Accurate auto body Date: May 1, 2013 Permit type: Fire life safety | Permit id: Fire-2013-04983 | Parcel: 9270700050 | |||||
Side sewer repair to fix the side sewer for carter/heron projects. Extending the new 8 side sewer beyond the proposed jut. Connecting the ex 6 sewer into the cleanout stack of the new 6 sewer to make up vertical difference. Reducing the length of the ac sewer replacement to 18 total so only 1 trench box needs to be used for shoring. Installing the new 12x4 tapping tee & valve and stub for the new meter at heron. Date: August 7, 2015 Applicant: Kim Faust | Permit type: Side sewer | Permit id: Swr-2015-05992 | Parcel: 9270700050 | |||||
A new 6-story apartment building with 95 multi-family units/ including 5 live-work units. Date: June 23, 2016 Applicant: Kim Faust | Permit type: Civil site construction permit | Permit id: Site-2016-03053 | Parcel: 9270700050 | |||||
Mu new heron flats and lofts- jim/ wizard electric - 425-498-23 - new 95 unit mu bldg with underground parking - customer paid for (95) feeders & (1) ground ufer - per visit. Date: August 2, 2016 Value: $1,321,823 Applicant: Jim Reinkens | Permit type: Electrical - otc | Permit id: Elec-2016-06546 | Parcel: 9270700050 | |||||
Mu new heron flats & lofts- garage this concrete permit includes basement level/ level 1/ and level 2/mezzanine level. This concrete permit includes: parking/ service/mechanical rooms/ bike storage/ 5 l/w residential units/ leasing office/ amenity lounge/ fitness room/ and public restrooms. For the purposes of this permit level 3 is the roof of the concrete construction and no occupied space at level 3 is included in this permit. Type va construction (level 3 through 7) and 3 hour horizontal termination are under separate permit. Square footage breakdown is the following (a3 type 1a 1942/ b type 1a 3 sq ft/ r-2 type 1a 3/953 sq ft and s-2 type 1a 53966 sq ft) total area of work 60/181 sq ft. Date: July 13, 2016 Value: $5,539,620 Applicant: Kim Faust | Permit type: Mixed use | Permit id: Bldg-2016-00908 | Parcel: 9270700050 | |||||
Mu new heron flats and lofts- this building permit includes 5 stories of type v wood frame. Building permit includes: apartment/ courtyard at level 3 with interior and exterior assembly occupancy/ and accessory service/mechanical rooms. For the purposes of this permit the level 3 is the roof of the concrete permit and levels 3 through 7 are included in the building permit. Level 3 through 7 is type va construction built on top of 3 hour horizontal termination that is under separate permit. Square footage breakdown is the following- level 3 492 sq ft occupancy a3 construction type va/ level 3-7 95/4 sq ft occupancy r2 construction type va. Total area of work 95/932 sq ft. Date: November 3, 2016 Value: $10,342,296 Applicant: Daniel Ash | Permit type: Mixed use | Permit id: Bldg-2016-02501 | Parcel: 9270700050 | |||||
Heron flats and lofts - new plumbing for a (95) unit apartment building - includes (4) backflow devices/ (92) bathtubs/ (95) clothes washers/ (95) dishwashers/ (15) floor drains/ (95) garbage disposals/ (8) hose bibs/ (22) deck drains/ (4) roof drains/ (51) shower valves/ (156) sinks(bathroom)/ (97) sinks(kitchen)/ (141) toilets/ (4) water services and (1) oil/water interceptor. Total of (880) fixtures. Date: June 30, 2016 Value: $1,048,801 Applicant: Joseph Fiore | Permit type: Plumbing plan review | Permit id: Plum-2016-05167 | Parcel: 9270700050 | |||||
Access hand hole #1 and pole #6 front of 7662 159th place ne - accurate autobody. Work required to remove aerial cable going to 7662. Building is being demolished. Frontier vehicle to park in customer parking lot with no traffic impact - proper signage and cones will be used. Date: March 10, 2016 Applicant: Thomas Dacey | Permit type: Right of way | Permit id: Row-2016-01851 | Parcel: 9270700050 | |||||
