: Ew20120928781 | |||||
Lights receptacles plugs Permit status: Complete | Permit id: E20021114709 | |||||
Add new receptacles in open office space. Replace existing light fixtures with new fixtures. Permit status: Complete | Permit id: Ew20140328863 | |||||
4 lights. Murphy burr and curry Permit status: Expired | Permit id: E200407215427 | |||||
Life safety inspection Permit status: Complete | Permit id: E20021114707 | |||||
Outlets relocate 12 existing fixtures. [scope of work does not include residential electric space heater installation.] Permit status: Complete | Permit id: Ew20070608947 | |||||
Office reconfiguration - lights and switches - job #20557 Permit status: Complete | Permit id: Ew20110822282 | |||||
Supply and install cat 6 cables as per plans. 8th floor Permit status: Complete | Permit id: Ew20130415001 | |||||
Install (132) data cables. Permit status: Complete | Permit id: Ew20120830341 | |||||
(2) fire smoke dampers (2) exit signs 85 2nd street 5th floor rear corridor job#28182m [scope of work does not include residential electric space heater installation.] Permit status: Complete | Permit id: Ew20070517922 | |||||
Sierra club (2)fixtures (3)plugs Permit status: Complete | Permit id: Ew20110602641 | |||||
Install track ligths (11) install 12 switches install amp outlets (7) dishwasher Permit status: Complete | Permit id: E201503167040 | |||||
16 stations for modular partitions only Permit status: Complete | Permit id: Ew20130502501 | |||||
Remodel - fixtures switches receptacles - job #32873 Permit status: Complete | Permit id: Ew20111020161 | |||||
Install (12) data cables Permit status: Expired | Permit id: Ew20130806621 | |||||
Provide permit for furniture installation. Permit status: Complete | Permit id: Ew20140425161 | |||||
The tenant is the sierra club located on the 02nd and 03rd floors 5 lights 4 switches 6 receptacles 3 circuits 4 motion sensors Permit status: Complete | Permit id: E200407225484 | |||||
Fixtures & switches - job #32873 Permit status: Complete | Permit id: Ew20111109283 | |||||
85 2nd street - 6th floor - attik - sf - up to 5 outlets - wbe job #01-135594 - contact tony raccanello 415-720-2612 Permit status: Complete | Permit id: Ew20141212422 | |||||
85 2nd street - attik 6th floor wbe job # 01-107349 +6 openings contact tony buttigieg 415-720-0594 [scope of work does not include residential electric space heater installation.] Permit status: Complete | Permit id: Ew20070615021 | |||||
Elec & life safety - job 33112 Permit status: Complete | Permit id: Ew20120827381 | |||||
Demolition related to bpa#201501307066 Permit status: Complete | Permit id: E201502236534 | |||||
Cooper design - t. I Permit status: Complete | Permit id: Ew20130327801 | |||||
A new build out of an existing space as a new office for thoughtbot. New lights and outlets. Permit status: Complete | Permit id: Ew20130416441 | |||||
Stations for modular partitions only Permit status: Expired | Permit id: Ew20121029621 | |||||
New lighting power. Fire alarm Permit status: Filed | Permit id: Ew201608240148 | |||||
New lighting power and fire alarn Permit status: Filed | Permit id: Ew201608240150 | |||||
New lighting power and fire alarm Permit status: Filed | Permit id: Ew201608240151 | |||||
Install (49) data cables. Permit status: Filed | Permit id: Ew201609140538 | |||||
Install (139) data cables Permit status: Filed | Permit id: Ew201609140539 | |||||
Install (131) data cables. Permit status: Filed | Permit id: Ew201609140540 | |||||
Installation of 11 modular workstations Permit status: Filed | Permit id: Ew201610181219 | |||||
Installation of modular workstations Permit status: Filed | Permit id: Ew201610181220 | |||||
Installation of 56 modular workstations Permit status: Filed | Permit id: Ew201610181221 | |||||
Worktype:notlisted;removepre-actionvalveandmakewet. 6thfloor ![]() Expiration date: August 1, 2007 | Permit id: Pw20070801420 | |||||
Workcategory:5p;groundfloor-furnishandinstall(1)kitchensink (1)lavatoryand(1)fiberglassshower. ![]() Permit status: Complete | Expiration date: August 17, 2012 | Permit id: Pw20120817976 | |||||
Workcategory:4pb;firesprinklerpermit 2pendentsprinklers ![]() Permit status: Complete | Expiration date: September 14, 2011 | Permit id: Pw20110914603 | |||||
Workcategory:4pb;add2pendentssprinklersheadsonthe3rdfl #1133490 ![]() Permit status: Complete | Expiration date: May 25, 2011 | Permit id: Pw20110525687 | |||||
Workcategory:4pb;relocate5headsonthe8thfloorggfp#13-151 ![]() Permit status: Complete | Expiration date: April 8, 2013 | Permit id: Pw20130408815 | |||||
Relocate(4)sprinklerheadstoadjustfornewceilings. ![]() Permit status: Complete | Expiration date: March 2, 2015 | Permit id: Pp20150302454 | |||||
Workcategory:4pb;2ndflrelo8pendents ![]() Permit status: A | Expiration date: October 27, 2011 | Permit id: Pw20111027416 | |||||
