Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 99 Staging of materials for and construction, excavation and removal of existing lead and install replacement copper water service 1" line in public space, in street, sidewalk, tree-space, and yard. Period of occupancy for construction of service line will not exceed 2 days. "excavation operations shall comply with district department of transportation standard specifications for highways and structures sections 207 and 611. All work shall be conducted so as to avoid injury to tree trunks, branches, and roots. Excavations within limits of tree root spread shall proceed with care either by use of hand tools or with equipment that will not cause tree root damage. If there are any tree conflicts on this job site permit holder must suspend all work that contributes to the conflict and immediately contact carlson klapthor, ward 6 arborist at 202-507-3903 to receive clearance to continue conflicting work." Date: November 6, 2012 Contractor: Corinthian Contractors Inc Permit type: Excavation; repair water service lateral | Permit status: Permit expired | Expiration date: January 31, 2013 | Permit id: Pa76707 | |||||
SCORE 98 Curb cut and driveway Date: July 27, 2016 Contractor: Robert Bell Client: Matthew Rufe | Permit type: Paving; driveway(s) new -residential | Permit status: Assigned | Expiration date: June 1, 2017 | |||||
SCORE 72 Moving truck Date: May 14, 2012 Contractor: Sarah Fowler Permit status: Expired | Expiration date: May 25, 2012 | Permit id: Pa10058421 | |||||
SCORE 56 Moving truck Date: September 21, 2012 Contractor: Matthew Rufe Permit status: Expired | Expiration date: September 28, 2012 | Permit id: Pa10073785 | |||||
SCORE 100 Construction staging area Date: November 30, 2012 Contractor: Dcwater Permit status: Expired | Expiration date: December 31, 2012 | Permit id: Pa10080377 | |||||
SCORE 72 Other reserved parking Contractor: Sarah Fowler Permit status: Notpaid | Expiration date: May 25, 2012 | Permit id: 0 | |||||
SCORE 98 Paving; driveway(s) new -residential Contractor: Robert Bell Permit status: 12 | Expiration date: June 1, 2017 | Permit id: 0 | |||||
SCORE 99 Excavation; repair water service lateral Date: November 30, 2012 Contractor: Corinthian Contractors Inc Permit status: 8 | Expiration date: January 31, 2013 | Permit id: Pa76707 | |||||
SCORE 100 Staging of materials for and construction, excavation and removal of existing lead and install replacement copper water service 1" line in public space, in street, sidewalk, tree-space, and yard. Period of occupancy for construction of service line will not exceed 2 days. "excavation operations shall comply with district department of transportation standard specifications for highways and structures sections 207 and 611. All work shall be conducted so as to avoid injury to tree trunks, branches, and roots. Excavations within limits of tree root spread shall proceed with care either by use of hand tools or with equipment that will not cause tree root damage. If there are any tree conflicts on this job site permit holder must suspend all work that contributes to the conflict and immediately contact carlson klapthor, ward 6 arborist at 202-507-3903 to receive clearance to continue conflicting work." Date: November 30, 2012 Contractor: Dcwater Ops Permit status: Permit expired | Expiration date: January 31, 2013 | Permit id: Pa76707 | |||||
SCORE 98 Paving; driveway(s) new -residential Contractor: Robert Bell Permit status: 12 | Expiration date: June 1, 2017 | Permit id: 0 | |||||
SCORE 72 Other reserved parking Contractor: Sarah Fowler Permit status: Notpaid | Expiration date: May 25, 2012 | Permit id: 0 |