Demo - heron flats and lofts - demolition of existing autobody structure and existing accessory structure to prepare site for construction of new mixed use building. Existing autobody shop is 10/947 sf and accessory structure is 1/581 sf. Date: February 23, 2016 Value: $45,000 Applicant: Kim Faust | Permit type: Demolition | Permit id: Demo-2016-00609 | Parcel: 9270700050 | |||||
Mu new heron flats and lofts- 3-2 amp 3 phase temporary services. 120-128 volt Date: July 19, 2016 Value: $10,000 Applicant: Jim Reinkens | Permit type: Electrical - otc | Permit id: Elec-2016-06190 | Parcel: 9270700050 | |||||
Occupying southbound lane of 159th place ne to cut and cap existing 1 1/4-inch pe gas service to 7662 159th place ne at the main. One 3x5 hard surface cut ancitipated. Date: March 10, 2016 Applicant: Aurelie Johannson | Permit type: Right of way | Permit id: Row-2016-00641 | Parcel: 9270700050 | |||||
Temp cap existing side sewer for future development of the carter (aka heron plats + lofts) demo - heron flats and lofts - demolition of existing autobody structure and existing accessory structure to prepare site for construction of new mixed use building. Existing autobody shop is 10/947 sf and accessory structure is 1/581 sf. Date: March 10, 2016 Value: $45,000 Applicant: Kim Faust | Permit type: Side sewer | Permit id: Swr-2016-01581 | Parcel: 9270700050 | |||||
Park in row to pull cable from v1 to j1 and close lane at j1. Date: October 5, 2016 Applicant: Trina Gallaher | Permit type: Right of way | Permit id: Row-2016-08246 | Parcel: 9270700050 | |||||
Mu new heron flats and lofts- installation of garage exhaust/ corridor ventilation/ corridor conditioning/ split system conditioning of first floor amenity space/ trash room ventilation/ and elevator and stairwell pressurization. No rooftop mechanical equipment on this permit. Customer paid for (1) air handler/ (5) fan coil units/ (5) heat pumps/ (2) heating equipment including ductwork/ (18) vent fans = 31 total fixtures (note) no gas piping/ unit venting/ water heaters. Etc. Etc on this permit Date: November 23, 2016 Value: $34,500 Applicant: Miranda Mendez | Permit type: Mechanical plan review | Permit id: Mech-2016-09341 | Parcel: 9270700050 | |||||
SCORE 86 Mu new heron flats and lofts- 3-2 amp 3 phase temporary services. 120-128 volt Applicant: Jim Reinkens | Permit type: Electrical - otc | Permit id: Elec-2016-06190 | Parcel: 9270700050 | |||||
SCORE 94 Mu new heron flats & lofts- garage this concrete permit includes basement level level 1 and level 2 mezzanine level. This concrete permit includes: parking service mechanical rooms bike storage 5 l w residential units leasing office amenity lounge fitness room and public restrooms. For the purposes of this permit level 3 is the roof of the concrete construction and no occupied space at level 3 is included in this permit. Type va construction (level 3 through 7) and 3 hour horizontal termination are under separate permit. Square footage breakdown is the following (a3 type 1a 1942 b type 1a 3 sq ft r-2 type 1a 3 953 sq ft and s-2 type 1a 53966 sq ft) total area of work 60 181 sq ft. Applicant: Kim Faust | Permit type: Mixed use | Permit id: Bldg-2016-00908 | Parcel: 9270700050 | |||||
SCORE 86 Mu new heron flats and lofts- jim wizard electric - 425-498-23 - new 95 unit mu bldg with underground parking - customer paid for (95) feeders & (1) ground ufer - per visit. Applicant: Jim Reinkens | Permit type: Electrical - otc | Permit id: Elec-2016-06546 | Parcel: 9270700050 | |||||
