Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
New construction permit Date: January 14, 2016 Client: Uber Street Developers Ll | Permit status: Completed | Permit id: 641611 | |||||
Suppression permit Date: May 11, 2016 Client: Uber Street Developers Ll | Permit status: Completed | Permit id: 680233 | |||||
Plumbing permit Date: June 13, 2016 Client: Uber Street Developers Ll | Permit status: Completed | Permit id: 684811 | |||||
Electrical permit Date: July 1, 2016 Client: Uber Street Developers Ll | Permit status: Completed | Permit id: 694646 | |||||
Mechanical permit Date: April 27, 2016 Client: Uber Street Developers Ll | Permit status: Completed | Permit id: 687600 | |||||
Administrative permit Date: August 12, 2016 Client: Uber Street Developers Ll | Permit status: Completed | Permit id: 708026 | |||||
Zoning/use permit Date: January 14, 2016 Client: Uber Street Developers Ll | Permit status: Completed | Permit id: 641605 | |||||
Plumbing permit Date: June 13, 2016 Client: Uber Street Developers Ll | Permit status: Completed | Permit id: 684811 | |||||
Administrative permit Date: August 12, 2016 Client: Uber Street Developers Ll | Permit status: Completed | Permit id: 708026 | |||||
Electrical permit Date: July 1, 2016 Client: Uber Street Developers Ll | Permit status: Completed | Permit id: 694646 | |||||
Mechanical permit Date: April 27, 2016 Client: Uber Street Developers Ll | Permit status: Completed | Permit id: 687600 | |||||
Zoning use permit Date: January 14, 2016 Client: Uber Street Developers Ll | Permit status: Completed | Permit id: 641605 | |||||
New construction permit Date: January 14, 2016 Client: Uber Street Developers Ll | Permit status: Completed | Permit id: 641611 | |||||
Suppression permit Date: May 11, 2016 Client: Uber Street Developers Ll | Permit status: Completed | Permit id: 680233 | |||||
For the erection of a four story structure with a roof deck accessed by a roof deck access structure. Structure for use as a three family dwelling. Building to be fully sprinklered. All work to be done per approved plans. If field conditions vary contact structural engineer prior to the start of any work. Separate permits required for mechanical, electrcial, plumbing and fire suppression work. Date: January 14, 2016 Client: Uber Street Developers Ll | Permit type: New construction permit | Permit status: Completed | Completion date: September 7, 2016 | Permit id: 641611 | |||||
For the erection of an attached structure with a roof deck accessed by a roof deck access structure. Size and location as shown per application plan. Structure for use as a multi-family household living (three dwelling units). Date: January 14, 2016 Client: Uber Street Developers Ll | Permit type: Zoning/use permit | Permit status: Completed | Completion date: July 11, 2016 | Permit id: 641605 | |||||
SCORE 93 Installation of automatic sprinkler system with two inch (2") fire service line, backflow prevention device and fire department connection throughout a four (4) story structure with pilot house and basement (3-family dwelling). Separate permits required for all plumbing and electrical work. Date: May 11, 2016 Contractor: Advantage Fire Protection Llc Client: Uber Street Developers Ll | Permit type: Suppression permit | Permit status: Completed | Completion date: September 16, 2016 | Permit id: 680233 | |||||
SCORE 79 New construction:exterior & interior plumbing for a 4-story building which includes a pilot house on the roof, with (3) dwelling units. Work includes curb trap,fai,main drain, 5" combined sewer lateral & 1" domestic water distribution service.(multi family). Self certifications are no longer permitted","all excavations and plumbing trenches in excess of 5 ft in depth must have approved shoring in place at the time of inspection". The installation will comply with the philadelphia plumbing code, 2004. Date: June 13, 2016 Contractor: Lenny De La Cuz Client: Uber Street Developers Ll | Permit type: Plumbing permit | Permit status: Completed | Completion date: September 16, 2016 | Permit id: 684811 | |||||
For the amendment of ap#641611 to create exterior wall openings on the front facade for proposed balconies as shown per approved plans. Original permit approved for the erection of a four story structure with a roof deck accessed by a roof deck access structure. Structure for use as a three family dwelling. Building to be fully sprinklered. All work to be done per approved plans. If field conditions vary contact structural engineer prior to the start of any work. Separate permits required for mechanical, electrcial, plumbing and fire suppression work. Date: August 12, 2016 Client: Uber Street Developers Ll | Permit type: Administrative permit | Permit status: Completed | Completion date: September 16, 2016 | Permit id: 708026 | |||||
SCORE 100 400amp service as per nec 2008 & install fire alarm system as per nfpa 72 cc district Date: July 1, 2016 Contractor: Amptron Corp Client: Uber Street Developers Ll | Permit type: Electrical permit | Permit status: Completed | Completion date: September 7, 2016 | Permit id: 694646 | |||||
SCORE 89 Ez permit ductwork & warm-air appliances- for the installation of new ductwork, registers grilles diffusers, and warm-air appliances as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: April 27, 2016 Contractor: Silvis Construction Llc Client: Uber Street Developers Ll | Permit type: Mechanical permit | Permit status: Completed | Completion date: September 16, 2016 | Permit id: 687600 |