Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Alteration permit Date: August 16, 2010 Client: Walsh Joseph | Permit status: Completed | Permit id: 287305 | |||||
Electrical permit Date: June 23, 2010 Client: Walsh Joseph | Permit status: Completed | Permit id: 287287 | |||||
Alteration permit Date: August 16, 2010 Client: Walsh Joseph | Permit status: Completed | Permit id: 287305 | |||||
Electrical permit Date: June 23, 2010 Client: Walsh Joseph | Permit status: Completed | Permit id: 287287 | |||||
SCORE 89 Install a 3. 69-watt roof mount,grid tied,solar panel system. See attached plot plan and system line diagram. This system is to be installed on soild sawn lumber roof system, deviation will require an amended permit. All work shall comply with the manufactures specifications. Date: August 16, 2010 Contractor: Mercury Solar Systems Inc Client: Walsh Joseph | Permit type: Alteration permit | Permit status: Completed | Completion date: September 21, 2010 | Permit id: 287305 | |||||
SCORE 100 Installing a 3. 69 kw soair array to 2 strings of 9 ge 205s->junction box,->dc disco to pv powered 35 inverter 240v pv meter to 240v 30v ac disco to exist 240v main pnl with 125a bos to new peco in meter to existing peco out meter as per 2008 nec Date: June 23, 2010 Contractor: Robert Monk Client: Walsh Joseph | Permit type: Electrical permit | Permit status: Completed | Completion date: September 16, 2010 | Permit id: 287287 |