SCORE 94 Mu new heron flats and lofts- this building permit includes 5 stories of type v wood frame. Building permit includes: apartment courtyard at level 3 with interior and exterior assembly occupancy and accessory service mechanical rooms. For the purposes of this permit the level 3 is the roof of the concrete permit and levels 3 through 7 are included in the building permit. Level 3 through 7 is type va construction built on top of 3 hour horizontal termination that is under separate permit. Square footage breakdown is the following- level 3 492 sq ft occupancy a3 construction type va level 3-7 95 4 sq ft occupancy r2 construction type va. Total area of work 95 932 sq ft. Applicant: Daniel Ash | Permit type: Mixed use | Permit id: Bldg-2016-02501 | Parcel: 9270700050 | |||||
SCORE 82 Side sewer repair to fix the side sewer for carter heron projects. Extending the new 8 side sewer beyond the proposed jut. Connecting the ex 6 sewer into the cleanout stack of the new 6 sewer to make up vertical difference. Reducing the length of the ac sewer replacement to 18 total so only 1 trench box needs to be used for shoring. Installing the new 12x4 tapping tee & valve and stub for the new meter at heron. Date: August 7, 2015 Contractor: Santana Trucking Applicant: Kim Faust | Permit type: Side sewer | Permit id: Swr-2015-05992 | Parcel: 9270700050 | |||||
SCORE 94 Demo - heron flats and lofts - demolition of existing autobody structure and existing accessory structure to prepare site for construction of new mixed use building. Existing autobody shop is 10 947 sf and accessory structure is 1 581 sf. Applicant: Kim Faust | Permit type: Demolition | Permit id: Demo-2016-00609 | Parcel: 9270700050 | |||||
SCORE 82 Temp cap existing side sewer for future development of the carter (aka heron plats + lofts) demo - heron flats and lofts - demolition of existing autobody structure and existing accessory structure to prepare site for construction of new mixed use building. Existing autobody shop is 10 947 sf and accessory structure is 1 581 sf. Applicant: Kim Faust | Permit type: Side sewer | Permit id: Swr-2016-01581 | Parcel: 9270700050 | |||||
Occupying southbound lane of 159th place ne to cut and cap existing 1 1 4-inch pe gas service to 7662 159th place ne at the main. One 3x5 hard surface cut ancitipated. Date: March 10, 2016 Applicant: Aurelie Johannson | Permit type: Right of way | Permit id: Row-2016-00641 | Parcel: 9270700050 | |||||
SCORE 94 A new 6-story apartment building with 95 multi-family units including 5 live-work units. Date: June 23, 2016 Contractor: Wg Clark Construction Applicant: Kim Faust | Permit type: Civil site construction permit | Permit id: Site-2016-03053 | Parcel: 9270700050 | |||||
SCORE 89 Heron flats and lofts - new plumbing for a (95) unit apartment building - includes (4) backflow devices (92) bathtubs (95) clothes washers (95) dishwashers (15) floor drains (95) garbage disposals (8) hose bibs (22) deck drains (4) roof drains (51) shower valves (156) sinks(bathroom) (97) sinks(kitchen) (141) toilets (4) water services and (1) oil water interceptor. Total of (880) fixtures. Applicant: Joseph Fiore | Permit type: Plumbing plan review | Permit id: Plum-2016-05167 | Parcel: 9270700050 | |||||
SCORE 100 Mu new heron flats and lofts- installation of garage exhaust corridor ventilation corridor conditioning split system conditioning of first floor amenity space trash room ventilation and elevator and stairwell pressurization. No rooftop mechanical equipment on this permit. Customer paid for (1) air handler (5) fan coil units (5) heat pumps (2) heating equipment including ductwork (18) vent fans = 31 total fixtures (note) no gas piping unit venting water heaters. Etc. Etc on this permit Applicant: Miranda Mendez | Permit type: Mechanical plan review | Permit id: Mech-2016-09341 | Parcel: 9270700050 | |||||
SCORE 82 Side sewer repair to fix the side sewer for carter heron projects. Extending the new 8 side sewer beyond the proposed jut. Connecting the ex 6 sewer into the cleanout stack of the new 6 sewer to make up vertical difference. Reducing the length of the ac sewer replacement to 18 total so only 1 trench box needs to be used for shoring. Installing the new 12x4 tapping tee & valve and stub for the new meter at heron. Date: August 7, 2015 Contractor: Santana Trucking Applicant: Kim Faust | Permit type: Side sewer | Permit id: Swr-2015-05992 | |||||
