Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 77 The existing driveway (which includes no official curb cut) will be reconstructed to include a new 24 wide driveway entrance. Work will also include new ddot standard sidewalk, curb and gutter, and limited asphalt mill and overlay. Date: September 24, 2015 Contractor: Andrea Gourdine Permit type: Paving; curb & gutter(s), paving; driveway(s) repair or replace, paving; mill and overlay, paving; sidewalk(s) | Permit status: Cancel/withdrawn | Expiration date: November 4, 2016 | |||||
SCORE 95 Remove and replace 298 ft of oh wire, replace (1) pole, and install (1) anchor guy at 818 michigan ave ne, west of 9th st ne, as indicated on attached prints. Wr# 3501914 - kdantzler - dac Date: March 16, 2016 Contractor: Pepco Holdings Inc Permit type: Over head work; guy wire installation (each addl), over head work; pole installation (single or first one), over head work; pole removal (single or first one), over head work; string electrical wire | Permit status: Issued | Expiration date: November 4, 2016 | Permit id: Pa124812 | |||||
Excavation in the roadway at michigan ave (bunker hill road) for the installation of (1) new 2" domestic water lateral and (1) new 6" fire service lateral per the approved dc water civil engineering plans and traffic control plan attached. Date: November 14, 2016 Permit type: Excavation; water lateral conn over 2" pipe (trench), excavation; water lateral connection to 2" (trench), excavation; water meter pit (to 2" pipe) | Permit status: Assigned | Expiration date: February 28, 2017 | |||||
SCORE 98 Paving; alley(s) (porous pervious) Contractor: Douglas Development Corp Permit status: 1 | Expiration date: September 28, 2017 | Permit id: 0 | |||||
SCORE 95 Over head work; guy wire installation (each addl), over head work; pole installation (single or first one), over head work; pole removal (single or first one), over head work; string electrical wire Date: April 28, 2016 Contractor: Pepco Holdings Inc Permit status: 8 | Expiration date: November 4, 2016 | Permit id: Pa124812 | |||||
SCORE 95 Excavation; electric connection (trench) Date: June 20, 2016 Contractor: Pepco Holdings Inc Permit status: 8 | Expiration date: August 25, 2016 | Permit id: Pa168557 | |||||
SCORE 77 Paving; curb & gutter(s), paving; driveway(s) repair or replace, paving; mill and overlay, paving; sidewalk(s) Contractor: Andrea Gourdine Permit status: 3 | Expiration date: November 4, 2016 | Permit id: 0 | |||||
SCORE 98 Temporarily close private alley on property at 818 michigan ave, ne, to install porous asphalt paving in alley per the doee approved storm water management plans and traffic control plan attached to this application. Alley is on private property - has existing public use easement. Date: May 3, 2017 Contractor: Douglas Development Corp Permit type: Paving; alley(s) (porous/pervious) | Permit status: Issued | Expiration date: June 30, 2017 | Permit id: Pa200446-R1 | |||||
SCORE 95 Connect 818 michigan ave ne w ug service by building ft of service conduit and misc equipment on sidewalk of 818 michigan ave ne, west of 9th st ne, as indicated on attached prints. Wr# 3511649 - kdantzler - dac Date: March 23, 2017 Contractor: Pepco Holdings Inc Permit type: Excavation; electric connection (trench) | Permit status: Permit expired | Expiration date: June 10, 2017 | Permit id: Pa202884 | |||||
SCORE 100 Construction staging area Date: March 6, 2017 Permit status: Issued | Expiration date: August 18, 2017 | Permit id: Pa10330187-R1 | |||||
SCORE 100 Steel plate- single location Date: January 22, 2017 Permit status: Expired | Expiration date: January 27, 2017 | Permit id: Pa10373525 | |||||
SCORE 100 Construction staging area Date: February 11, 2017 Permit status: Expired | Expiration date: March 31, 2017 | Permit id: Pa10355136-R1 | |||||