5thfloor.. Add(2)griller+dampersmodify1-existingsaduct add1-returngrille. ![]() Permit status: Expired | Expiration date: May 22, 2007 | Permit id: Pp200705221797 | |||||
Workcategory:5p;installonenewkitchenpantry. Allworkisonthe7thfloor ![]() Permit status: Complete | Expiration date: April 16, 2013 | Permit id: Pw20130416994 | |||||
Workcategory:4pb;relocate3headsonthe1stfloorggfp#12-228 ![]() Permit status: Complete | Expiration date: September 27, 2012 | Permit id: Pw20120927897 | |||||
Workcategory:5p;installonekitchenpantry. Allworkisonthe8thfloor. ![]() Permit status: Complete | Expiration date: April 4, 2013 | Permit id: Pw20130404760 | |||||
Sprinklert. I. ![]() Permit status: Complete | Expiration date: April 8, 2013 | Permit id: Pp20130408729 | |||||
Workcategory:2pa;hookupkitchensink ![]() Permit status: Complete | Expiration date: April 10, 2015 | Permit id: Pw20150410483 | |||||
7 f:#700:tenantimprovement:hvacinstallationofwshpwithallnewductwork. ![]() Permit status: Complete | Expiration date: May 14, 2013 | Permit id: Pm20130514737 | |||||
Work category: 5p; install 1 kitchen pantry on 1st 2nd and 3rd floors. Install new restroom fixtures in core restrooms on 2nd and 3rd floors. Install 1 toilet and 1 basin on the 1st floor ![]() Permit status: Issued | Expiration date: August 26, 2016 | Permit id: Pw20160826058 | |||||
Work category: 4pb; 16-275 relocate 5 heads on 1st floor and 21 heads on the 2nd floor and 17 heads on the 3rd floor ![]() Permit status: Issued | Expiration date: September 7, 2016 | Permit id: Pw20160907313 | |||||
Fixtures & switches - job #32873 Permit status: Complete | Permit id: Ew20111109283 | |||||
Provide permit for furniture installation. Permit status: Complete | Permit id: Ew20140425161 | |||||
Install (12) data cables Permit status: Expired | Permit id: Ew20130806621 | |||||
Remodel - fixtures switches receptacles - job #32873 Permit status: Complete | Permit id: Ew20111020161 | |||||
Sierra club (2)fixtures (3)plugs Permit status: Complete | Permit id: Ew20110602641 | |||||
(2) fire smoke dampers (2) exit signs 85 2nd street 5th floor rear corridor job#28182m [scope of work does not include residential electric space heater installation.] Permit status: Complete | Permit id: Ew20070517922 | |||||
Install (132) data cables. Permit status: Complete | Permit id: Ew20120830341 | |||||
Supply and install cat 6 cables as per plans. 8th floor Permit status: Complete | Permit id: Ew20130415001 | |||||
Office reconfiguration - lights and switches - job #20557 Permit status: Complete | Permit id: Ew20110822282 | |||||
Outlets relocate 12 existing fixtures. [scope of work does not include residential electric space heater installation.] Permit status: Complete | Permit id: Ew20070608947 | |||||
Install track ligths (11) install 12 switches install amp outlets (7) dishwasher Permit status: Complete | Permit id: E201503167040 | |||||
16 stations for modular partitions only Permit status: Complete | Permit id: Ew20130502501 | |||||
4 lights. Murphy burr and curry Permit status: Expired | Permit id: E200407215427 | |||||
Add new receptacles in open office space. Replace existing light fixtures with new fixtures. Permit status: Complete | Permit id: Ew20140328863 | |||||
Installation of 24 modular workstations Permit status: Complete | Permit id: Ew20120928781 | |||||
Safe off remove and replace existing fixtures pendants.. Job #32831 Permit status: Complete | Permit id: Ew20110825925 | |||||
Life safety inspection Permit status: Complete | Permit id: E20021114707 | |||||
Relocate 4 existing light fixtures. [scope of work does not include residential electric space heater installation.] Permit status: Complete | Permit id: Ew20070608946 | |||||
The tenant is the sierra club located on the 02nd and 03rd floors 5 lights 4 switches 6 receptacles 3 circuits 4 motion sensors Permit status: Complete | Permit id: E200407225484 | |||||
Lights receptacles plugs Permit status: Complete | Permit id: E20021114709 | |||||
Demolition related to bpa#201501307066 Permit status: Complete | Permit id: E201502236534 | |||||
85 2nd street - attik 6th floor wbe job # 01-107349 +6 openings contact tony buttigieg 415-720-0594 [scope of work does not include residential electric space heater installation.] Permit status: Complete | Permit id: Ew20070615021 | |||||
Elec & life safety - job 33112 Permit status: Complete | Permit id: Ew20120827381 | |||||
85 2nd street - 6th floor - attik - sf - up to 5 outlets - wbe job #01-135594 - contact tony raccanello 415-720-2612 Permit status: Complete | Permit id: Ew20141212422 | |||||
New lighting power. Fire alarm Permit status: Filed | Permit id: Ew201608240148 | |||||
New lighting power and fire alarn Permit status: Filed | Permit id: Ew201608240150 | |||||
New lighting power and fire alarm Permit status: Filed | Permit id: Ew201608240151 | |||||