SCORE 94 Demo - heron flats and lofts - demolition of existing autobody structure and existing accessory structure to prepare site for construction of new mixed use building. Existing autobody shop is 10 947 sf and accessory structure is 1 581 sf. Applicant: Kim Faust | Permit type: Demolition | Permit id: Demo-2016-00609 | |||||
SCORE 82 Temp cap existing side sewer for future development of the carter (aka heron plats + lofts) demo - heron flats and lofts - demolition of existing autobody structure and existing accessory structure to prepare site for construction of new mixed use building. Existing autobody shop is 10 947 sf and accessory structure is 1 581 sf. Applicant: Kim Faust | Permit type: Side sewer | Permit id: Swr-2016-01581 | |||||
SCORE 94 A new 6-story apartment building with 95 multi-family units including 5 live-work units. Date: June 23, 2016 Contractor: Wg Clark Construction Applicant: Kim Faust | Permit type: Civil site construction permit | Permit id: Site-2016-03053 | |||||
SCORE 86 Mu new heron flats and lofts- 3-2 amp 3 phase temporary services. 120-128 volt Applicant: Jim Reinkens | Permit type: Electrical - otc | Permit id: Elec-2016-06190 | |||||
SCORE 94 Mu new heron flats & lofts- garage this concrete permit includes basement level level 1 and level 2 mezzanine level. This concrete permit includes: parking service mechanical rooms bike storage 5 l w residential units leasing office amenity lounge fitness room and public restrooms. For the purposes of this permit level 3 is the roof of the concrete construction and no occupied space at level 3 is included in this permit. Type va construction (level 3 through 7) and 3 hour horizontal termination are under separate permit. Square footage breakdown is the following (a3 type 1a 1942 b type 1a 3 sq ft r-2 type 1a 3 953 sq ft and s-2 type 1a 53966 sq ft) total area of work 60 181 sq ft. Applicant: Kim Faust | Permit type: Mixed use | Permit id: Bldg-2016-00908 | |||||
SCORE 86 Mu new heron flats and lofts- jim wizard electric - 425-498-23 - new 95 unit mu bldg with underground parking - customer paid for (95) feeders & (1) ground ufer - per visit. Applicant: Jim Reinkens | Permit type: Electrical - otc | Permit id: Elec-2016-06546 | |||||
SCORE 94 Mu new heron flats and lofts- this building permit includes 5 stories of type v wood frame. Building permit includes: apartment courtyard at level 3 with interior and exterior assembly occupancy and accessory service mechanical rooms. For the purposes of this permit the level 3 is the roof of the concrete permit and levels 3 through 7 are included in the building permit. Level 3 through 7 is type va construction built on top of 3 hour horizontal termination that is under separate permit. Square footage breakdown is the following- level 3 492 sq ft occupancy a3 construction type va level 3-7 95 4 sq ft occupancy r2 construction type va. Total area of work 95 932 sq ft. Applicant: Daniel Ash | Permit type: Mixed use | Permit id: Bldg-2016-02501 | |||||
SCORE 100 Mu new heron flats and lofts- installation of garage exhaust corridor ventilation corridor conditioning split system conditioning of first floor amenity space trash room ventilation and elevator and stairwell pressurization. No rooftop mechanical equipment on this permit. Customer paid for (1) air handler (5) fan coil units (5) heat pumps (2) heating equipment including ductwork (18) vent fans = 31 total fixtures (note) no gas piping unit venting water heaters. Etc. Etc on this permit Applicant: Miranda Mendez | Permit type: Mechanical plan review | Permit id: Mech-2016-09341 | |||||
