Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 82 9 plumbing fixtures . Remodel two bathrooms Date: April 11, 2016 Contractor: Dave Passey Plumbing Permit type: Plumbing | Permit status: Inspections | Permit id: Bld2016-03369 | |||||
SCORE 59 Basement - re-locate furnace, add tank-less water heater, central air. A separate permit will be taken out on this part of the project. .... In the area of the basement where the furnace/water heater are currently located, a bathroom with shower, vanity and toilet will be built. Also, upstairs bathroom will be partially remodeled - a closet wall from the next bedroom will be removed to enlarge the bathroom... New vanity and toilet relocated. Tile floor. Bathtub and shower remain. Separate plumbing permits will be taken out Date: February 14, 2016 Contractor: North American Const. Inc Permit id: Bld2016-01221 | |||||
SCORE 91 Water heater requires plumbing permit. Furnace changeout, and add central air system. Replace water heater with tankless. Date: February 12, 2016 Contractor: Boulard Heating And Air Conditioning L.L.C Permit type: Mechanical | Permit status: Inspections | Permit id: Bld2016-01170 | |||||
SCORE 89 Window replacement only. No other work. Date: March 17, 2016 Contractor: North American Construction, Inc Permit status: Inspections | Permit id: Bld2016-02474 | |||||
SCORE 91 Water heater requires plumbing permit. Furnace changeout, and add central air system. Replace water heater with tankless. Date: February 12, 2016 Contractor: Boulard Heating And Air Conditioning, L.L.C Permit type: Mechanical | Permit status: Inspections | Permit id: Bld2016-01170 | |||||
SCORE 59 Basement - re-locate furnace, add tank-less water heater, central air. A separate permit will be taken out on this part of the project. .... In the area of the basement where the furnace water heater are currently located, a bathroom with shower, vanity and toilet will be built. Also, upstairs bathroom will be partially remodeled - a closet wall from the next bedroom will be removed to enlarge the bathroom... New vanity and toilet relocated. Tile floor. Bathtub and shower remain. Separate plumbing permits will be taken out Date: February 14, 2016 Contractor: North American Const., Inc Permit id: Bld2016-01221 | |||||
SCORE 82 9 plumbing fixtures . Remodel two bathrooms Date: April 11, 2016 Contractor: Dave Passey Plumbing Permit type: Plumbing | Permit status: Inspections | Permit id: Bld2016-03369 | |||||
SCORE 91 Electrical remodel bathroom Date: April 7, 2016 Contractor: Nico Electric, L.C Permit type: Electrical | Permit status: Inspections | Permit id: Bld2016-03276 | |||||
SCORE 89 Remove and replace existing asphalt shingle roof. Remove swamp cooler and patch sheathing. Date: January 29, 2016 Contractor: North American Construction, Inc Permit type: Roofing | Permit status: Inspections | Permit id: Bld2016-00756 |