Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Dccr proposes to drill one geotechnical boring (nebbc-75) located in the green space at the south eastern corner of the intersection between rhode island avenue and 1st street nw. The boring will be 8 inches diameter and 1 feet bgs, drilled by mud rotary methods. A vibrating wire piezometer will be installed at 75 feet bgs. All drilling generated waste will be drummed (solids and liquids), tested and shipped offsite for disposal. In the event the well is not completed within 1 day, the well shall be covered protected from surface water drainage, and the vertical migration of contaminants and other materials through the well casing and well annulus. A locking well cap will be installed and the rig parked over the excavation to prohibit vandalism. No drilling spoils or excavated soils will be used as backfill. See idw management plan and attached schematics for additional information. Date: July 5, 2016 Client: Dc Water | Permit type: Excavation; boring test pit (single) | Permit status: Issued | Expiration date: January 15, 2017 | Permit id: Pa180141 | |||||
SCORE 99 Construction staging area Date: July 25, 2016 Contractor: E2cr C O Siva Balu Permit status: Expired | Expiration date: August 25, 2016 | Permit id: Pa10326323 | |||||
SCORE 100 Dccr proposes to drill one geotechnical boring (nebbc-75) located in the green space at the south eastern corner of the intersection between rhode island avenue and 1st street nw. The boring will be 8 inches diameter and 1 feet bgs, drilled by mud rotary methods. A vibrating wire piezometer will be installed at 75 feet bgs. All drilling generated waste will be drummed (solids and liquids), tested and shipped offsite for disposal. In the event the well is not completed within 1 day, the well shall be covered protected from surface water drainage, and the vertical migration of contaminants and other materials through the well casing and well annulus. A locking well cap will be installed and the rig parked over the excavation to prohibit vandalism. No drilling spoils or excavated soils will be used as backfill. See idw management plan and attached schematics for additional information. Date: July 5, 2016 Contractor: E2cr Inc Client: Dc Water | Permit type: Excavation; boring test pit (single) | Permit status: Issued | Expiration date: January 15, 2017 | Permit id: Pa180141 | |||||
SCORE 99 Construction staging area Date: September 2, 2016 Contractor: E2cr C O Siva Balu Permit status: Permit expired | Expiration date: September 29, 2016 | Permit id: Pa10334560 |