SCORE 89 Heron flats and lofts - new plumbing for a (95) unit apartment building - includes (4) backflow devices (92) bathtubs (95) clothes washers (95) dishwashers (15) floor drains (95) garbage disposals (8) hose bibs (22) deck drains (4) roof drains (51) shower valves (156) sinks(bathroom) (97) sinks(kitchen) (141) toilets (4) water services and (1) oil water interceptor. Total of (880) fixtures. Applicant: Joseph Fiore | Permit type: Plumbing plan review | Permit id: Plum-2016-05167 | |||||
SCORE 100 Vrf on 6th and 7th floor split systems on lvl 1 live work units Applicant: Miranda Mendez | Permit type: Mechanical plan review | Permit id: Mech-2017-02357 | |||||
SCORE 100 Sopa#47654 - herons flatts - 253-872-5665 - installation of 45 low voltage thermostats and associated wiring. Customer paid for :(45) low voltage Applicant: Miranda Mendez | Permit type: Electrical - otc | Permit id: Elec-2017-03060 | |||||
SCORE 86 Heron flats generator - installation of a new 83 kw diesel generator. Applicant: Jim Reinkens | Permit type: Electrical plan review | Permit id: Elec-2017-02033 | |||||
SCORE 100 Mu new heron flats and lofts- install fire alarm smoke control panel two-way communication cctv and intercom access. Customer paid for (464) fire alarm & (40) low voltage. Applicant: Richard Mccurdy | Permit type: Electrical - otc | Permit id: Elec-2017-02787 | |||||
SCORE 95 Mu new heron flats and lofts- installation of new fire alarm system - customer paid for (445) devices (1) transmitter (1) control panel & (5) power supply. Date: May 18, 2017 Contractor: Guardian Security Systems Inc Applicant: Richard Mccurdy | Permit type: Fire alarm | Permit id: Fire-2017-02786 | |||||
SCORE 100 Sopa #503 - heron flats & lofts illuminated signs - 206-909-6996 - electrical permit for sign permit # sign-2017-04377 signs are hooked up into existing electrical customer paid for:(5) illuminated signs Applicant: Shari Rust | Permit type: Electrical - otc | Permit id: Elec-2017-08319 | Parcel: 9270700050 | |||||
SCORE 100 Mu new heron flats and lofts- this building permit includes 5 stories of type v wood frame. Building permit includes: apartment courtyard at level 3 with interior and exterior assembly occupancy and accessory service mechanical rooms. For the purposes of this permit the level 3 is the roof of the concrete permit and levels 3 through 7 are included in the building permit. Level 3 through 7 is type va construction built on top of 3 hour horizontal termination that is under separate permit. Square footage breakdown is the following- level 3 492 sq ft occupancy a3 construction type va level 3-7 95 4 sq ft occupancy r2 construction type va. Total area of work 95 932 sq ft. Applicant: Miranda Mendez | Permit type: Mechanical plan review | Permit id: Mech-2017-06239 | Parcel: 9270700050 | |||||
SCORE 100 Mu new heron flats and lofts- this building permit includes 5 stories of type v wood frame. Building permit includes: apartment courtyard at level 3 with interior and exterior assembly occupancy and accessory service mechanical rooms. For the purposes of this permit the level 3 is the roof of the concrete permit and levels 3 through 7 are included in the building permit. Level 3 through 7 is type va construction built on top of 3 hour horizontal termination that is under separate permit. Square footage breakdown is the following- level 3 492 sq ft occupancy a3 construction type va level 3-7 95 4 sq ft occupancy r2 construction type va. Total area of work 95 932 sq ft. Applicant: Miranda Mendez | Permit type: Mechanical plan review | Permit id: Mech-2017-06239 | |||||
SCORE 100 Sopa#48084 - new heron flats and lofts- install das cabling and head end customer paid for:(1) low voltage Applicant: James Pan | Permit type: Electrical - otc | Permit id: Elec-2017-03939 | |||||
