SCORE 100 Oppds feeder wires shorted out in the meter box and went phase to phase causing a short so the house is with out 220v. We will need an outage, replace the meter box, replace the load wires to the panel, repair the meter riser pipe, call for an inspection and then have oppd fix their wires and turn the power back on all with in an 8 hour block. Date: December 2, 2014 Contractor: Henry Miller Iii Permit type: Electrical residential existing | Permit status: Issued | Permit id: Elc-14-11511 | |||||
SCORE 100 Need to schedule an outage to replace the meter box, due to the phase to phase on the line side of the meter. Date: December 2, 2014 Contractor: Henry Miller Iii Permit type: Electrical residential existing | Permit status: Issued | Permit id: Elc-14-11512 |