Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 Repair sewer service from house to main Date: June 23, 2009 Contractor: Pipeline Industries Inc Client: Joseph Pennella | Applicant: Pipeline Industries, Inc | Permit type: Wastewater, right-of | Permit status: Iss | |||||
SCORE 95 Repair sewer service from house to main Date: June 23, 2009 Contractor: Pipeline Industries, Inc Client: Joseph Pennella | Permit type: Wastewater, right-of-way | Permit status: Iss | Permit id: Pmt2009-02361 | |||||
SCORE 86 Total tear-off & reroof of sfd, squares of asphalt shingles on a pitch represented as 4 12. All roof materials shall be installed per manufacturerfoots specs. Mid-roof inspection required if pitch is less than 4 12. Client: Horse Spotted | Permit type: Roofing | Permit status: Iss | Current use: Single family detached dwelling, existin | Permit id: Pmt2015-04002 |