Installation of 56 modular workstations Permit status: Filed | Permit id: Ew201610181221 | |||||
Installation of 11 modular workstations Permit status: Filed | Permit id: Ew201610181219 | |||||
Installation of modular workstations Permit status: Filed | Permit id: Ew201610181220 | |||||
Install (139) data cables Permit status: Filed | Permit id: Ew201609140539 | |||||
Install (131) data cables. Permit status: Filed | Permit id: Ew201609140540 | |||||
Install (49) data cables. Permit status: Filed | Permit id: Ew201609140538 | |||||
Cooper design - t. I Permit status: Complete | Permit id: Ew20130327801 | |||||
Stations for modular partitions only Permit status: Expired | Permit id: Ew20121029621 | |||||
A new build out of an existing space as a new office for thoughtbot. New lights and outlets. Permit status: Complete | Permit id: Ew20130416441 | |||||
Permit to operate boiler ![]() Permit status: Issued | Expiration date: August 29, 2017 | Permit id: 96879 | |||||
Remodel at first floor display window, any mep, t-24 7 fire sprinkler work under separate permits. N a maher ordinance ![]() ![]() Permit type: Otc alterations permit | Expiration date: February 21, 2017 | Current use: Retail sales | Permit id: 201702219744 | |||||
4 f- project scope consists of selective demolition and safe-off in vacant 4 f. No new construction is considered in this scope of work. Area of work is currently unoccupied per ab-017. N a ordinance #155-13 ceilings to remain intact ![]() ![]() Permit type: Otc alterations permit | Completion date: June 5, 2017 | Expiration date: February 23, 2017 | Current use: Office | Permit id: 201702239941 | |||||
5 f- project scope consists of selective demolition and safe-off in vacant 5 f. No new construction is considered in this scope of work. Area of work is currently unoccupied per ab-017. N a ordinance #155-13 ceilings to remain intact ![]() ![]() Permit type: Otc alterations permit | Completion date: June 5, 2017 | Expiration date: February 23, 2017 | Current use: Office | Permit id: 201702239943 | |||||
Basement: repair ceiling of (e) basement that consists of rebar for the above slab, concrete mix and water proofing on top. Concrete mix: base master emaco s466c1 or equivalent. Work done at northern easterly corner as noted on plans. ![]() ![]() Permit type: Otc alterations permit | Expiration date: March 20, 2017 | Current use: Office | Permit id: 201703201876 | |||||
4th & 5th flr:4th - relocate 68, added 65th - relocated 33, add 1 maher na ![]() ![]() Permit type: Otc alterations permit | Expiration date: June 15, 2017 | Current use: Office | Permit id: 201706159404 | |||||
Fire alarm work for the "plaid" remodels on floors 4 and 5; additions are 12 smoke detectors, 29 duct detectors, 2 strobe power supplies, 55 speaker strobes and 22 strobes. Ref pa 2017-0503-5532 (4th fl) 2017-0503-55 (5th fl) n a for maher ![]() ![]() Permit type: Otc alterations permit | Expiration date: June 29, 2017 | Current use: Office | Permit id: 201706290652 | |||||
Bldg upgrade,sprinkle,new toilet rm,hp ramp access,mech sys ![]() ![]() Permit type: Additions alterations or repairs | Completion date: December 19, 1996 | Expiration date: May 26, 1995 | Current use: Office | Permit id: 9507893 | |||||
Minor revision to 9603140,addtn of closet for housing valve ![]() ![]() Permit type: Otc alterations permit | Expiration date: May 29, 1996 | Current use: Office | Permit id: 9609355 | |||||
Cti-2 7thfl,el,me ![]() ![]() Permit type: Additions alterations or repairs | Expiration date: September 30, 1996 | Current use: Office | Permit id: 9618639 | |||||
Cti-2 8thfl,el,me ![]() ![]() Permit type: Additions alterations or repairs | Expiration date: September 30, 1996 | Current use: Office | Permit id: 9618641 | |||||
New base bldg life safety system revision to 9507893 ![]() ![]() Permit type: Additions alterations or repairs | Expiration date: November 14, 1996 | Current use: Office | Permit id: 9622114 | |||||
Horizontal addition ![]() ![]() Permit type: Additions alterations or repairs | Expiration date: November 18, 1996 | Current use: Office | Permit id: 9622333 | |||||
Cti-1 7thfl,el,me,sp ![]() ![]() Permit type: Additions alterations or repairs | Expiration date: March 19, 1997 | Current use: Office | Permit id: 9705031 | |||||
Cti-2 7thfl,el,me ![]() ![]() Permit type: Additions alterations or repairs | Expiration date: March 19, 1997 | Current use: Office | Permit id: 9705032 | |||||
Oti-1 el,me,sp 7th flr ![]() ![]() Permit type: Additions alterations or repairs | Completion date: May 14, 1999 | Expiration date: October 26, 1998 | Current use: Office | Permit id: 9821856 | |||||
Oti 2 el me ls sp 7th floor ![]() ![]() Permit type: Additions alterations or repairs | Expiration date: December 28, 1998 | Current use: Office | Permit id: 9826301 | |||||
