Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Electrical permit Date: June 2, 2016 Client: Ferrero Joseph V Jr Ferrero Madeline | Permit status: Completed | Permit id: 687817 | |||||
Alteration permit Date: August 4, 2010 Client: Ferrero Joseph V Jr Ferrero Madeline | Permit status: Completed | Permit id: 290589 | |||||
Electrical permit Date: July 26, 2011 Client: Ferrero Joseph V Jr Ferrero Madeline | Permit status: Completed | Permit id: 354397 | |||||
Re-finishing existg basement - new gwb on existing walls and ceilings basement not to be used as a bed room install smoke and carbon monoxide detector Date: August 4, 2010 Client: Ferrero Joseph V Jr Ferrero Madeline | Permit type: Alteration permit | Permit status: Completed | Completion date: August 27, 2012 | Permit id: 290589 | |||||
SCORE 100 Install (8) receptacles, arc fault circuit line for 15amp. Install (8) 5" standard direct contact with insulation recessed light, power from existing switches. Replace surface light.... In accordance with 2008 nec (single family) Date: July 26, 2011 Contractor: Stahl Electric Client: Ferrero Joseph V Jr Ferrero Madeline | Permit type: Electrical permit | Permit status: Completed | Completion date: September 13, 2011 | Permit id: 354397 | |||||
SCORE 95 Installation of a 4. 94 kw photovoltaic pv system with 19 roof mounted solar panels, new net meter installation as per 2008 nec (north district) Date: June 2, 2016 Contractor: Vivint Solar Developer Llc Client: Ferrero Joseph V Jr Ferrero Madeline | Permit type: Electrical permit | Permit status: Completed | Completion date: September 8, 2016 | Permit id: 687817 |