Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 93 Installation of 22 kw generator and a transfer switch. Install gas line. Install electrical from transfer switch to generator. Must be at least 3 feet of side property line. Permit type: Renovation (non-structural) | Permit status: Certificate of occupancy | Current use: Single family | |||||
SCORE 98 Install generator transfer switch and wiring from transfer switch to generator ![]() ![]() Permit type: Electrical repair / replacement / addition | Permit status: Certificate of completion | Current use: Single family | |||||
SCORE 98 Installation of 22 kw generator and new gas line from meter ![]() ![]() Permit type: Mechanical fuel gas | Permit status: Certificate of completion | Current use: Single family | |||||
SCORE 89 Installation of 22 kw generator and a transfer switch. Install gas line. Install electrical from transfer switch to generator. Must be at least 3 feet of side property line. Permit type: Renovation (non-structural) | Permit status: Certificate of occupancy | Current use: Single family |