New partitions, new mechanical & electrical distribution ![]() ![]() Permit type: Additions alterations or repairs | Completion date: July 21, 2000 | Expiration date: December 21, 1999 | Current use: Office | Permit id: 9926784 | |||||
2nd flr add glass lite,remve e low walls convert 2 0ffices 3rd fl alter prvt office add 2 off carrel ![]() ![]() Permit type: Otc alterations permit | Completion date: May 7, 2001 | Expiration date: January 8, 2001 | Current use: Office | Permit id: 200101089371 | |||||
Oti-1 5th floor el, me, l s, sp ![]() ![]() Permit type: Otc alterations permit | Completion date: November 9, 2007 | Expiration date: May 1, 2007 | Current use: Office | Permit id: 200705010094 | |||||
Oti-1, 5th floor, el, me, ls, sp. ![]() ![]() Permit type: Otc alterations permit | Completion date: November 2, 2007 | Expiration date: June 12, 2007 | Current use: Office | Permit id: 200706123650 | |||||
Oti-1, 2nd floor, el, me, ls, sp. ![]() ![]() Permit type: Otc alterations permit | Completion date: November 2, 2007 | Expiration date: June 12, 2007 | Current use: Office | Permit id: 200706123653 | |||||
Oti-1, 1st floor, tenant improvement. Demo millwork. New walls. Electrical on separate permit. ![]() ![]() Permit type: Otc alterations permit | Expiration date: June 26, 2007 | Current use: Office | Permit id: 200706265110 | |||||
2 f- mechanical improvement to office space, install 2 new return air grills, install 2 new csd with flex duct. ![]() ![]() Permit type: Otc alterations permit | Completion date: November 2, 2007 | Expiration date: August 17, 2007 | Current use: Office | Permit id: 200708170121 | |||||
1st floor: minor demolition, floor patching, paint, carpet ![]() ![]() Permit type: Otc alterations permit | Expiration date: January 15, 2008 | Current use: Office | Permit id: 200801152547 | |||||
Oti-1,grd flr, ls, spr ![]() ![]() Permit type: Additions alterations or repairs | Completion date: November 14, 2002 | Expiration date: May 31, 2002 | Current use: Office | Permit id: 200205317909 | |||||
Installation of (1) duct detector to existing fire alarm, mech separate permit ![]() ![]() Permit type: Otc alterations permit | Completion date: November 14, 2002 | Expiration date: August 23, 2002 | Current use: Office | Permit id: 200208234761 | |||||
Oti-1, 1st floor, el, me, ls, sp. ![]() ![]() Permit type: Additions alterations or repairs | Expiration date: October 1, 2002 | Current use: Office | Permit id: 200210017887 | |||||
Oti-2, 1st floor, el. ![]() ![]() Permit type: Additions alterations or repairs | Expiration date: October 1, 2002 | Current use: Office | Permit id: 200210017890 | |||||
Oti-1 ,3rd fl-el, m,sp, ls ![]() ![]() Permit type: Additions alterations or repairs | Completion date: August 17, 2004 | Expiration date: June 11, 2004 | Current use: Office | Permit id: 200406116231 | |||||
Oti-2 2nd and 3rd floor el, me, sp ![]() ![]() Permit type: Otc alterations permit | Completion date: August 17, 2004 | Expiration date: July 29, 2004 | Current use: Office | Permit id: 200407290104 | |||||
5th fl - construction of (n) non-load bearing interior partitions, glazing, ceiling and power data work and new finishes. Life safety and sprinkler system modification are to be under a separate permit. No exterior building site, landscape use or parking changes are proposed. The suite is currently ![]() ![]() Permit type: Otc alterations permit | Completion date: October 2, 2017 | Expiration date: May 3, 2017 | Current use: Office | Permit id: 201705035530 | |||||
4th fl - (n) interior partitions, glazing, ceiling, power data work, new finishes, and restroom upgrades. Life safety & sprinkler system modifications, structural for garage door and wood panel wd1 are under separate permit. No exterior building, site, landscape, use or parking changes are proposed. ![]() ![]() Permit type: Otc alterations permit | Completion date: October 2, 2017 | Expiration date: May 3, 2017 | Current use: Office | Permit id: 201705035532 | |||||
As built permit to correct the fire alarm system matrix per the sffd testing inspector. The change indicates the shutdown of heat pumps from any alarm condition on each floor. Ref pa 2017-0503-5532 4th fl and 2017-0503-5530, 5th fl ![]() ![]() Permit type: Otc alterations permit | Completion date: October 2, 2017 | Expiration date: September 11, 2017 | Current use: Office | Permit id: 201709117586 | |||||
Interior tenant improvement of an existing office space, including addition of non-load bearing partitions. Electrical, mechanical, plumbing. Life safety to be completed under separate permit. ![]() ![]() Permit type: Otc alterations permit | Expiration date: October 15, 2008 | Current use: Office | Permit id: 200810154268 | |||||
Fire sprinkler permit, add 2 pendent sprinklers ![]() ![]() Permit type: Otc alterations permit | Completion date: October 6, 2011 | Expiration date: September 13, 2011 | Current use: Office | Permit id: 201109134470 | |||||
