Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 5 drop duct changeout and 1 cut in Date: March 16, 2011 Contractor: Quality Control Air Inc Permit type: Mechanical | Permit status: Closed | Permit id: 20110302960 | Parcel: 402217332010 | |||||
SCORE 95 Repalce electric panel. Date: July 18, 2011 Contractor: Gregg Electric Corp Permit type: Electrical | Permit status: Closed | Permit id: 20110708070 | Parcel: 402217332010 | |||||
SCORE 95 Repalce electric panel. Date: July 18, 2011 Contractor: Gregg Electric Corp Permit type: Residential electrical | Permit status: Closed | Completion date: July 18, 2011 | Current use: Residential | Permit id: 20110708070 | Parcel: 402217332010 | |||||
SCORE 100 5 drop duct changeout and 1 cut in Date: March 16, 2011 Contractor: Quality Control Air Inc Permit type: Residential mechanical | Permit status: Closed | Completion date: March 16, 2011 | Current use: Residential | Permit id: 20110302960 | Parcel: 402217332010 | |||||
SCORE 100 Tons=2. 5 kw=8 seer=, inst. Or. Repl Date: August 17, 2009 Contractor: Quality Control Air Inc Permit type: Mechanical | Permit status: Closed | Permit id: 2009031324 | |||||
SCORE 95 Re-roof shingle flat 3 12 slope Date: May 1, 2001 Contractor: Terry Corbel Roofing Inc Permit type: Building/trade permits/residential/roofing | Permit status: Closed | Current use: Residential | Permit id: 2001041405 |