SCORE 94 Heron flats and lofts- installation of fire alarm system for a type va over type ia apartment project. Smoke control system is required per city of redmond ordnance 2833. Date: October 6, 2017 Contractor: Wg Clark Construction Applicant: Kim Faust | Permit type: Fire installation | Permit id: Fire-2017-00061 | Parcel: 9270700050 | |||||
SCORE 100 Sopa #503 - heron flats & lofts illuminated signs - 206-909-6996 - electrical permit for sign permit # sign-2017-04377 signs are hooked up into existing electrical customer paid for:(5) illuminated signs Applicant: Shari Rust | Permit type: Electrical - otc | Permit id: Elec-2017-08319 | |||||
SCORE 100 Sopa#48084 - new heron flats and lofts- install das cabling and head end customer paid for:(1) low voltage Applicant: James Pan | Permit type: Electrical - otc | Permit id: Elec-2017-03939 | Parcel: 9270700050 | |||||
SCORE 100 The heron - install (1) streetlight pole base conduit and wire in to existing conduit and circuit done under the neighboring carter project. Light is located on 159th pl ne. Customer paid for (1) new circuit. Applicant: Andrew Hollenback | Permit type: Electrical - otc | Permit id: Elec-2017-06725 | Parcel: 9270700050 | |||||
SCORE 100 The heron - install (1) streetlight pole base conduit and wire in to existing conduit and circuit done under the neighboring carter project. Light is located on 159th pl ne. Customer paid for (1) new circuit. Applicant: Andrew Hollenback | Permit type: Electrical - otc | Permit id: Elec-2017-06725 | |||||
SCORE 89 Heron flats and lofts - level 1-3 - gas piping only for (4) water heaters (1) bbq and (1) firepit. Customer paid for (6) gas piping only. Applicant: Joseph Fiore | Permit type: Mechanical plan review | Permit id: Mech-2017-06306 | |||||
SCORE 86 Comm accessory struct - generator pad and fencing. Pad is 6 slab on grade fencing 9. 8 and approx 1. 5in taller then generator. Applicant: Jim Reinkens | Permit type: Commercial | Permit id: Bldg-2017-02499 | |||||
SCORE 100 Heron flats and lofts - install a total of (181) ventilation fans and associated duct work for residential venting in new mixed use building. Applicant: Miranda Mendez | Permit type: Mechanical plan review | Permit id: Mech-2017-03036 | |||||
SCORE 84 Mu new heron flats and lofts- approximately 95 932 sf of development consisting of apartments and an amenity space. (2) dry systems in parking garages combined wet & standpipe (2) buildings in level 3-7 residential design @0. Density. (1411) heads (3) riser supplies (1) standpipe systems Date: February 28, 2017 Contractor: Wolfe Fire Protection Inc Applicant: Charles Bamford | Permit type: Fire sprinkler - commercial | Permit id: Fire-2017-01080 | |||||
SCORE 100 Sopa - heron flats and lofts - 206-749-12 - install phone tv & data to 95 apartments customer paid for:(580) low voltage Applicant: Lance Nelson | Permit type: Electrical - otc | Permit id: Elec-2017-01717 | Parcel: 9270700050 | |||||
SCORE 100 Sopa#47654 - herons flatts - 253-872-5665 - installation of 45 low voltage thermostats and associated wiring. Customer paid for :(45) low voltage Applicant: Miranda Mendez | Permit type: Electrical - otc | Permit id: Elec-2017-03060 | Parcel: 9270700050 | |||||
SCORE 86 Heron flats generator - installation of a new 83 kw diesel generator. Applicant: Jim Reinkens | Permit type: Electrical plan review | Permit id: Elec-2017-02033 | Parcel: 9270700050 | |||||
SCORE 100 Mu new heron flats and lofts- install fire alarm smoke control panel two-way communication cctv and intercom access. Customer paid for (464) fire alarm & (40) low voltage. Applicant: Richard Mccurdy | Permit type: Electrical - otc | Permit id: Elec-2017-02787 | Parcel: 9270700050 | |||||
SCORE 86 Comm accessory struct - generator pad and fencing. Pad is 6 slab on grade fencing 9. 8 and approx 1. 5in taller then generator. Applicant: Jim Reinkens | Permit type: Commercial | Permit id: Bldg-2017-02499 | Parcel: 9270700050 | |||||
