Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Plumbing permit Date: September 1, 2010 Client: Steck Robert Scollon Kelsey Lynn | Permit status: Completed | Permit id: 299298 | |||||
Electrical permit Date: June 19, 2014 Client: Steck Robert Scollon Kelsey Lynn | Permit status: Completed | Permit id: 543781 | |||||
Zoning permit Date: October 29, 2014 Client: Steck Robert Scollon Kelsey Lynn | Permit status: Completed | Permit id: 504093 | |||||
Addition permit Date: November 20, 2014 Client: Steck Robert Scollon Kelsey Lynn | Permit status: Completed | Permit id: 568390 | |||||
Permit the erection of an addition, a covered front porch, and a covered rear porch to the principal building (size and location to be as shown in the application), and the erection of two (2) additions to the accessory detached garage (size and location to be as shown in the application) to an existing detached single family dwelling. Date: January 7, 2014 Client: Steck Robert Scollon Kelsey Lynn | Applicant: John Andrews | Permit type: Appeal | Permit status: Granted | Completion date: May 2, 2014 | Permit id: 21989 | |||||
Electrical permit Date: June 19, 2014 Client: Steck Robert Scollon Kelsey Lynn | Permit status: Completed | Permit id: 543781 | |||||
Plumbing permit Date: September 1, 2010 Client: Steck Robert Scollon Kelsey Lynn | Permit status: Completed | Permit id: 299298 | |||||
Zoning permit Date: October 29, 2014 Client: Steck Robert Scollon Kelsey Lynn | Permit status: Completed | Permit id: 504093 | |||||
Addition permit Date: November 20, 2014 Client: Steck Robert Scollon Kelsey Lynn | Permit status: Completed | Permit id: 568390 | |||||
Permit the erection of an addition, a covered front porch, and a covered rear porch to the principal building (size and location to be as shown in the application), and the erection of two (2) additions to the accessory detached garage (size and location to be as shown in the application) to an existing detached single family dwelling. Date: January 7, 2014 Client: Steck Robert Scollon Kelsey Lynn | Applicant: John Andrews | Permit type: Appeal | Permit status: Granted | Completion date: May 2, 2014 | Permit id: 21989 | |||||
SCORE 100 Replace water heater Date: September 1, 2010 Contractor: 1 8 Heaters Inc Client: Teran David R Teran Stephanie | Permit type: Plumbing permit | Permit status: Completed | Completion date: September 28, 2010 | Permit id: 299298 | |||||
The proposed project has several parts. Renovate and add on the existing sfd by adding a new covered front and back porch with outdoor fireplace and a new second floor to replace existing. Modify existing detached garage by adding a shes to the back of it. New small overhang to the front of it and new open but roofed over area to the side of it facing into the back yard with outdoor cookinf feautures. Fencing around the perimeter of the back yard. Inground pool in the future. Date: October 29, 2014 Client: Teran David R Teran Stephanie | Permit type: Zoning permit | Permit status: Completed | Completion date: October 29, 2014 | Permit id: 504093 | |||||
Remove existing flat roof. Construct gable style roof for existing one (1) story detached garage. Proposed gable roof shall be designed and constructed in accordance with section 802. 2 of the 2009 irc. Date: November 20, 2014 Client: Teran David R Teran Stephanie | Permit type: Addition permit | Permit status: Completed | Completion date: February 26, 2015 | Permit id: 568390 | |||||
SCORE 100 Replace 100a service in kind; 14- circuits.... In accordance with 2008 nec for a one family building Date: June 19, 2014 Contractor: Kelleher Electrical Client: Teran David R Teran Stephanie | Permit type: Electrical permit | Permit status: Completed | Completion date: September 15, 2014 | Permit id: 543781 |