Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Roof mount residential solar pv for existing sfd (no meter upgrade). Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. 12-11-13:plan change elec only:maz ![]() ![]() Permit type: Electrical : 8002 - | Permit status: Permit finaled | Completion date: December 16, 2013 | Permit id: Pds2013-Resalt- | |||||
SCORE 96 Roof mount residential solar pv for existing sfd (no meter upgrade). Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. 12-11-13 plan change elec only maz ![]() ![]() Permit type: Residential alteration-addn | Permit status: Completed | Completion date: December 16, 2013 | Permit id: Pds2013-Resalt- | |||||
SCORE 96 Hvac change out - fau or wall heater - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. ![]() ![]() Permit type: Addn | Permit status: Issued | Permit id: Pds2017-Resalt- | |||||
SCORE 89 Hvac change out - split system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. ![]() ![]() Permit type: Addn | Permit status: Completed | Completion date: October 27, 2017 | Permit id: Pds2017-Resalt- | |||||
SCORE 79 Roof mount residential solar pv for existing sfd with existing residential main electrical service upgrade - 125a - the scope of work is limited to upgrades of the existing main service panel, relocation of the existing loads, new sub-panels to accomodate solar loads, and relocation of existing panels in compliance with all zoning ordinances only, does not include additional new main service panels. This permit does not exempt any existing structures from compliance with applicable building code and zoning ordinance requirements. Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. 01-02-18 plan change see c of a for details... Lmy ![]() ![]() Permit type: Addn | Permit status: Issued | Permit id: Pds2017-Resalt- | |||||
Final ![]() Permit status: Pass | Permit id: Pds2013-Resalt- |