SCORE 84 Mu new heron flats and lofts- approximately 95 932 sf of development consisting of apartments and an amenity space. (2) dry systems in parking garages combined wet & standpipe (2) buildings in level 3-7 residential design @0. Density. (1411) heads (3) riser supplies (1) standpipe systems Date: February 28, 2017 Contractor: Wolfe Fire Protection Inc Applicant: Charles Bamford | Permit type: Fire sprinkler - commercial | Permit id: Fire-2017-01080 | Parcel: 9270700050 | |||||
SCORE 67 Heron flats and lofts- setting a 1000-gallon lp tank to power a heater for on-site construction. Level 1 Date: March 16, 2017 Contractor: Pacific Coast Energy Applicant: Drew Hallock | Permit type: Fire installation | Permit id: Fire-2017-01855 | Parcel: 9270700050 | |||||
SCORE 86 Heron flats generator - installation of (1) 2 gallon diesel storage tank for new 83 kw diesel generator. Date: March 29, 2017 Contractor: Wizard Electric Co Inc Applicant: Jim Reinkens | Permit type: Fire installation | Permit id: Fire-2017-02031 | Parcel: 9270700050 | |||||
SCORE 95 Mu new heron flats and lofts- installation of new fire alarm system - customer paid for (445) devices (1) transmitter (1) control panel & (5) power supply. Date: May 18, 2017 Contractor: Guardian Security Systems Inc Applicant: Richard Mccurdy | Permit type: Fire alarm | Permit id: Fire-2017-02786 | Parcel: 9270700050 | |||||
A new 6-story apartment building with 95 multi-family units including 5 live-work units. Date: September 6, 2017 Applicant: Kim Faust | Permit type: Water meter | Permit id: Wtr-2017-05583 | Parcel: 9270700050 | |||||
SCORE 81 Sopa #48363 - heron flats & lofts illuminated signs - 206-909-6996 - install signs (2) wall (1) blade (1) bracket Applicant: Shari Rust | Permit type: Sign | Permit id: Sign-2017-04377 | Parcel: 9270700050 | |||||
SCORE 100 Heron flats and lofts - install a total of (181) ventilation fans and associated duct work for residential venting in new mixed use building. Applicant: Miranda Mendez | Permit type: Mechanical plan review | Permit id: Mech-2017-03036 | Parcel: 9270700050 | |||||
SCORE 81 Sopa #48363 - heron flats & lofts illuminated signs - 206-909-6996 - install signs (2) wall (1) blade (1) bracket Applicant: Shari Rust | Permit type: Sign | Permit id: Sign-2017-04377 | |||||
SCORE 94 Heron flats and lofts- installation of fire alarm system for a type va over type ia apartment project. Smoke control system is required per city of redmond ordnance 2833. Date: October 6, 2017 Contractor: Wg Clark Construction Applicant: Kim Faust | Permit type: Fire installation | Permit id: Fire-2017-00061 | |||||
SCORE 100 Sopa - heron flats and lofts - 206-749-12 - install phone tv & data to 95 apartments customer paid for:(580) low voltage Applicant: Lance Nelson | Permit type: Electrical - otc | Permit id: Elec-2017-01717 | |||||
SCORE 67 Heron flats and lofts- setting a 1000-gallon lp tank to power a heater for on-site construction. Level 1 Date: March 16, 2017 Contractor: Pacific Coast Energy Applicant: Drew Hallock | Permit type: Fire installation | Permit id: Fire-2017-01855 | |||||
SCORE 86 Heron flats generator - installation of (1) 2 gallon diesel storage tank for new 83 kw diesel generator. Date: March 29, 2017 Contractor: Wizard Electric Co Inc Applicant: Jim Reinkens | Permit type: Fire installation | Permit id: Fire-2017-02031 | |||||
SCORE 89 Heron flats and lofts - level 1-3 - gas piping only for (4) water heaters (1) bbq and (1) firepit. Customer paid for (6) gas piping only. Applicant: Joseph Fiore | Permit type: Mechanical plan review | Permit id: Mech-2017-06306 | Parcel: 9270700050 | |||||
SCORE 100 Vrf on 6th and 7th floor split systems on lvl 1 live work units Applicant: Miranda Mendez | Permit type: Mechanical plan review | Permit id: Mech-2017-02357 | Parcel: 9270700050 |