Tenant improvement - 2nd, 3rd and 4th floor. Non-structural. Electrical, mechannical and life safety under separate permit. ![]() ![]() Permit type: Otc alterations permit | Completion date: January 13, 2012 | Expiration date: October 14, 2011 | Current use: Office | Permit id: 201110146798 | |||||
Fire sprinkler only. 2nd fl: relocate 8 pendents, 2 uprights, add 1, remove 1. Relocate 6 pendents ![]() ![]() Permit type: Otc alterations permit | Completion date: December 27, 2011 | Expiration date: October 26, 2011 | Current use: Office | Permit id: 201110267644 | |||||
T. I. On a multi-tenant ground floor, new partitions, demo millwork and interior partitions. Minor relocation of lighting, new doors and glazing. Mep under seperate permit. ![]() ![]() Permit type: Otc alterations permit | Completion date: October 26, 2012 | Expiration date: July 30, 2012 | Current use: Office | Permit id: 201207306057 | |||||
Addition of speakers, 4 speaker strobes, strobe synchronization module for constant contact remodel of floor 1. All devices connect onto the life safety system ![]() ![]() Permit type: Otc alterations permit | Completion date: October 18, 2012 | Expiration date: September 7, 2012 | Current use: Office | Permit id: 201209079132 | |||||
Suite 700: new t. I. To include doors, partitions, ceiling and millwork. M. E. P. Is included in this permit. ![]() ![]() Permit type: Otc alterations permit | Completion date: June 13, 2013 | Expiration date: March 6, 2013 | Current use: Office | Permit id: 201303061586 | |||||
3 relocated uprights sprinklers. 9 new upright sprinklers, 8 new pendent sprinklers. T. I ref pa# 201303061586 ![]() ![]() Permit type: Otc alterations permit | Completion date: May 15, 2013 | Expiration date: April 8, 2013 | Current use: Office | Permit id: 201304083972 | |||||
Addition of duct detectors, 3 speakers, 9 strobes, and a strobe power supply for the "thoughtbot" tenant remodel on floor 7. All new devices connect onto the fire alarm system; ref. 2013-0306-1586 ![]() ![]() Permit type: Otc alterations permit | Completion date: June 11, 2013 | Expiration date: May 9, 2013 | Current use: Office | Permit id: 201305096474 | |||||
1st flr: soft (non structural) demolition including partitions, doors, millwork, sink, light fixtures, floor finishes in preparation for tenant improvements under separate permit. Note all life safety devices to remain. Maher n a ![]() ![]() Permit type: Otc alterations permit | Completion date: February 27, 2015 | Expiration date: January 30, 2015 | Current use: Office | Permit id: 201501307066 | |||||
Tenant improvements in first floor space for furniture showroom, work includes, new partitions, door, millwork, lighting, electrical & finishes, mep, life safety & fire sprinklers under separate permit; maher n a. Comply with nov # 201521931 ![]() ![]() Permit type: Otc alterations permit | Completion date: May 5, 2015 | Expiration date: February 19, 2015 | Current use: Retail sales | Permit id: 201502198727 | |||||
Demo (e) fire sprinkler heads due to the removal of ceiling. (e) sprinklers head removed & plugged and four relocatemaher - not reqd ![]() ![]() Permit type: Otc alterations permit | Completion date: March 20, 2015 | Expiration date: March 2, 2015 | Current use: Office | Permit id: 201503029690 | |||||
Ground floor, suite #100: enlarging server room. Duct distribution being modified. 1 new 2 tons split ac system for telcom room 114. Maher na ![]() ![]() Permit type: Otc alterations permit | Expiration date: October 6, 2015 | Current use: Office | Permit id: 201510068899 | |||||
Project scope consists of selective demolition and safe-off in vacant 3 f, no new construction is considered in this scope of work. T. I. Under seperate permit. N a ordinance #155-13 ab-017 applies. ![]() ![]() Permit type: Otc alterations permit | Completion date: July 22, 2016 | Expiration date: May 16, 2016 | Current use: Office | Permit id: 201605167549 | |||||
7th floor: replace like for like 3 water source heat pumps. Maher na ![]() ![]() Permit type: Otc alterations permit | Completion date: March 20, 2017 | Expiration date: May 18, 2016 | Current use: Office | Permit id: 201605187760 | |||||
3rd floor ti - some demo, new non-load bearing interior partitions, glazing, ceiling & power datra work and new finishes; mep, life safety & sprinkler under separate permit. Constr cost shown excludes mep. N a ordinance #155-13 ![]() ![]() Permit type: Otc alterations permit | Completion date: May 11, 2017 | Expiration date: July 26, 2016 | Current use: Office | Permit id: 201607263410 | |||||
2nd floor ti - some demo, new non-load bearing interior partitions, glazing, ceiling & power datra work and new finishes; mep, life safety & sprinkler under separate permit. N a ordinance #155-13 ![]() ![]() Permit type: Otc alterations permit | Completion date: May 11, 2017 | Expiration date: July 26, 2016 | Current use: Office | Permit id: 201607263412 | |||||
