Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 98 Gas permit Client: Eight-21 East Sixth St Condo | Permit type: Gas | Permit status: Expired | Current use: 1-3fam | Permit id: G64789 | Parcel: 0604401000 | |||||
SCORE 98 Plumbing permit Client: Eight-21 East Sixth St Condo | Permit type: Plumbing | Permit status: Expired | Current use: 1-3fam | Permit id: Pl64788 | Parcel: 0604401000 | |||||
SCORE 82 3 family permit# alt48788-11 04 10 Date: September 2, 2011 Contractor: Mathew Rapczynski Client: Eight-21 East Sixth St Condo | Permit status: Expired | Current use: 1-3fam | Permit id: Coo90806 | Parcel: 0604401000 | |||||
SCORE 100 Modfiy exsting permit to include all perviously permtted work with a stair case and skylight to the roof in the rear stair tower of building. Client: Eight-21 East Sixth St Condo | Permit type: Other | Current use: 1-3fam | Permit id: A80464 | Parcel: 604401000 | |||||
SCORE 100 Construction of a new 3 family dwelling. Recess lighting sub panels ac and heat. Electric ovens along with general purpose power and lighting Client: Eight-21 East Sixth St Condo | Permit type: Electrical | Current use: 1-3fam | Permit id: E66254 | Parcel: 604401000 | |||||
SCORE 87 Pursuant to previously approved boston redevelopment authority (bra) plans and specifications dated 3/25/20 and inspectional services department approved long form application permit #2374 dated 3/25/20 additional and clarification of proposed scope is as follows; demolition and removal of garage structure at rear of building no replacement of garage required. Demolition and removal of existing two-family house existing foundation to remain. Excavation for building extension for new 10x24 addition to house and new second means of egress tower. Construct new three-story three family residential building. All work per plans and specifications dated 2/1/2010.; cost reflected on l/f #2375/2010 Date: October 21, 2010 Contractor: Christopher W Rapczynski Client: Eight-21 East Sixth St Condo | Permit type: Demolition - exterior | Permit status: Expired | Current use: 1-2fam | Permit id: Sf46338 | Parcel: 0604401000 | |||||
SCORE 87 Pursuant to previously approved boston redevelopment authority (bra) plans and specifications dated 3/25/20 and inspectional services department approved long form application permit #2374 dated 3/25/20 additional and clarification of proposed scope is as follows; demolition and removal of garage structure at rear of building no replacement of garage required. Demolition and removal of existing two-family house existing foundation to remain. Excavation for building extension for new 10x24 addition to house and new second means of egress tower. Construct new three-story three family residential building on existing foundation. All work per plans and specifications dated 2/1/2010. Cost reflected on permit #2374 and/or l/f #2375/2010. Demolition permit #sf46338 granted 10/21/20 fee paid. Plans rec. 11/02/2010 Client: Eight-21 East Sixth St Condo | Permit type: New construction | Permit status: Expired | Current use: 1-3fam | Permit id: Alt48788 | Parcel: 0604401000 | |||||
SCORE 100 Build partition walls for dedicated storage in basement. Expand driveway to the back wall of the building. Install guardrail around perimeter of roof parapet. Install 6 stockade fence along the eastern and southern property lines. Client: Eight-21 East Sixth St Condo | Permit type: Renovations - exterior | Current use: 1-3fam | Permit id: Sf98863 | Parcel: 604401000 | |||||
SCORE 82 Install new sprinkler system for new construction of a 3 famliy dwelling. Client: Eight-21 East Sixth St Condo | Permit type: New construction | Current use: 1-3fam | Permit id: A63602 | Parcel: 604401000 | |||||
SCORE 82 New installation of sprinkler system Date: February 25, 2011 Contractor: Chris Cunningham Boston Fire Protection Inc Client: Rapczynski | Permit type: Bfd sprinkler system | Permit id: Sprk64405 | Parcel: 0604401000 | |||||
Bfd smoke/co inspection and Date: June 22, 2012 Expiration date: August 21, 2012 | Current use: 1unit | Permit id: Smk144753 | |||||
Bfd smoke/co inspection and Date: September 24, 2014 Expiration date: November 23, 2014 | Current use: 1unit | Permit id: Smk407315 | |||||
SCORE 100 Bfd smoke/co inspection and Date: December 21, 2011 Contractor: Chris Rapczynski Expiration date: February 19, 2012 | Current use: 1unit | Permit id: Smk109692 | |||||
SCORE 100 Modify proviso to allow for roof deck to correct violation #v130389 in system for roof deck use. Cost reflected on sf98863; Date: August 11, 2015 Contractor: Chris Rapczynski Client: Rapczynski | Permit type: Board of appeals | Expiration date: August 11, 2017 | Current use: 1-3fam | Permit id: Boa463411 | Parcel: 0604401000 | |||||
