Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Wellington mhp #83 Date: October 30, 2013 Permit status: Issued | Permit id: 13-06432 | |||||
SCORE 100 Wellington mhp #83 Client: Wellington Mhp #83 | Permit type: Res: mfg. Home | Permit status: Closed | Current use: Residential | Permit id: 13-06432 | Parcel: 5941 | |||||
SCORE 95 Wellington mhp #83 Client: Wellington Mhp #83 | Permit type: Res: mfg. Home | Permit status: Closed | Current use: Residential | Permit id: 13-06432 | Parcel: 5941 | |||||
SCORE 100 Wellington mhp #83 Client: Wellington Mhp #83 | Permit type: Res: mfg. Home | Permit status: Closed | Current use: Residential | Permit id: 13-06432 | Parcel: 5941 | |||||
October 21, 2013 4:17: pm ssalyer. Placement of 20 mobile home with heat pump at wellington mhp;sls; october 30, 2013 11:47:46 am heatherr. Transfered this permit from 42 forest dr to 83 due to mobile home already on 42 address(okay per susannah to location transfer this permit); har; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing larger than 5 square feet requires separate deck permit. Building "final" includes water/wa Permit type: Res: mfg. Home | Permit status: Closed | Permit id: 13-06432 | Parcel: 5941 | |||||
Wellington mhp #83 Date: October 30, 2013 Value: $26,500 Permit type: Residential | Permit status: Issued | Permit id: 13-06432 | |||||
October 21, 2013 4:17: pm ssalyer. Placement of 20 mobile home with heat pump at wellington mhp;sls; october 30, 2013 11:47:46 am heatherr. Transfered this permit from 42 forest dr to 83 due to mobile home already on 42 address(okay per susannah to location transfer this permit); har; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing larger than 5 square feet requires separate deck permit. Building "final" includes water wa Date: June 3, 2015 Permit type: Res: mfg. Home | Permit status: Closed | Permit id: 13-06432 | Parcel: 5941 |