1st floor ti - include new non-load bearing interior partitions (some demo), glazing, ceiling & power datra work and new finishes; mep, life safety & sprinkler under separate permit. N a ordinance #155-13 ![]() ![]() Permit type: Otc alterations permit | Completion date: May 11, 2017 | Expiration date: July 26, 2016 | Current use: Office | Permit id: 201607263413 | |||||
2 f- revision to cover sheet for arch. T. I. Pa#201607263412, non infringement statement corrected. N a ordinance #155-13 ![]() ![]() Permit type: Otc alterations permit | Completion date: May 11, 2017 | Expiration date: August 16, 2016 | Current use: Office | Permit id: 201608165116 | |||||
1-3 flr: fire alarm for "chartboost". Add 15 smoke detectors, 31 duct detectors, 2 strobe power supplies, speakers strobes, 11 strobes. Ref. 201607263410, 201607263412, 201607263413. Maher na ![]() ![]() Permit type: Otc alterations permit | Completion date: November 15, 2016 | Expiration date: August 30, 2016 | Current use: Office | Permit id: 201608306308 | |||||
2nd flr: install new ac unit to (e) server roomexhaust fans 1st & 3rd flr maher na ![]() ![]() Permit type: Otc alterations permit | Completion date: April 10, 2017 | Expiration date: September 2, 2016 | Current use: Office | Permit id: 201609026665 | |||||
1st, 2nd, 3rd floor: fire sprinklers - relocate 2 upright sprinklers on 1st. Relocate 3 pendent sprinklers. Relocate upright sprinklers on 2nd. Relocates 11 uprights on the 3 floors and 17 pendents. Ref ti 1st- 201607263413, 2nd - 201607263412, 3rd - 2016072634 maher na ![]() ![]() Permit type: Otc alterations permit | Completion date: October 7, 2016 | Expiration date: September 6, 2016 | Current use: Office | Permit id: 201609066834 | |||||
Electrical work for tenant improvement, reference ti 2016. 0816. 5116 maher not req ![]() ![]() Permit type: Otc alterations permit | Completion date: May 11, 2017 | Expiration date: September 15, 2016 | Current use: Office | Permit id: 201609157765 | |||||
Fabricate and install 4 emergency evacuation maps at 85 2nd street. 2 on 2nd floor, 2 on 3rd floor. Digital print. Sub surface mounted to 1 8" non glare acrylic mounted to wall with vhb tape and silicone. N a for maher. ![]() ![]() Permit type: Otc alterations permit | Completion date: May 8, 2017 | Expiration date: October 24, 2016 | Current use: Office | Permit id: 201610241032 | |||||
1st flr: revision to 201607263413, scope includes structural drawings for freestanding conference on ground floor; maher n a ![]() ![]() Permit type: Otc alterations permit | Expiration date: November 7, 2016 | Current use: Office | Permit id: 201611072157 | |||||
(2) fire smoke dampers(2) exit signs85 2nd street5th floor rear corridorjob#28182m [scope of work does not include residential electric space heater installation.] ![]() Permit status: Complete | Completion date: May 24, 2007 | Permit id: Ew20070517922 | |||||
Stations for modular partitions only ![]() Permit status: Expired | Permit id: Ew20121029621 | |||||
Install (49) data cables. ![]() Permit status: Complete | Completion date: January 10, 2017 | Permit id: Ew201609140538 | |||||
Outlets, relocate 12 existing fixtures. [scope of work does not include residential electric space heater installation.] ![]() Permit status: Complete | Completion date: September 20, 2007 | Permit id: Ew20070608947 | |||||
Installation of 24 modular workstations ![]() Permit status: Complete | Completion date: October 18, 2012 | Permit id: Ew20120928781 | |||||
Installation of 11 modular workstations ![]() Permit status: Complete | Completion date: January 10, 2017 | Permit id: Ew201610181219 | |||||
Demolition related to bpa#201501307066 ![]() Permit status: Complete | Completion date: February 25, 2015 | Permit id: E201502236534 | |||||
Fixtures & switches - job #32873 ![]() Permit status: Complete | Completion date: July 5, 2016 | Permit id: Ew20111109283 | |||||
Install cat6 data cables, 222 cables total. ![]() Permit status: Complete | Completion date: September 11, 2017 | Permit id: E201707186383 | |||||
Elec & life safety - job 33112 ![]() Permit status: Complete | Completion date: October 18, 2012 | Permit id: Ew20120827381 | |||||
Install (12) data cables ![]() Permit status: Expired | Permit id: Ew20130806621 | |||||
108 modular workstations ![]() Permit status: Complete | Completion date: September 11, 2017 | Permit id: Ew201707066476 | |||||
Safe off, remove and replace existing fixtures, pendants.. Job #32831 ![]() Permit status: Complete | Completion date: September 23, 2011 | Permit id: Ew20110825925 | |||||
New lighting, power. Fire alarm ![]() Permit status: Complete | Completion date: January 10, 2017 | Permit id: Ew201608240148 | |||||
Supply and install cat 6 cables as per plans. 8th floor ![]() Permit status: Complete | Completion date: May 17, 2013 | Permit id: Ew20130415001 | |||||