SCORE 100 Construction staging area Date: March 31, 2017 Permit status: Issued | Expiration date: July 31, 2017 | Permit id: Pa10380756 | |||||
SCORE 100 Construction staging area Date: April 25, 2017 Permit status: Expired | Expiration date: May 31, 2017 | Permit id: Pa10375487-R1 | |||||
SCORE 100 Construction staging area Permit status: Approved | Expiration date: July 31, 2017 | Permit id: 0 | |||||
SCORE 100 Construction staging area Permit status: Assigned | Expiration date: August 31, 2017 | Permit id: 0 | |||||
SCORE 77 The existing driveway (which includes no official curb cut) will be reconstructed to include a new 24 wide driveway entrance. Work will also include new ddot standard sidewalk, curb and gutter, and limited asphalt mill and overlay. Contractor: Andrea Gourdine Permit status: Cancel/withdrawn | Expiration date: November 4, 2016 | Permit id: 0 | |||||
SCORE 98 Temporarily close private alley on property at 818 michigan ave, ne, to install porous asphalt paving in alley per the doee approved storm water management plans and traffic control plan attached to this application. Alley is on private property - has existing public use easement. Contractor: Douglas Development Corp Permit status: Approved (pending payment | Expiration date: September 28, 2017 | Permit id: 0 | |||||
SCORE 100 Construction staging area Date: December 3, 2016 Permit status: Permit expired | Expiration date: February 28, 2017 | Permit id: Pa10355136 | |||||
SCORE 100 Construction staging area Date: February 23, 2017 Permit status: Permit expired | Expiration date: April 22, 2017 | Permit id: Pa10375487 | |||||
SCORE 100 Construction staging area Permit status: Approved (pending payment | Expiration date: July 31, 2017 | Permit id: 0 | |||||
SCORE 100 Construction staging area Permit status: Assigned | Expiration date: August 31, 2017 | Permit id: 0 | |||||
SCORE 95 Connect 818 michigan ave ne w/ug service by building ft of service conduit and misc equipment on sidewalk of 818 michigan ave ne, west of 9th st ne, as indicated on attached prints. Wr# 3511649 - kdantzler - dac Date: June 1, 2016 Contractor: Pepco Holdings Inc Permit type: Excavation; electric connection (trench) | Permit status: Permit expired | Expiration date: August 25, 2016 | Permit id: Pa168557 | |||||
SCORE 98 Excavation and installation of traffic signal equipment and associated manhole structures, poles, pull boxes, conduit and aerial cable as required per attached traffic signal plan. Mill and repave roadway as necessary. Date: July 8, 2017 Contractor: Douglas Development Corp Permit type: Fixture; traffic signal installation, excavation; manhole installation, excavation; telecom connection (trench), over head work; string telecom wire/fiber, paving; mill and overlay | Permit status: Permit expired | Expiration date: September 15, 2017 | Permit id: Pa203493-R1 | |||||
SCORE 77 Paving; curb & gutter(s), paving; driveway(s) repair or replace, paving; mill and overlay, paving; sidewalk(s) Contractor: Andrea Gourdine Permit status: 3 | Expiration date: November 4, 2016 | Permit id: 0 | |||||
SCORE 98 Excavation in the roadway at michigan ave (bunker hill road) for the installation of (1) new 2" domestic water lateral and (1) new 6" fire service lateral per the approved dc water civil engineering plans and traffic control plan attached. Date: November 14, 2016 Contractor: Douglas Development Corp Permit type: Excavation; water lateral conn over 2" pipe (trench), excavation; water lateral connection to 2" (trench), excavation; water meter pit (to 2" pipe) | Permit status: Issued | Expiration date: February 16, 2017 | Permit id: Pa186531 | |||||
SCORE 95 Connect 818 michigan ave ne w ug service by building ft of service conduit and misc equipment on sidewalk of 818 michigan ave ne, west of 9th st ne, as indicated on attached prints. Wr# 3511649 - kdantzler - dac Date: March 29, 2017 Contractor: Pepco Holdings Inc Permit status: Permit expired | Expiration date: June 10, 2017 | Permit id: Pa202884 | |||||
