Proposal to replace existing asphalt shingle roofing with new lamarite synthetic slate shingles, per application received 06/27/16. Date: June 27, 2016 Permit type: Vcc general work | Permit status: Vcc arc meeting | Current use: Half of a party wall double | Permit id: 16-21137-Vcgen | |||||
Remove and replace weatherboards on the st. Anne side elevation. To prepare for painting by sanding (rotary sanders cannot be used), making minor millwork and masonry repairs as necessary to match existing conditions (masonry mix must be soft, with maximum portland cement content not to exceed 1 part to 12) and to paint as follows to match existing conditions: walls: hemingway (taupe), 304-4, flat or eggshell finishshutters/doors: green, semigloss, 325-(ol)trim including frames, fascia/soffit of front overhang, dormer face: snowflake, semigloss, 305. 5 (ww)balcony decking: cape cod grayironwork: black, semiglossthis permit prohibits the application of the following exterior coating materials and paints: sealers, ceramic coatings/paints, elastomeric coatings/paints, waterproofing/water repellent coatings. Date: April 28, 2016 Permit type: Vcc general work | Permit status: Permit issued | Expiration date: October 28, 2016 | Current use: Half of a party wall double | Permit id: 16-14035-Vcgen | |||||
Proposal to remove portions of brick foundation to increase crawlspace airflow, per application & materials received 05/18/16 & Date: May 19, 2016 Permit type: Vcc general work | Permit status: Returned for revision | Current use: Half of a party wall double | Permit id: 16-16695-Vcgen | |||||
Remove three (3) existing window units and install one (1) new four ton mini-split unit on existing rooftop platform, per application & materials received 06/02/16 and stamped vcc approved 07/12/15. To include:approximately 6" of copperline run from the new unit on the dauphine side elevation to the interior stairwell and interior mini split heads. All copper lines will be 1 1/2 in diameter and painted to match the exterior of the structure. Approximately 11" of drain line run alongside each window on the dauphine side elevaton. All drain lines will be 3/4 pipe and painted to match the exterior of the structure. Date: June 2, 2016 Permit type: Vcc general work | Permit status: Permit issued | Expiration date: January 14, 2017 | Current use: Half of a party wall double | Permit id: 16-18390-Vcgen | |||||
SCORE 93 Replace 2 amp 3 phase breaker panel Permit type: Electrical service / circuit / feeder | Permit status: Meter release | Completion date: July 25, 2016 | Expiration date: January 21, 2017 | Current use: Single unit in multi-family dwelling | Permit id: 16-23849-Serv | |||||
Proposal to remove portions of brick foundation to increase crawlspace airflow, per application & materials received 05 18 16 & Date: May 19, 2016 Permit type: Vcc general work | Permit status: Permit expired due to ina | Completion date: January 4, 2017 | Current use: Half of a party wall double | Permit id: 16-16695-Vcgen | |||||
Proposal to replace existing asphalt shingle roofing with new lamarite synthetic slate shingles, per application received 06 27 16. Date: June 27, 2016 Permit type: Vcc general work | Permit status: Permit expired due to ina | Completion date: January 4, 2017 | Current use: Half of a party wall double | Permit id: 16-21137-Vcgen | |||||
Remove and replace weatherboards on the st. Anne side elevation. To prepare for painting by sanding (rotary sanders cannot be used), making minor millwork and masonry repairs as necessary to match existing conditions (masonry mix must be soft, with maximum portland cement content not to exceed 1 part to 12) and to paint as follows to match existing conditions: walls: hemingway (taupe), 304-4, flat or eggshell finishshutters doors: green, semigloss, 325-(ol)trim including frames, fascia soffit of front overhang, dormer face: snowflake, semigloss, 305. 5 (ww)balcony decking: cape cod grayironwork: black, semiglossthis permit prohibits the application of the following exterior coating materials and paints: sealers, ceramic coatings paints, elastomeric coatings paints, waterproofing water repellent coatings. Date: April 28, 2016 Permit type: Vcc general work | Permit status: Permit issued | Expiration date: October 28, 2016 | Current use: Half of a party wall double | Permit id: 16-14035-Vcgen | |||||
Remove three (3) existing window units and install one (1) new four ton mini-split unit on existing rooftop platform, per application & materials received 06 02 16 and stamped vcc approved 07 12 15. To include:approximately 6" of copperline run from the new unit on the dauphine side elevation to the interior stairwell and interior mini split heads. All copper lines will be 1 1 2 in diameter and painted to match the exterior of the structure. Approximately 11" of drain line run alongside each window on the dauphine side elevaton. All drain lines will be 3 4 pipe and painted to match the exterior of the structure. Date: June 2, 2016 Permit type: Vcc general work | Permit status: Permit issued | Expiration date: January 14, 2017 | Current use: Half of a party wall double | Permit id: 16-18390-Vcgen | |||||
SCORE 92 Mat haydel-382-2877-pd chk# 1170-hvac, waf Date: July 11, 2016 Contractor: Mathew Haydel Permit type: Mechanical hvac | Permit status: Permit issued | Expiration date: January 11, 2017 | Current use: Half of a party wall double | Permit id: 16-22490-Hvac | |||||
SCORE 93 Replace 1 amp fuse panel with 125 amp breaker panel Date: July 20, 2016 Contractor: Wilbert Chaney Permit type: Electrical repair / replacement / addition | Permit status: Meter release | Completion date: July 25, 2016 | Expiration date: January 21, 2017 | Current use: Single unit in multi-family dwelling | Permit id: 16-23851-Erpr |