Install cat6 data cables, 149 cables total. ![]() Permit status: Complete | Completion date: September 11, 2017 | Permit id: E201707186382 | |||||
Provide permit for furniture installation. ![]() Permit status: Complete | Completion date: April 28, 2014 | Permit id: Ew20140425161 | |||||
A new build out of an existing space as a new office for thoughtbot. New lights and outlets. ![]() Permit status: Complete | Completion date: June 6, 2013 | Permit id: Ew20130416441 | |||||
16 stations for modular partitions only ![]() Permit status: Complete | Completion date: May 17, 2013 | Permit id: Ew20130502501 | |||||
Install of 85 modular workstations ![]() Permit status: Complete | Completion date: September 11, 2017 | Permit id: Ew201707066477 | |||||
New lighting, power and fire alarn ![]() Permit status: Complete | Completion date: January 10, 2017 | Permit id: Ew201608240150 | |||||
Install track ligths (11), install 12 switches, install amp outlets (7), dishwasher ![]() Permit status: Complete | Completion date: April 20, 2015 | Permit id: E201503167040 | |||||
Installation of 56 modular workstations ![]() Permit status: Complete | Completion date: October 26, 2016 | Permit id: Ew201610181221 | |||||
4 lights. Murphy, burr, and curry ![]() Permit status: Expired | Permit id: E200407215427 | |||||
Install (132) data cables. ![]() Permit status: Complete | Completion date: October 18, 2012 | Permit id: Ew20120830341 | |||||
The tenant is the sierra club located on the 02nd and 03rd floors, 5 lights, 4 switches, 6 receptacles, 3 circuits, 4 motion sensors ![]() Permit status: Complete | Completion date: August 23, 2004 | Permit id: E200407225484 | |||||
Relocate 4 existing light fixtures. [scope of work does not include residential electric space heater installation.] ![]() Permit status: Complete | Completion date: September 20, 2007 | Permit id: Ew20070608946 | |||||
85 2nd street - 6th floor - attik - sf - up to 5 outlets - wbe job #01-135594 - contact tony raccanello 415-720-2612 ![]() Permit status: Complete | Completion date: January 2, 2015 | Permit id: Ew20141212422 | |||||
Cooper design - t. I ![]() Permit status: Complete | Completion date: May 17, 2013 | Permit id: Ew20130327801 | |||||
Plaid - ti & life safety ![]() Permit status: Complete | Completion date: September 11, 2017 | Permit id: Ew201705185503 | |||||
Install (131) data cables. ![]() Permit status: Complete | Completion date: October 26, 2016 | Permit id: Ew201609140540 | |||||
85 2nd street - attik 6th floor wbe job # 01-107349+6 openings contact tony buttigieg 415-720-0594 [scope of work does not include residential electric space heater installation.] ![]() Permit status: Complete | Completion date: July 3, 2007 | Permit id: Ew20070615021 | |||||
New lighting, power and fire alarm ![]() Permit status: Complete | Completion date: January 10, 2017 | Permit id: Ew201608240151 | |||||
Remodel - fixtures, switches, receptacles - job #32873 ![]() Permit status: Complete | Completion date: January 12, 2012 | Permit id: Ew20111020161 | |||||
Office reconfiguration - lights and switches - job #20557 ![]() Permit status: Complete | Completion date: September 23, 2011 | Permit id: Ew20110822282 | |||||
Life safety inspection ![]() Permit status: Complete | Completion date: February 7, 2003 | Permit id: E20021114707 | |||||
Install (139) data cables ![]() Permit status: Complete | Completion date: October 26, 2016 | Permit id: Ew201609140539 | |||||
Installation of modular workstations ![]() Permit status: Complete | Completion date: October 26, 2016 | Permit id: Ew201610181220 | |||||
Sierra club (2)fixtures (3)plugs ![]() Permit status: Complete | Completion date: July 15, 2011 | Permit id: Ew20110602641 | |||||
Add new receptacles in open office space. Replace existing light fixtures with new fixtures. ![]() Permit status: Complete | Completion date: April 28, 2014 | Permit id: Ew20140328863 | |||||
Lights receptacles,plugs ![]() Permit status: Complete | Completion date: March 27, 2003 | Permit id: E20021114709 | |||||
7 f: #700: tenant improvement: hvac installation of wshp with all new ductwork. ![]() Permit status: Complete | Completion date: May 24, 2013 | Expiration date: May 14, 2013 | Permit id: Pm20130514737 | |||||
5th floor. . Add (2) griller + dampers modify 1-existing sa duct, add 1- return grille. ![]() Permit status: Expired | Expiration date: May 22, 2007 | Permit id: Pp200705221797 | |||||
Sprinkler t. I. ![]() Permit status: Complete | Completion date: May 7, 2013 | Expiration date: April 8, 2013 | Permit id: Pp20130408729 | |||||
Work category: 2pa; hook up kitchen sink ![]() Permit status: Complete | Completion date: April 20, 2015 | Expiration date: April 10, 2015 | Permit id: Pw20150410483 | |||||
Work category: 5p; install one kitchen pantry. All work is on the 8th floor. ![]() Permit status: Complete | Completion date: May 3, 2013 | Expiration date: April 4, 2013 | Permit id: Pw20130404760 | |||||
