Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 89 Install signage mounted into a gate surround on the dauphine street side of the property, lettering in the street facade and art glass over the dauphine side entrance as well as various temporary directional signs. Date: May 10, 2016 Contractor: Rick A. Fifield Permit type: Attached sign | Permit status: Permit issued | Current use: Not applicable - oversize load transport | |||||
SCORE 56 Certificate of occupancy for "marigny opera house" issued pursuant to court order (cdc docket 2014-11102). Side exit door and ramp operational. Sfm review completed. Fire alarm and required repairs completed. Maximum occupancy: 299 persons. Use classification: church reference 14-37640 Date: June 23, 2015 Contractor: David B Hurlbert Client: Scott R King | Permit type: Co no work | Permit status: Certificate of occupancy | Current use: Business use | |||||
SCORE 89 Construct an exit door and awning on an existing church as per drawings submitted 7/28/14. Max occupancy 299 Permit type: Renovation (non-structural) | Permit status: Certificate of completion | Current use: Single family | |||||
SCORE 56 Temporary certificate of occupancy for "marigny opera house" issued pursuant to court order (cdc docket 2014-11102). Rear exit door and all gates in rear yard fence to be available for use and unlocked during all events, meetings, or other gatherings open to the public. Maximum occupancy: 1 persons. Temporary occupancy authorized through june 5, 2015. Use classification: church. Date: December 5, 2014 Contractor: Scott R King Client: Scott R King | Permit type: Temporary co | Permit status: Permit approved | Current use: Not applicable - oversize load transport | |||||
SCORE 89 Construct an exit door and awning on an existing church as per drawings submitted 7 28 14. Max occupancy 299 Permit type: Renovation (non-structural) | Permit status: Certificate of completion | Current use: Single family |