SCORE 100 Use existing roof area for exclusive use by third floor occupant only. Rubber wear mats in place. No work to be done. See alt permit for new building (ls) and shortform for rails. Date: February 14, 2014 Contractor: Chris Rapczynski Client: Rapczynski | Permit type: Board of appeals | Expiration date: February 14, 2016 | Current use: 1-3fam | Permit id: Boa287298 | Parcel: 0604401000 | |||||
SCORE 100 Build partition walls for dedicated storage in basement. Expand driveway to the back wall of the building. Install guardrail around perimeter of roof parapet. Install 6 stockade fence along the eastern and southern property lines. Client: Rapczynski | Permit type: Short form bldg permit | Current use: 1-3fam | Permit id: Sf98863 | Parcel: 0604401000 | |||||
SCORE 100 Modfiy exsting permit to include all perviously permtted work with a stair case and skylight to the roof in the rear stair tower of building. Client: Rapczynski | Permit type: Amendment to a long form | Expiration date: January 22, 2012 | Current use: 1-3fam | Permit id: A80464 | Parcel: 0604401000 | |||||
Install new analog addressable fire alarm system for a 3-family bldg. And condominiums.; ~; doc #20110884 Date: August 16, 2011 Client: Rapczynski | Permit type: Bfd fire alarm installations | Permit id: Bfdf90877 | Parcel: 0604401000 | |||||
Demolition of complete building structure Date: October 12, 2010 Client: Rapczynski | Permit type: Bfd construction demo reno | Permit id: Fdc46064 | Parcel: 0604401000 | |||||
SCORE 82 Install new sprinkler system for new construction of a 3 famliy dwelling. Client: Rapczynski | Permit type: Amendment to a long form | Expiration date: February 2, 2012 | Current use: 1-3fam | Permit id: A63602 | Parcel: 0604401000 | |||||
SCORE 100 Construction of a new 3 family dwelling. Recess lighting sub panels ac and heat. Electric ovens along with general purpose power and lighting Client: Rapczynski | Permit type: Electrical permit | Expiration date: September 3, 2011 | Current use: 1-3fam | Permit id: E66254 | Parcel: 0604401000 | |||||
SCORE 98 Plumbing Client: Rapczynski | Permit type: Gas permit | Expiration date: August 22, 2011 | Current use: 1-3fam | Permit id: G64789 | Parcel: 0604401000 | |||||
SCORE 98 Plumbing Client: Rapczynski | Permit type: Plumbing permit | Expiration date: August 22, 2011 | Current use: 1-3fam | Permit id: Pl64788 | Parcel: 0604401000 | |||||
Stand moving container at curb 24 hours Date: November 3, 2016 Client: Eight-21 East Sixth St Condo | Permit type: Street occupancy permit | Expiration date: November 21, 2016 | Permit id: Occu-653932 | Parcel: 0604401000 | |||||
SCORE 82 3 family permit# alt48788-11/04/10 Date: September 2, 2011 Contractor: Mathew Rapczynski Client: Eight-21 East Sixth St Condo | Permit type: Certificate of occupancy | Current use: 1-3fam | Permit id: Coo90806 | Parcel: 0604401000 | |||||
SCORE 87 Pursuant to previously approved boston redevelopment authority (bra) plans and specifications dated 3/25/20 and inspectional services department approved long form application permit #2374 dated 3/25/20 additional and clarification of proposed scope is as follows; demolition and removal of garage structure at rear of building no replacement of garage required. Demolition and removal of existing two-family house existing foundation to remain. Excavation for building extension for new 10x24 addition to house and new second means of egress tower. Construct new three-story three family residential building on existing foundation. All work per plans and specifications dated 2/1/2010. Cost reflected on permit #2374 and/or l/f #2375/2010. Demolition permit #sf46338 granted 10/21/20 fee paid. Plans rec. 11/02/2010 Client: Eight-21 East Sixth St Condo | Permit type: Long form/alteration permit | Current use: 1-3fam | Permit id: Alt48788 | Parcel: 0604401000 | |||||
SCORE 87 Pursuant to previously approved boston redevelopment authority (bra) plans and specifications dated 3/25/20 and inspectional services department approved long form application permit #2374 dated 3/25/20 additional and clarification of proposed scope is as follows; demolition and removal of garage structure at rear of building no replacement of garage required. Demolition and removal of existing two-family house existing foundation to remain. Excavation for building extension for new 10x24 addition to house and new second means of egress tower. Construct new three-story three family residential building. All work per plans and specifications dated 2/1/2010.; cost reflected on l/f #2375/2010 Date: October 21, 2010 Contractor: Christopher W Rapczynski Client: Eight-21 East Sixth St Condo | Permit type: Short form bldg permit | Expiration date: April 21, 2011 | Current use: 1-2fam | Permit id: Sf46338 | Parcel: 0604401000 |