SCORE 100 Roll off debris container Permit status: Notpaid | Expiration date: August 26, 2017 | Permit id: 0 | |||||
SCORE 77 The existing driveway (which includes no official curb cut) will be reconstructed to include a new 24 wide driveway entrance. Work will also include new ddot standard sidewalk, curb and gutter, and limited asphalt mill and overlay. Contractor: Andrea Gourdine Permit status: Cancel/withdrawn | Expiration date: November 4, 2016 | Permit id: 0 | |||||
SCORE 98 Remove and replace certain existing sidewalk, install new sidewalk where none exists, replace certain existing driveway aprons, install new curb and gutter, replace certain existing ada sidewalk ramps and mill and repave existing asphalt as needed, install new asphalt at certain locations along bunker hill road from entrance to new parking garage project to 10th street and install new trees per the attached civil engineering site plan and landscape plan. Date: May 10, 2017 Contractor: Douglas Development Corp Permit type: Paving; ada curb ramp, paving; curb & gutter(s), paving; driveway(s) repair or replace, paving; mill and overlay, paving; sidewalk(s), landscaping; tree planting | Permit status: Permit expired | Expiration date: September 30, 2017 | Permit id: Pa201509 | |||||
SCORE 98 Excavation in the roadway at michigan ave (bunker hill road) for the installation of (1) new 2" domestic water lateral and (1) new 6" fire service lateral per the approved dc water civil engineering plans and traffic control plan attached. Date: February 3, 2017 Contractor: Douglas Development Corp Permit type: Excavation; water lateral conn over 2" pipe (trench), excavation; water lateral connection to 2" (trench), excavation; water meter pit (to 2" pipe) | Permit status: Permit expired | Expiration date: April 17, 2017 | Permit id: Pa186531-R1 | |||||
SCORE 98 Excavation and installation of traffic signal equipment and associated manhole structures, poles, pull boxes, conduit and aerial cable as required per attached traffic signal plan. Mill and repave roadway as necessary. Date: May 23, 2017 Contractor: Douglas Development Corp Permit type: Fixture; traffic signal installation, excavation; manhole installation, excavation; telecom connection (trench), over head work; string telecom wire/fiber, paving; mill and overlay | Permit status: Permit expired | Expiration date: July 17, 2017 | Permit id: Pa203493 | |||||
SCORE 98 Temporarily close private alley on property at 818 michigan ave, ne, to install porous asphalt paving in alley per the doee approved storm water management plans and traffic control plan attached to this application. Alley is on private property - has existing public use easement. Date: March 16, 2017 Contractor: Douglas Development Corp Permit type: Paving; alley(s) (porous/pervious) | Permit status: Permit expired | Expiration date: May 31, 2017 | Permit id: Pa200446 | |||||
SCORE 96 Construction staging area Date: June 28, 2016 Contractor: Potomac Electric Power Company Permit status: Permit expired | Expiration date: July 21, 2016 | Permit id: Pa10298382 | |||||
SCORE 98 Construction staging area Date: September 26, 2016 Contractor: Anchor Construction Permit status: Permit expired | Expiration date: November 16, 2016 | Permit id: Pa10334606 | |||||
SCORE 100 Construction staging area Date: September 8, 2016 Permit status: Permit expired | Expiration date: February 19, 2017 | Permit id: Pa10330187 | |||||
SCORE 98 Construction staging area Date: April 16, 2017 Contractor: Anchor Construction Permit status: Permit expired | Expiration date: May 15, 2017 | Permit id: Pa10392713 | |||||
SCORE 100 Roll off debris container Permit status: Not paid | Expiration date: August 26, 2017 | Permit id: 0 | |||||
SCORE 100 Roll off debris container Date: August 12, 2017 Permit status: Permit expired | Expiration date: August 18, 2017 | Permit id: Pa10458126 |