Work category: 4pb; relocate 3 heads on the 1st floor ggfp # 12-228 ![]() Permit status: Complete | Completion date: September 28, 2012 | Expiration date: September 27, 2012 | Permit id: Pw20120927897 | |||||
Work category: 4pb; relocate 5 heads on the 8th floor ggfp# 13-151 ![]() Permit status: Complete | Completion date: April 10, 2013 | Expiration date: April 8, 2013 | Permit id: Pw20130408815 | |||||
Install condenser and condensate piping, ref 201609026665 ![]() Permit status: Complete | Completion date: April 10, 2017 | Expiration date: April 7, 2017 | Permit id: Pp20170407368 | |||||
4th & 5th floors: fire sprinkler t. I. 4th floor: 74 heads, 5th floor: 34 heads ![]() Permit status: Complete | Completion date: July 25, 2017 | Expiration date: June 15, 2017 | Permit id: Pp20170615227 | |||||
Relocate (4) sprinkler heads to adjust for new ceilings. ![]() Permit status: Complete | Completion date: March 10, 2015 | Expiration date: March 2, 2015 | Permit id: Pp20150302454 | |||||
Work category: 4pb; 2nd fl relo 8 pendents3rd fl relo 2 uprt add 1, remove 14th fl relo 6 pendents#1133585 ![]() Permit status: Complete | Completion date: December 20, 2011 | Expiration date: October 27, 2011 | Permit id: Pw20111027416 | |||||
Work type: not listed; remove pre-action valve and make wet. 6th floor ![]() Expiration date: August 1, 2007 | Permit id: Pw20070801420 | |||||
Work category: 5p; install one new kitchen pantry. All work is on the 7th floor ![]() Permit status: Complete | Completion date: May 28, 2013 | Expiration date: April 16, 2013 | Permit id: Pw20130416994 | |||||
Work category: 4pb; add 2 pendents sprinklers heads on the 3rd fl, #1133490 ![]() Permit status: Complete | Completion date: July 29, 2011 | Expiration date: May 25, 2011 | Permit id: Pw20110525687 | |||||
Work category: 5p; ground floor - furnish and install (1) kitchen sink, (1) lavatory and (1) fiberglass shower. ![]() Permit status: Complete | Completion date: October 9, 2012 | Expiration date: August 17, 2012 | Permit id: Pw20120817976 | |||||
Work category: 5p; per tenant improvement, plumbing on 4th and 5th floors#17-055 ![]() Permit status: Complete | Completion date: September 18, 2017 | Expiration date: June 19, 2017 | Permit id: Pw20170619908 | |||||
Work category: 4pb; fire sprinkler permit, 2 pendent sprinklers ![]() Permit status: Complete | Completion date: September 20, 2011 | Expiration date: September 14, 2011 | Permit id: Pw20110914603 | |||||
Work category: 5p; install 1 kitchen pantry on 1st, 2nd and 3rd floors. Install new restroom fixtures in core restrooms on 2nd and 3rd floors. Install 1 toilet and 1 basin on the 1st floor ![]() Permit status: Complete | Completion date: January 18, 2017 | Expiration date: August 26, 2016 | Permit id: Pw20160826058 | |||||
SCORE 98 Basement: repair ceiling of (e) basement that consists of rebar for the above slab concrete mix and water proofing on top. Concrete mix: base master emaco s466c1 or equivalent. Work done at northern easterly corner as noted on plans. Permit type: Building permit | Expiration date: October 3, 2017 | Current use: Office | Permit id: #201703201876 | |||||
SCORE 95 3rd floor ti - some demo new non-load bearing interior partitions glazing ceiling & power datra work and new finishes; mep life safety & sprinkler under separate permit. Constr cost shown excludes mep. N a ordinance #155-13 Permit type: Building permit | Expiration date: August 3, 2018 | Current use: Office | Permit id: #201607263410 | |||||
SCORE 95 2nd floor ti - some demo new non-load bearing interior partitions glazing ceiling & power datra work and new finishes; mep life safety & sprinkler under separate permit. N a ordinance #155-13 Permit type: Building permit | Expiration date: August 3, 2018 | Current use: Office | Permit id: #201607263412 | |||||
SCORE 95 1st floor ti - include new non-load bearing interior partitions (some demo) glazing ceiling & power datra work and new finishes; mep life safety & sprinkler under separate permit. N a ordinance #155-13 Permit type: Building permit | Expiration date: August 3, 2018 | Current use: Office | Permit id: #201607263413 | |||||
SCORE 100 1-3 flr: fire alarm for "chartboost". Add 15 smoke detectors 31 duct detectors 2 strobe power supplies speakers/strobes 11 strobes. Ref. 2016072634 201607263412 201607263413. Maher na Permit type: Building permit | Expiration date: August 30, 2017 | Current use: Office | Permit id: #201608306308 | |||||
SCORE 93 Tenant improvements in first floor space for furniture showroom work includes new partitions door millwork lighting electrical & finishes mep life safety & fire sprinklers under separate permit; maher n/a. Comply with nov # 201521931 Permit type: Building permit | Expiration date: February 21, 2016 | Current use: Retail sales | Permit id: #201502198727 |